Skip to main content

Part4

Determination

Bullecourt Place, Ultimo - Two Buildings

City of Sydney

Current Status: Determination

Attachments & Resources

Determination (2)

Approved Documents

There are no post approval documents available

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

Fire Safety Order issued to 444 Harris Street, Ultimo (DA 382-12-2001-I, as modified, Sydney LGA)

On 14 July 2020, the Department issued a Fire Safety Order to the owners of the building at 444 Harris Street, Ultimo, to remove identified external wall panels on the building consisting of Aluminium Composite Panels (ACP). ACP is combustible and poses a fire safety risk. The owner is required to replace the ACP with a non – combustible product and provide an inspection report issued by an accredited certifier, certifying that the replacement panels and method of installation comply with the Building Code of Australia. The owner is required to develop and implement fire safety measures to reduce the fire safety risks associated with the cladding until the rectification work is complete.

Inspections

There are no inspections for this project.

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Project Details

Application Number
DA382-12-2001-I
Assessment Type
Part4
Development Type
Residential & Commercial
Local Government Areas
City of Sydney
Decision
Approve
Determination Date
Decider
Minister