SSD Modifications
Determination
Modification 5 - Changes to landscaping and tunnel link alignment
Hornsby Shire
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
Changes to the Stage 2 project boundary resulting in the relocation and redesign of landscaped areas and the realignment of the tunnel link and covered walkway connecting the Stage 2 Main Building to the Mental Health Facility.