State Significant Development
McPhillamys Gold Project
Blayney Shire
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Development of an open cut mine and water supply pipeline.
Modifications
Archive
Request for SEARs (1)
SEARs (3)
EIS (36)
Response to Submissions (10)
Agency Advice (61)
Amendments (37)
Additional Information (23)
Recommendation (2)
Determination (3)
Approved Documents
Management Plans and Strategies (4)
Community Consultative Committees and Panels (2)
Other Documents (2)
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
There are no enforcements for this project.
Inspections
There are no inspections for this project.
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.
Submissions
ROGER HAMER
Support
ROGER HAMER
Emma Harrison
Object
Emma Harrison
Message
The vast majority of Australia is in the grip of drought, claimed by some to be the most severe and widespread in recorded history. Most expert opinion is that, due to the now unavoidable climate change caused by global warming, such droughts are going to become the new normal. This will result in reduced rainfall, increased evaporation, and consequent scarcity of water for all purposes, including farming, on which we all depend for food production. Yet this project is seriously proposing to construct a tailings dam, full of potentially toxic sludge, on top of the headwaters of one of the few rivers in the country still in reasonable condition.
Tailings dams have been known to fail, with catastrophic consequences. Destroying this agricultural area for a 15 year project to extract gold at a concentration of perhaps 1.05gm/tonne, producing 60m+ tonnes of waste, and leaving a destroyed landscape and toxic legacy that will last forever just cannot be justified to produce a metal that will likely end up as jewellery, or be locked away as bullion. No doubt the financiers and engineers who are promoting and designing this project are highly skilled, but the risks posed by this project are way out of proportion with the benefit to be gained for the country as a whole.
The use of cyanide to process the gold from ore and then pumped into the tailings dam. Cyanide has been banned in nine countries, Korea, Ecuador, Argentina, Costa Rica, the Czech Republic, Greece, Turkey, Germany and Hungary and some US states and poses a dangerous and toxic threat to the water and land in the region.
Inevitable contamination of the Belubula and Lachlan Rivers, due to seepage though groundwater flows from the tailings dam
Traffic problems and caused by the continuous stream of heavy vehicles, and light vehicles at shift changes
The blot on the landscape caused by the “amenity bunds” and dust
Loss of natural land and environment for wildlife, and the impact of toxicity on surrounding wildlife
Noise, dust, vibrations, particulate pollution from diesel fumes, light pollution 7 days a week and 24 hours a day
The noise, vibrations and risks posed by regular explosions permitted for 12 hours a day. This will impact live stock and dometic animals on neighbouring properties and could damange heritage buildings
Permanent degradation of prime agricultural land and scenery
Loss of trees including high altitude yellow box that may be 200 years old
Impact on bee population due to loss of ground flora and contaminated water
Loss of the forest where the mine is proposed that is considered an ecologically endangered community as defined by the NSW Office of Environment and Heritage
The high probability that the developer will not be willing or able to rehabilitate the site when the mine eventually becomes unviable, as has happened so many times in the history of mining
The whole project proposes less than 1000 short terms jobs. Other industries in this area, with support a more diversified and resilient economy including tourism, renewables and sustainable agriculture offer far more employment.
As a local childcare centre owner I am incredibly concerned for the future for our children and the contamination of our drinking water.
Name Withheld
Support
Name Withheld
Message
Attachments
Name Withheld
Support
Name Withheld
Name Withheld
Support
Name Withheld
Message
Attachments
Jen Ringbauer
Object
Jen Ringbauer
Message
I believe that any amount of design and knowledge is not enough to trust the amount of toxicity to be stored for hundreds of years over such an important water supply. The springs feeding the Belubula river, the aquifers and the river itself are not worth risking for any amount of gold.
Water is precious to all life - Gold is only precious to humans.
Name Withheld
Object
Name Withheld
Message
The vast majority of Australia is in the grip of drought, claimed by some to be the most severe and widespread in recorded history. Most expert opinion is that, due to the now unavoidable climate change caused by global warming, such droughts are going to become the new normal. This will result in reduced rainfall, increased evaporation, and consequent scarcity of water for all purposes, including farming, on which we all depend for food production. Yet this project is seriously proposing to construct a tailings dam, full of potentially toxic sludge, on top of the headwaters of one of the few rivers in the country still in reasonable condition.
Tailings dams have been known to fail, with catastrophic consequences. Destroying this agricultural area for a 15 year project to extract gold at a concentration of perhaps 1.05gm/tonne, producing 60m+ tonnes of waste, and leaving a destroyed landscape and toxic legacy that will last forever just cannot be justified to produce a metal that will likely end up as jewellery, or be locked away as bullion. No doubt the financiers and engineers who are promoting and designing this project are highly skilled, but the risks posed by this project are way out of proportion with the benefit to be gained for the country as a whole.
Some towns in NSW are about to run out of water. It is morally problematic to say the least that water has been turned into a commodity in this country rather than an essential resource to which everybody has a right and human and animal interests are considered higher than the profits of organisations.
The use of cyanide to process the gold from ore and then pumped into the tailings dam. Cyanide has been banned in nine countries, Korea, Ecuador, Argentina, Costa Rica, the Czech Republic, Greece, Turkey, Germany and Hungary and some US states and poses a dangerous and toxic threat to the water and land in the region.
Inevitable contamination of the Belubula and Lachlan Rivers, due to seepage through groundwater flows from the tailings dam
Traffic problems and caused by the continuous stream of heavy vehicles, and light vehicles at shift changes
The blot on the landscape caused by the “amenity bunds” and dust
Loss of natural land and environment for wildlife, and the impact of toxicity on surrounding wildlife
Noise, dust, vibrations, particulate pollution from diesel fumes, light pollution 7 days a week and 24 hours a day
The noise, vibrations and risks posed by regular explosions permitted for 12 hours a day. This will impact livestock and domestic animals on neighbouring properties and could damage heritage buildings
Permanent degradation of prime agricultural land and scenery
Loss of trees including high altitude yellow box that may be 200 years old
Impact on bee population due to loss of ground flora and contaminated water
Loss of the forest where the mine is proposed that is considered an ecologically endangered community as defined by the NSW Office of Environment and Heritage
The high probability that the developer will not be willing or able to rehabilitate the site when the mine eventually becomes unviable, as has happened so many times in the history of mining
The whole project proposes less than 1000 short terms jobs. Other industries in this area, with support a more diversified and resilient economy including tourism, renewables and sustainable agriculture offer far more employment.
Name Withheld
Support
Name Withheld
Brendan Scott
Object
Brendan Scott
Message
Name Withheld
Object
Name Withheld
Message
• Tailings dams have been known to fail, with catastrophic consequences. Destroying this agricultural area for a 15 year project to extract gold at a concentration of perhaps 1.05gm/tonne, producing 60m+ tonnes of waste, and leaving a destroyed landscape and toxic legacy that will last forever just cannot be justified to produce a metal that will likely end up as jewellery, or be locked away as bullion. No doubt the financiers and engineers who are promoting and designing this project are highly skilled, but the risks posed by this project are way out of proportion with the benefit to be gained for the country as a whole.
• Some towns in NSW are about to run out of water. It is morally problematic, to say the least, that water has been turned into a commodity in this country rather than an essential resource to which everybody has a right and human and animal interests are considered higher than the profits of organisations.
• The use of cyanide to process the gold from ore and then pumped into the tailings dam. Cyanide has been banned in nine countries, Korea, Ecuador, Argentina, Costa Rica, the Czech Republic, Greece, Turkey, Germany and Hungary and some US states and poses a dangerous and toxic threat to the water and land in the region.
• Inevitable contamination of the Belubula and Lachlan Rivers, due to seepage through groundwater flows from the tailings dam
• Traffic problems and caused by the continuous stream of heavy vehicles, and light vehicles at shift changes
• The blot on the landscape caused by the “amenity bunds” and dust
• Loss of natural land and environment for wildlife, and the impact of toxicity on surrounding wildlife
• Noise, dust, vibrations, particulate pollution from diesel fumes, light pollution 7 days a week and 24 hours a day
• The noise, vibrations and risks posed by regular explosions permitted for 12 hours a day. This will impact livestock and domestic animals on neighbouring properties and could damage heritage buildings
• Permanent degradation of prime agricultural land and scenery
• Loss of trees including high altitude yellow box that may be 200 years old
• Impact on bee population due to loss of ground flora and contaminated water
• Loss of the forest where the mine is proposed that is considered an ecologically endangered community as defined by the NSW Office of Environment and Heritage
• The high probability that the developer will not be willing or able to rehabilitate the site when the mine eventually becomes unviable, as has happened so many times in the history of mining
• The whole project proposes less than 1000 short terms jobs.
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
Sarah Bradbury
Object
Sarah Bradbury
Message
The vast majority of Australia is in the grip of drought, claimed by some to be the most severe and widespread in recorded history. Most expert opinion is that, due to the now unavoidable climate change caused by global warming, such droughts are going to become the new normal. This will result in reduced rainfall, increased evaporation, and consequent scarcity of water for all purposes, including farming, on which we all depend for food production. Yet this project is seriously proposing to construct a tailings dam, full of potentially toxic sludge, on top of the headwaters of one of the few rivers in the country still in reasonable condition.
• Some towns in NSW are about to run out of water. It is morally problematic, to say the least, that water has been turned into a commodity in this country rather than an essential resource to which everybody has a right and human and animal interests are considered higher than the profits of organisations.
• Permanent degradation of prime agricultural land and scenery
• Loss of trees including high altitude yellow box that may be 200 years old
• Impact on bee population due to loss of ground flora and contaminated water
• Tailings dams have been known to fail, with catastrophic consequences. Destroying this agricultural area for a 15 year project to extract gold at a concentration of perhaps 1.05gm/tonne, producing 60m+ tonnes of waste, and leaving a destroyed landscape and toxic legacy that will last forever just cannot be justified to produce a metal that will likely end up as jewellery, or be locked away as bullion. No doubt the financiers and engineers who are promoting and designing this project are highly skilled, but the risks posed by this project are way out of proportion with the benefit to be gained for the country as a whole.
• The use of cyanide to process the gold from ore and then pumped into the tailings dam. Cyanide has been banned in nine countries, Korea, Ecuador, Argentina, Costa Rica, the Czech Republic, Greece, Turkey, Germany and Hungary and some US states and poses a dangerous and toxic threat to the water and land in the region.
• Inevitable contamination of the Belubula and Lachlan Rivers, due to seepage through groundwater flows from the tailings dam
• Traffic problems and caused by the continuous stream of heavy vehicles, and light vehicles at shift changes
• The blot on the landscape caused by the “amenity bunds” and dust
• Loss of natural land and environment for wildlife, and the impact of toxicity on surrounding wildlife
• Noise, dust, vibrations, particulate pollution from diesel fumes, light pollution 7 days a week and 24 hours a day
• The noise, vibrations and risks posed by regular explosions permitted for 12 hours a day. This will impact livestock and domestic animals on neighbouring properties and could damage heritage buildings
• Loss of the forest where the mine is proposed that is considered an ecologically endangered community as defined by the NSW Office of Environment and Heritage
• The high probability that the developer will not be willing or able to rehabilitate the site when the mine eventually becomes unviable, as has happened so many times in the history of mining
• The whole project proposes less than 1000 short terms jobs. Other industries in this area, with support a more diversified and resilient economy including tourism, renewables and sustainable agriculture offer far more employment.
Name Withheld
Object
Name Withheld
Message
2. I object to the destruction and reduction of old growth endangered tree species e.g. White Box, Yellow Box and Blakely's Red Gum and in turn the destruction 77.5 HA of Koala foraging area and habitat in a Known Koala area. I also object to the destruction and removal of habitat of the Squirrel Gliders that have been identified as living in the Project area. I also don't believe that there should be any further reduction of the biodiversity in this area as it has been fragmented enough.
3. I object to the importation of salty water from Lithgow Mining area that is not suitable for the Cox's River catchment and being piped into the project area building up a toxic environment in a closely settled area and close to the Belubula River, with a high likelihood of contamination and leaching of contaminates into the local ground water and river system.
4. I object to the destruction of good agricultural land and the reduction of the productiveness of this land for generations to come when there is a growing need for agriculture for a growing population.
5. I object to the unfair and unnecessary impact on the residents surrounding the project area that will be negatively impacted both Physically, emotionally, mentally and financially, Due to this proposed mine.
Name Withheld
Object
Name Withheld
Message
Richard Beach
Object
Richard Beach
Message
Elizabeth Diprose
Object
Elizabeth Diprose
Message
Name Withheld
Support
Name Withheld
Crown Lands
Comment
Crown Lands
Message
As mentioned in Section 3.3.10 an application for an easement across Crown land for the pipeline will be required to be submitted to the Department for assessment with some potential native title considerations.
A number of Crown roads will require closing and purchasing. Part of the Crown waterway tributary for the Belubula River will also be impacted by the infrastructure and will also be required to be purchased by the Applicant.
It is noted that there are Crown land parcels adjacent to the Project and have the potential to be impacted thus reducing there viability for tenure in the future. The Applicant is currently in discussion with the Department regarding the relevant Crown land.