Skip to main content

State Significant Development

Determination

Gullen Range Wind Farm

Upper Lachlan Shire

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Assessment
  6. Recommendation
  7. Determination

Modifications

Determination

Archive

DGRs (3)

EA (21)

Response to Submissions (1)

Determination (9)

Approved Documents

Management Plans and Strategies (1)

Reports (5)

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

Penalty Notice issued to Goldwind Australia Pty Ltd (MP07_0118) Upper Lachlan Shire LGA 

On 27 September 2022, the department issued a $15,000 Penalty Notice to Goldwind Australia Pty Ltd (Goldwind) as the company who has control and management of the Gullen Range Wind Farm, for operating a small number of turbines at times that contravened the conditions of consent imposed to protect the Powerful Owl. There is no evidence to suggest that any Powerful Owls were affected by the breach. Goldwind admitted to the breach and have since implemented measures to ensure that future non-compliances do not occur. The department will continue to monitor compliance with conditions of approval.

Inspections

27/09/2022

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Project Details

Application Number
MP07_0118
Assessment Type
State Significant Development
Local Government Areas
Upper Lachlan Shire
Decision
Approved
Determination Date
Decider
Minister
Last Modified By
MP07_0118-Mod-1
Last Modified On
07/09/2015

Contact Planner

Name
James Archdale