Skip to main content

State Significant Development

Determination

Narrabri Gas - Dewhurst Exploration

Narrabri Shire

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Consolidated Consent

Consolidated Consent

Modifications

Determination
Determination
Determination

Archive

Application (2)

Request for DGRS (1)

DGRs (1)

EIS (8)

Agency Submissions (11)

Response to Submissions (9)

Recommendation (2)

Determination (2)

Approved Documents

Reports (2)

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

There are no inspections for this project.

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 1 - 20 of 213 submissions
Annette Dean
Object
Worrigee , New South Wales
Message
I submit that the coal seam gas industry will seriously jeopardise the future for my grandchildren. It will industrialise an agricultural area and destroy the tourist industry. The 2km buffer zone does nothing to protect the lives of both humans and animals as we know from the experience of those in Tara, Queensland where many children are suffering severe health problems which were not present before the gas fields surrounded them.
Also the right of landholders NOT to have wells on their properties means nothing, when people are being seriously affected by gas wells more than 5kms away from their properties. This is without considering the constant problem of heavy machinery traffic, 24/7 lights and compressor noise, fugitive gas emissions and depletion of their bore water.
Also in regard to the 2km buffer zone from horse studs etc., what about dairy cattle, sheep and crops?
We have enough gas reserves in the Bass Straights to provide for our domestic use for years to come. We should not jeopardise all that is precious to Australia for the sake of an overseas market
ROSIE Scott
Object
Sydney , New South Wales
Message
The new coal seam gas wells known as triple-stacked horizontal wells have inherent risks involved due to the re-drilling of wells and the inability to seal off the groundwater from contamination. This will mean the further destruction of the vitally important Pilliga Forest. This should not be allowed
Julia Read
Object
Blackburn , Victoria
Message
I am very concerned about Santos exploration in Pilliga Forest. They have already done damage by previous testing which was not carried out carefully and left harmful residues which killed wildlife. This forest should be protected and the planned mining would certainly do damage to it. The Pilliga Mouse only lives in the Pilliga Forest and its habitat would be destroyed if coal seam gas is fracked and mined. Please do not go ahead with this plan. Destroying the natural environment is very easy but when plants and animals become extinct they can't be brought back. This is a time when we must protect our environment from further degradation.
Dorte Planert
Object
Tathra , New South Wales
Message
I object to the new Coal Seam Gas Project in the Pilliga Forest.
The new coal seam gas wells known as triple-stacked horizontal wells have inherent risks involved due to the re-drilling of wells and the inability to seal off the groundwater from contamination. Please protect the beautiful Pilliga Forest, a refuge for so many threatened birds, marsupials and wildflowers.
Santos has failed to meet the Director General Requirements for this project!
RESPONSE TO THE DIRECTOR GENERAL REQUIREMENTS:
TRIPLE-STACKED HORIZONTAL WELLS -
* The `Triple Stacked' drilling of horizontal coal seam gas wells through the casing of the existing wells, at Dewhurst 13-18H and 31 poses great danger to the Great Artesian Basin and other aquifers as it is very difficult, if not impossible, to seal the junction between the casing and the lateral.
* When questioned about sealing these junctions in July this year, NSW Chief Scientist Professor Mary O'Kane said she had been told by Santos that they had difficulty sealing these junctions known as Kick Off Points (KOPs). It is clear that Santos hold little concern for the pollution of aquifers by either drill fluids or gas escapes and the down draining of aquifers.
ECONOMICS -
* The assessment that has been done doesn't take into account any costs of the project, only claimed benefits. This approach has been labelled as "biased", "abused" and "deficient" by the ABS, Productivity Commission and Land and Environment Court respectively and doesn't comply with DGRs.
* DGRs call for a demonstration of "net benefit" to the NSW community. To an economist, this is a clear call for cost benefit analysis. There is no cost benefit analysis in the EIS. NSW Treasury and Department of Planning put out guidelines in Nov last year specifically to guide cost benefit analysis of mining and CSG projects. These have not been followed.
WATER -
* The drilling of these wells will produce an additional 331 and 413 megalitres over three years for the operation of Dewhurst 13-18H and Dewhurst 26-31 pilots, respectively of highly saline water containing heavy-metals and petrochemicals. Santos still do not have approval for any long-term sustainable management of this toxic produced water that poses a huge threat to the local creeks and groundwater from spills.
* In addition despite the risks posed by the new tri-lateral wells there is no established baseline data for the important groundwater systems underlying the Pilliga such as the recharge zone for the Great Artesian Basin. The aquifer monitoring bores required to do this have not yet been constructed.
* In addition, the cumulative water model used by Santos lacks the basic data required to assess the impacts of drilling for coal seam gas on groundwater in the future.
BIODIVERSITY -
* The further drilling required for these wells could be death by a thousand cuts for the Federal and State listed threatened species that live in the Pilliga Forest. These include the Pilliga Mouse (found only in the Pilliga), Koala's, the Black Striped Wallaby, Eastern Pygmy Possum and many more. The Pilliga is also a haven for birdlife, including the internationally protected Rainbow Bee-eater.
* Santos have admitted that their CSG exploration will destroy habitat for the Pilliga Mouse. The breeding status and population dynamics of the threatened species in the Pilliga are very poorly understood. There must be baseline ecological surveys to assess the population dynamics and status of the Pilliga Mouse and other threatened species.
AIR QUALITY -
The baseline atmospheric methane data collection against which to assess any future potential fugitive emissions and Independent Health Impact Assessment of north-west NSW to establish baseline health data and air quality information has not yet been conducted.
GREEN-HOUSE GASES -
The latest studies of unconventional gas drilling from Harvard University have suggest gas emissions from drilling and fracking are 50% worse than previously though. A 2012 study by researchers at the Southern Cross University found significant amounts of methane appeared to be leaking from the country's largest coal-seam field, near Condamine on Queensland's Western Downs.
HAZARDS -
The Pilliga is highly susceptible to fires, largely due to the high incidence of ironstone attracting lightning strikes. It is not unusual for the Rural Fire Service to record up to 1000 over a 24 hour period in the Pilliga region. Santos does not appear to have a clear bushfire strategy, especially for gas flaring which cannot be shut down on catastrophic fire days.
HERITAGE -
It is extremely disappointing that Aboriginal Heritage requirements for were taken out of the Director General Requirements. The Gomeroi Traditional Owners of the Pilliga Forest have an ongoing connection to the Pilliga Forest through `song-lines', sacred sites, bush-medicine and cultural practices. To not include an Aboriginal Cultural Heritage assessment is denying the rights of the Gomeroi Nation to have their traditional knowledge considered as part of this Planning proposal.
Pilliga Forest is a national icon and no place for coal seam gas fields.
Amy Harlib
Object
New York ,
Message
RESPONSE TO THE DIRECTOR GENERAL REQUIREMENTS:

TOTALLY BAN ALL DRILLING AND FRACKING EVERYWHERE,FOREVER, NOW! STOP THIS SUICIDALLY INSANE POISONING OF OUR WATER, AIR AND LAND.

TRIPLE-STACKED HORIZONTAL WELLS -
* The `Triple Stacked' drilling of horizontal coal seam gas wells through the casing of the existing wells, at Dewhurst 13-18H and 31 poses great danger to the Great Artesian Basin and other aquifers as it is very difficult, if not impossible, to seal the junction between the casing and the lateral.
* When questioned about sealing these junctions in July this year, NSW Chief Scientist Professor Mary O'Kane said she had been told by Santos that they had difficulty sealing these junctions known as Kick Off Points (KOPs). It is clear that Santos hold little concern for the pollution of aquifers by either drill fluids or gas escapes and the down draining of aquifers.
ECONOMICS -
* The assessment that has been done doesn't take into account any costs of the project, only claimed benefits. This approach has been labelled as "biased", "abused" and "deficient" by the ABS, Productivity Commission and Land and Environment Court respectively and doesn't comply with DGRs.
* DGRs call for a demonstration of "net benefit" to the NSW community. To an economist, this is a clear call for cost benefit analysis. There is no cost benefit analysis in the EIS. NSW Treasury and Department of Planning put out guidelines in Nov last year specifically to guide cost benefit analysis of mining and CSG projects. These have not been followed.
WATER -
* The drilling of these wells will produce an additional 331 and 413 megalitres over three years for the operation of Dewhurst 13-18H and Dewhurst 26-31 pilots, respectively of highly saline water containing heavy-metals and petrochemicals. Santos still do not have approval for any long-term sustainable management of this toxic produced water that poses a huge threat to the local creeks and groundwater from spills.
* In addition despite the risks posed by the new tri-lateral wells there is no established baseline data for the important groundwater systems underlying the Pilliga such as the recharge zone for the Great Artesian Basin. The aquifer monitoring bores required to do this have not yet been constructed.
* In addition, the cumulative water model used by Santos lacks the basic data required to assess the impacts of drilling for coal seam gas on groundwater in the future.
BIODIVERSITY -
* The further drilling required for these wells could be death by a thousand cuts for the Federal and State listed threatened species that live in the Pilliga Forest. These include the Pilliga Mouse (found only in the Pilliga), Koala's, the Black Striped Wallaby, Eastern Pygmy Possum and many more. The Pilliga is also a haven for birdlife, including the internationally protected Rainbow Bee-eater.
* Santos have admitted that their CSG exploration will destroy habitat for the Pilliga Mouse. The breeding status and population dynamics of the threatened species in the Pilliga are very poorly understood. There must be baseline ecological surveys to assess the population dynamics and status of the Pilliga Mouse and other threatened species.
AIR QUALITY -
The baseline atmospheric methane data collection against which to assess any future potential fugitive emissions and Independent Health Impact Assessment of north-west NSW to establish baseline health data and air quality information has not yet been conducted.
GREEN-HOUSE GASES -
The latest studies of unconventional gas drilling from Harvard University have suggest gas emissions from drilling and fracking are 50% worse than previously though. A 2012 study by researchers at the Southern Cross University found significant amounts of methane appeared to be leaking from the country's largest coal-seam field, near Condamine on Queensland's Western Downs.
HAZARDS -
The Pilliga is highly susceptible to fires, largely due to the high incidence of ironstone attracting lightning strikes. It is not unusual for the Rural Fire Service to record up to 1000 over a 24 hour period in the Pilliga region. Santos does not appear to have a clear bushfire strategy, especially for gas flaring which cannot be shut down on catastrophic fire days.
HERITAGE -
It is extremely disappointing that Aboriginal Heritage requirements for were taken out of the Director General Requirements. The Gomeroi Traditional Owners of the Pilliga Forest have an ongoing connection to the Pilliga Forest through `song-lines', sacred sites, bush-medicine and cultural practices. To not include an Aboriginal Cultural Heritage assessment is denying the rights of the Gomeroi Nation to have their traditional knowledge considered as part of this Planning proposal.
nil
Comment
3 wagstaff avenue wagstaff , New South Wales
Message
Drilling in the pilliga is total and utter madness no drilling of gas and fracking should be banned from all of nsw and all of australia for that matter the people dont want it
Name Withheld
Object
BAULKHAM HILLS , New South Wales
Message
TRIPLE-STACKED HORIZONTAL WELLS -
* The `Triple Stacked' drilling of horizontal coal seam gas wells through the casing of the existing wells, at Dewhurst 13-18H and 31 poses great danger to the Great Artesian Basin and other aquifers as it is very difficult, if not impossible, to seal the junction between the casing and the lateral.
* When questioned about sealing these junctions in July this year, NSW Chief Scientist Professor Mary O'Kane said she had been told by Santos that they had difficulty sealing these junctions known as Kick Off Points (KOPs). It is clear that Santos hold little concern for the pollution of aquifers by either drill fluids or gas escapes and the down draining of aquifers.
ECONOMICS -
* The assessment that has been done doesn't take into account any costs of the project, only claimed benefits. This approach has been labelled as "biased", "abused" and "deficient" by the ABS, Productivity Commission and Land and Environment Court respectively and doesn't comply with DGRs.
* DGRs call for a demonstration of "net benefit" to the NSW community. To an economist, this is a clear call for cost benefit analysis. There is no cost benefit analysis in the EIS. NSW Treasury and Department of Planning put out guidelines in Nov last year specifically to guide cost benefit analysis of mining and CSG projects. These have not been followed.
WATER -
* The drilling of these wells will produce an additional 331 and 413 megalitres over three years for the operation of Dewhurst 13-18H and Dewhurst 26-31 pilots, respectively of highly saline water containing heavy-metals and petrochemicals. Santos still do not have approval for any long-term sustainable management of this toxic produced water that poses a huge threat to the local creeks and groundwater from spills.
* In addition despite the risks posed by the new tri-lateral wells there is no established baseline data for the important groundwater systems underlying the Pilliga such as the recharge zone for the Great Artesian Basin. The aquifer monitoring bores required to do this have not yet been constructed.
* In addition, the cumulative water model used by Santos lacks the basic data required to assess the impacts of drilling for coal seam gas on groundwater in the future.
BIODIVERSITY -
* The further drilling required for these wells could be death by a thousand cuts for the Federal and State listed threatened species that live in the Pilliga Forest. These include the Pilliga Mouse (found only in the Pilliga), Koala's, the Black Striped Wallaby, Eastern Pygmy Possum and many more. The Pilliga is also a haven for birdlife, including the internationally protected Rainbow Bee-eater.
* Santos have admitted that their CSG exploration will destroy habitat for the Pilliga Mouse. The breeding status and population dynamics of the threatened species in the Pilliga are very poorly understood. There must be baseline ecological surveys to assess the population dynamics and status of the Pilliga Mouse and other threatened species.
AIR QUALITY -
The baseline atmospheric methane data collection against which to assess any future potential fugitive emissions and Independent Health Impact Assessment of north-west NSW to establish baseline health data and air quality information has not yet been conducted.
GREEN-HOUSE GASES -
The latest studies of unconventional gas drilling from Harvard University have suggest gas emissions from drilling and fracking are 50% worse than previously though. A 2012 study by researchers at the Southern Cross University found significant amounts of methane appeared to be leaking from the country's largest coal-seam field, near Condamine on Queensland's Western Downs.
HAZARDS -
The Pilliga is highly susceptible to fires, largely due to the high incidence of ironstone attracting lightning strikes. It is not unusual for the Rural Fire Service to record up to 1000 over a 24 hour period in the Pilliga region. Santos does not appear to have a clear bushfire strategy, especially for gas flaring which cannot be shut down on catastrophic fire days.
HERITAGE -
It is extremely disappointing that Aboriginal Heritage requirements for were taken out of the Director General Requirements. The Gomeroi Traditional Owners of the Pilliga Forest have an ongoing connection to the Pilliga Forest through `song-lines', sacred sites, bush-medicine and cultural practices. To not include an Aboriginal Cultural Heritage assessment is denying the rights of the Gomeroi Nation to have their traditional knowledge considered as part of this Planning proposal.
Ken Aberdeen
Object
Indooroopilly , Queensland
Message
RESPONSE TO THE DIRECTOR GENERAL REQUIREMENTS:
TRIPLE-STACKED HORIZONTAL WELLS -
* The `Triple Stacked' drilling of horizontal coal seam gas wells through the casing of the existing wells, at Dewhurst 13-18H and 31 poses great danger to the Great Artesian Basin and other aquifers as it is very difficult, if not impossible, to seal the junction between the casing and the lateral.
* When questioned about sealing these junctions in July this year, NSW Chief Scientist Professor Mary O'Kane said she had been told by Santos that they had difficulty sealing these junctions known as Kick Off Points (KOPs). It is clear that Santos hold little concern for the pollution of aquifers by either drill fluids or gas escapes and the down draining of aquifers.
ECONOMICS -
* The assessment that has been done doesn't take into account any costs of the project, only claimed benefits. This approach has been labelled as "biased", "abused" and "deficient" by the ABS, Productivity Commission and Land and Environment Court respectively and doesn't comply with DGRs.
* DGRs call for a demonstration of "net benefit" to the NSW community. To an economist, this is a clear call for cost benefit analysis. There is no cost benefit analysis in the EIS. NSW Treasury and Department of Planning put out guidelines in Nov last year specifically to guide cost benefit analysis of mining and CSG projects. These have not been followed.
WATER -
* The drilling of these wells will produce an additional 331 and 413 megalitres over three years for the operation of Dewhurst 13-18H and Dewhurst 26-31 pilots, respectively of highly saline water containing heavy-metals and petrochemicals. Santos still do not have approval for any long-term sustainable management of this toxic produced water that poses a huge threat to the local creeks and groundwater from spills.
* In addition despite the risks posed by the new tri-lateral wells there is no established baseline data for the important groundwater systems underlying the Pilliga such as the recharge zone for the Great Artesian Basin. The aquifer monitoring bores required to do this have not yet been constructed.
* In addition, the cumulative water model used by Santos lacks the basic data required to assess the impacts of drilling for coal seam gas on groundwater in the future.
BIODIVERSITY -
* The further drilling required for these wells could be death by a thousand cuts for the Federal and State listed threatened species that live in the Pilliga Forest. These include the Pilliga Mouse (found only in the Pilliga), Koala's, the Black Striped Wallaby, Eastern Pygmy Possum and many more. The Pilliga is also a haven for birdlife, including the internationally protected Rainbow Bee-eater.
* Santos have admitted that their CSG exploration will destroy habitat for the Pilliga Mouse. The breeding status and population dynamics of the threatened species in the Pilliga are very poorly understood. There must be baseline ecological surveys to assess the population dynamics and status of the Pilliga Mouse and other threatened species.
AIR QUALITY -
The baseline atmospheric methane data collection against which to assess any future potential fugitive emissions and Independent Health Impact Assessment of north-west NSW to establish baseline health data and air quality information has not yet been conducted.
GREEN-HOUSE GASES -
The latest studies of unconventional gas drilling from Harvard University have suggest gas emissions from drilling and fracking are 50% worse than previously though. A 2012 study by researchers at the Southern Cross University found significant amounts of methane appeared to be leaking from the country's largest coal-seam field, near Condamine on Queensland's Western Downs.
HAZARDS -
The Pilliga is highly susceptible to fires, largely due to the high incidence of ironstone attracting lightning strikes. It is not unusual for the Rural Fire Service to record up to 1000 over a 24 hour period in the Pilliga region. Santos does not appear to have a clear bushfire strategy, especially for gas flaring which cannot be shut down on catastrophic fire days.
HERITAGE -
It is extremely disappointing that Aboriginal Heritage requirements for were taken out of the Director General Requirements. The Gomeroi Traditional Owners of the Pilliga Forest have an ongoing connection to the Pilliga Forest through `song-lines', sacred sites, bush-medicine and cultural practices. To not include an Aboriginal Cultural Heritage assessment is denying the rights of the Gomeroi Nation to have their traditional knowledge considered as part of this Planning proposal.
Felicity Crombach
Object
Newcomb , Victoria
Message
Dear Sir

I am most concerned about the ground water if more drilling should occur. The ground water cannot be sealed off and therefore is vulnerable. I trust that this will be taken into account and no further drilling will occur.

Regards
Felicity Crombach
Name Withheld
Object
Marrickville , New South Wales
Message
To whom it may concern,

Santos has failed to meet the Director General Requirements for this project. The Expansion poses many threats to human health, business, wildlife, and the environment and cannot go ahead.


TRIPLE-STACKED HORIZONTAL WELLS -
* The `Triple Stacked' drilling of horizontal coal seam gas wells through the casing of the existing wells, at Dewhurst 13-18H and 31 poses great danger to the Great Artesian Basin and other aquifers as it is very difficult, if not impossible, to seal the junction between the casing and the lateral.
* When questioned about sealing these junctions in July this year, NSW Chief Scientist Professor Mary O'Kane said she had been told by Santos that they had difficulty sealing these junctions known as Kick Off Points (KOPs). It is clear that Santos hold little concern for the pollution of aquifers by either drill fluids or gas escapes and the down draining of aquifers.
ECONOMICS -
* The assessment that has been done doesn't take into account any costs of the project, only claimed benefits. This approach has been labelled as "biased", "abused" and "deficient" by the ABS, Productivity Commission and Land and Environment Court respectively and doesn't comply with DGRs.
* DGRs call for a demonstration of "net benefit" to the NSW community. To an economist, this is a clear call for cost benefit analysis. There is no cost benefit analysis in the EIS. NSW Treasury and Department of Planning put out guidelines in Nov last year specifically to guide cost benefit analysis of mining and CSG projects. These have not been followed.
WATER -
* The drilling of these wells will produce an additional 331 and 413 megalitres over three years for the operation of Dewhurst 13-18H and Dewhurst 26-31 pilots, respectively of highly saline water containing heavy-metals and petrochemicals. Santos still do not have approval for any long-term sustainable management of this toxic produced water that poses a huge threat to the local creeks and groundwater from spills.
* In addition despite the risks posed by the new tri-lateral wells there is no established baseline data for the important groundwater systems underlying the Pilliga such as the recharge zone for the Great Artesian Basin. The aquifer monitoring bores required to do this have not yet been constructed.
* In addition, the cumulative water model used by Santos lacks the basic data required to assess the impacts of drilling for coal seam gas on groundwater in the future.
BIODIVERSITY -
* The further drilling required for these wells could be death by a thousand cuts for the Federal and State listed threatened species that live in the Pilliga Forest. These include the Pilliga Mouse (found only in the Pilliga), Koala's, the Black Striped Wallaby, Eastern Pygmy Possum and many more. The Pilliga is also a haven for birdlife, including the internationally protected Rainbow Bee-eater.
* Santos have admitted that their CSG exploration will destroy habitat for the Pilliga Mouse. The breeding status and population dynamics of the threatened species in the Pilliga are very poorly understood. There must be baseline ecological surveys to assess the population dynamics and status of the Pilliga Mouse and other threatened species.
AIR QUALITY -
The baseline atmospheric methane data collection against which to assess any future potential fugitive emissions and Independent Health Impact Assessment of north-west NSW to establish baseline health data and air quality information has not yet been conducted.
GREEN-HOUSE GASES -
The latest studies of unconventional gas drilling from Harvard University have suggest gas emissions from drilling and fracking are 50% worse than previously though. A 2012 study by researchers at the Southern Cross University found significant amounts of methane appeared to be leaking from the country's largest coal-seam field, near Condamine on Queensland's Western Downs.
HAZARDS -
The Pilliga is highly susceptible to fires, largely due to the high incidence of ironstone attracting lightning strikes. It is not unusual for the Rural Fire Service to record up to 1000 over a 24 hour period in the Pilliga region. Santos does not appear to have a clear bushfire strategy, especially for gas flaring which cannot be shut down on catastrophic fire days.
HERITAGE -
It is extremely disappointing that Aboriginal Heritage requirements for were taken out of the Director General Requirements. The Gomeroi Traditional Owners of the Pilliga Forest have an ongoing connection to the Pilliga Forest through `song-lines', sacred sites, bush-medicine and cultural practices. To not include an Aboriginal Cultural Heritage assessment is denying the rights of the Gomeroi Nation to have their traditional knowledge considered as part of this Planning proposal.
Name Withheld
Object
Mosman , New South Wales
Message
I wish to express again my opposition to the application for permission to extend the coal seam gas exploration in the Pilliga region, which is a unique and vital part of Australia's natural heritage.
It has been established that this activity will present a threat to the biodiversity of the area by damaging the habitat of rare species such as the Pilliga Mouse, as well as koalas and other vulnerable species, including birdlife such as the protected rainbow bee-eater. Once species are lost or irreversibly harmed, the damage cannot be undone, and this is never justified by commercial gain.
There has apparently been no adequate commercial benefit assessment, which should make the application invalid.
There is a deficit of scientific assessment of the effects of toxic water produced by the process on local waterways and aquifers, and, more importantly, the Great Artesian Basin system, which itself is imperfectly understood. The threat of pollution of this vast essential system should preclude any further exploration or experimentation.
Continuing scientific discovery is lending more strength to the argument for abandoning coal-gas exploration, through knowledge of the amount of methane emission, of which the leakage in the Condamine area is an example.
I contend that this application in the light of current knowledge is irresponsible, and has potential for causing very great and irreparable disaster.
Kieran Mutimer
Object
rosebank , New South Wales
Message
I object to drilling for CSG in the Pilliga Forest as I don't believe the risk of not contaminating ground water or the safe disposal of waste water can be guaranteed by Santos.
The short term benefit of sourcing CSG in NSW can not outweigh the potential environmental and health impacts of this unproven technology.
I am a registered Medical Practitioner and a member of Doctors for the Environment and have read many scientific articles around the health impacts of CSG mining and the fracking process. I have formed the conclusion that NSW needs a moratorium on the unconventional gas extractive industry (similar to that in place in Victoria) until the safety issues are resolved.
Peter Nicholas
Object
Nowra , New South Wales
Message
I submit that this application flies in the face of all evidence of the dangers of this type of resource extraction; that it is anti-social in all its aspects and that there is no advantage, short or long term, for the Australian community or it's underlying economy
The Santos operations are socially negative and should not be tolerated.
Name Withheld
Object
Medway , New South Wales
Message
I am opposed to Santos drilling for CSG in the Pilliga. Santos has not complied with the Director General's Requirements for this project. The following points show their lack of compliance
TRIPLE-STACKED HORIZONTAL WELLS -
* The `Triple Stacked' drilling of horizontal coal seam gas wells through the casing of the existing wells, at Dewhurst 13-18H and 31 poses great danger to the Great Artesian Basin and other aquifers as it is very difficult, if not impossible, to seal the junction between the casing and the lateral.
* When questioned about sealing these junctions in July this year, NSW Chief Scientist Professor Mary O'Kane said she had been told by Santos that they had difficulty sealing these junctions known as Kick Off Points (KOPs). It is clear that Santos hold little concern for the pollution of aquifers by either drill fluids or gas escapes and the down draining of aquifers.
ECONOMICS -
* The assessment that has been done doesn't take into account any costs of the project, only claimed benefits. This approach has been labelled as "biased", "abused" and "deficient" by the ABS, Productivity Commission and Land and Environment Court respectively and doesn't comply with DGRs.
* DGRs call for a demonstration of "net benefit" to the NSW community. To an economist, this is a clear call for cost benefit analysis. There is no cost benefit analysis in the EIS. NSW Treasury and Department of Planning put out guidelines in Nov last year specifically to guide cost benefit analysis of mining and CSG projects. These have not been followed.
WATER -
* The drilling of these wells will produce an additional 331 and 413 megalitres over three years for the operation of Dewhurst 13-18H and Dewhurst 26-31 pilots, respectively of highly saline water containing heavy-metals and petrochemicals. Santos still do not have approval for any long-term sustainable management of this toxic produced water that poses a huge threat to the local creeks and groundwater from spills.
* In addition despite the risks posed by the new tri-lateral wells there is no established baseline data for the important groundwater systems underlying the Pilliga such as the recharge zone for the Great Artesian Basin. The aquifer monitoring bores required to do this have not yet been constructed.
* In addition, the cumulative water model used by Santos lacks the basic data required to assess the impacts of drilling for coal seam gas on groundwater in the future.
BIODIVERSITY -
* The further drilling required for these wells could be death by a thousand cuts for the Federal and State listed threatened species that live in the Pilliga Forest. These include the Pilliga Mouse (found only in the Pilliga), Koala's, the Black Striped Wallaby, Eastern Pygmy Possum and many more. The Pilliga is also a haven for birdlife, including the internationally protected Rainbow Bee-eater.
* Santos have admitted that their CSG exploration will destroy habitat for the Pilliga Mouse. The breeding status and population dynamics of the threatened species in the Pilliga are very poorly understood. There must be baseline ecological surveys to assess the population dynamics and status of the Pilliga Mouse and other threatened species.
AIR QUALITY -
The baseline atmospheric methane data collection against which to assess any future potential fugitive emissions and Independent Health Impact Assessment of north-west NSW to establish baseline health data and air quality information has not yet been conducted.
GREEN-HOUSE GASES -
The latest studies of unconventional gas drilling from Harvard University have suggest gas emissions from drilling and fracking are 50% worse than previously though. A 2012 study by researchers at the Southern Cross University found significant amounts of methane appeared to be leaking from the country's largest coal-seam field, near Condamine on Queensland's Western Downs.
HAZARDS -
The Pilliga is highly susceptible to fires, largely due to the high incidence of ironstone attracting lightning strikes. It is not unusual for the Rural Fire Service to record up to 1000 over a 24 hour period in the Pilliga region. Santos does not appear to have a clear bushfire strategy, especially for gas flaring which cannot be shut down on catastrophic fire days.
HERITAGE -
It is extremely disappointing that Aboriginal Heritage requirements for were taken out of the Director General Requirements. The Gomeroi Traditional Owners of the Pilliga Forest have an ongoing connection to the Pilliga Forest through `song-lines', sacred sites, bush-medicine and cultural practices. To not include an Aboriginal Cultural Heritage assessment is denying the rights of the Gomeroi Nation to have their traditional knowledge considered as part of this Planning proposal.
Michelle Lopert
Object
kendall , New South Wales
Message
I am against granting these proposed mining licences based for the following reasons:

TRIPLE-STACKED HORIZONTAL WELLS -
* The `Triple Stacked' drilling of horizontal coal seam gas wells through the casing of the existing wells poses great danger to the Great Artesian Basin as it is very difficult, if not impossible, to seal the junction between the casing and the lateral.

* It is clear that Santos holds little concern for the pollution of aquifers by either drill fluids or gas escapes and the down draining of aquifers.

ECONOMICS -
* The assessment that has been done doesn't take into account any costs of the project, only claimed benefits.

* There is no cost benefit analysis in the EIS.

WATER -
* The drilling of these wells will produce an additional 331 and 413 megalitres over three years of highly saline water containing heavy-metals and petrochemicals. This toxic produced water poses a huge threat to the local creeks and groundwater from spills.

* There is no established baseline data for the important groundwater systems underlying the Pilliga such as the recharge zone for the Great Artesian Basin. The aquifer monitoring bores required to do this have not yet been constructed.

BIODIVERSITY -
The further drilling required for these wells could cause the death to the threatened species that live in the Pilliga Forest.


AIR QUALITY -
The baseline atmospheric methane data collection against which to assess any future potential fugitive emissions and Independent Health Impact Assessment of north-west NSW to establish baseline health data and air quality information has not yet been conducted.

GREEN-HOUSE GASES -
The latest studies of unconventional gas drilling from Harvard University have suggest gas emissions from drilling and fracking are 50% worse than previously though. A 2012 study by researchers at the Southern Cross University found significant amounts of methane appeared to be leaking from the country's largest coal-seam field, near Condamine on Queensland's Western Downs.

HAZARDS -
The Pilliga is highly susceptible to fires, largely due to the high incidence of ironstone attracting lightning strikes. It is not unusual for the Rural Fire Service to record up to 1000 over a 24 hour period in the Pilliga region. Santos does not appear to have a clear bushfire strategy, especially for gas flaring which cannot be shut down on catastrophic fire days.


Anthony Poutsma
Object
Albany Ck , Queensland
Message
RESPONSE TO THE DIRECTOR GENERAL REQUIREMENTS:
TRIPLE-STACKED HORIZONTAL WELLS -
* The `Triple Stacked' drilling of horizontal coal seam gas wells through the casing of the existing wells, at Dewhurst 13-18H and 31 poses great danger to the Great Artesian Basin and other aquifers as it is very difficult, if not impossible, to seal the junction between the casing and the lateral.
* When questioned about sealing these junctions in July this year, NSW Chief Scientist Professor Mary O'Kane said she had been told by Santos that they had difficulty sealing these junctions known as Kick Off Points (KOPs). It is clear that Santos hold little concern for the pollution of aquifers by either drill fluids or gas escapes and the down draining of aquifers.
ECONOMICS -
* The assessment that has been done doesn't take into account any costs of the project, only claimed benefits. This approach has been labelled as "biased", "abused" and "deficient" by the ABS, Productivity Commission and Land and Environment Court respectively and doesn't comply with DGRs.
* DGRs call for a demonstration of "net benefit" to the NSW community. To an economist, this is a clear call for cost benefit analysis. There is no cost benefit analysis in the EIS. NSW Treasury and Department of Planning put out guidelines in Nov last year specifically to guide cost benefit analysis of mining and CSG projects. These have not been followed.
WATER -
* The drilling of these wells will produce an additional 331 and 413 megalitres over three years for the operation of Dewhurst 13-18H and Dewhurst 26-31 pilots, respectively of highly saline water containing heavy-metals and petrochemicals. Santos still do not have approval for any long-term sustainable management of this toxic produced water that poses a huge threat to the local creeks and groundwater from spills.
* In addition despite the risks posed by the new tri-lateral wells there is no established baseline data for the important groundwater systems underlying the Pilliga such as the recharge zone for the Great Artesian Basin. The aquifer monitoring bores required to do this have not yet been constructed.
* In addition, the cumulative water model used by Santos lacks the basic data required to assess the impacts of drilling for coal seam gas on groundwater in the future.
BIODIVERSITY -
* The further drilling required for these wells could be death by a thousand cuts for the Federal and State listed threatened species that live in the Pilliga Forest. These include the Pilliga Mouse (found only in the Pilliga), Koala's, the Black Striped Wallaby, Eastern Pygmy Possum and many more. The Pilliga is also a haven for birdlife, including the internationally protected Rainbow Bee-eater.
* Santos have admitted that their CSG exploration will destroy habitat for the Pilliga Mouse. The breeding status and population dynamics of the threatened species in the Pilliga are very poorly understood. There must be baseline ecological surveys to assess the population dynamics and status of the Pilliga Mouse and other threatened species.
AIR QUALITY -
The baseline atmospheric methane data collection against which to assess any future potential fugitive emissions and Independent Health Impact Assessment of north-west NSW to establish baseline health data and air quality information has not yet been conducted.
GREEN-HOUSE GASES -
The latest studies of unconventional gas drilling from Harvard University have suggest gas emissions from drilling and fracking are 50% worse than previously though. A 2012 study by researchers at the Southern Cross University found significant amounts of methane appeared to be leaking from the country's largest coal-seam field, near Condamine on Queensland's Western Downs.
HAZARDS -
The Pilliga is highly susceptible to fires, largely due to the high incidence of ironstone attracting lightning strikes. It is not unusual for the Rural Fire Service to record up to 1000 over a 24 hour period in the Pilliga region. Santos does not appear to have a clear bushfire strategy, especially for gas flaring which cannot be shut down on catastrophic fire days.
HERITAGE -
It is extremely disappointing that Aboriginal Heritage requirements for were taken out of the Director General Requirements. The Gomeroi Traditional Owners of the Pilliga Forest have an ongoing connection to the Pilliga Forest through `song-lines', sacred sites, bush-medicine and cultural practices. To not include an Aboriginal Cultural Heritage assessment is denying the rights of the Gomeroi Nation to have their traditional knowledge considered as part of this Planning proposal.
Dale Curtis
Object
Armidale , New South Wales
Message
RESPONSE TO THE DIRECTOR GENERAL REQUIREMENTS:
TRIPLE-STACKED HORIZONTAL WELLS -
* The `Triple Stacked' drilling of horizontal coal seam gas wells through the casing of the existing wells, at Dewhurst 13-18H and 31 poses great danger to the Great Artesian Basin and other aquifers as it is very difficult, if not impossible, to seal the junction between the casing and the lateral.
* When questioned about sealing these junctions in July this year, NSW Chief Scientist Professor Mary O'Kane said she had been told by Santos that they had difficulty sealing these junctions known as Kick Off Points (KOPs). It is clear that Santos hold little concern for the pollution of aquifers by either drill fluids or gas escapes and the down draining of aquifers.
ECONOMICS -
* The assessment that has been done doesn't take into account any costs of the project, only claimed benefits. This approach has been labelled as "biased", "abused" and "deficient" by the ABS, Productivity Commission and Land and Environment Court respectively and doesn't comply with DGRs.
* DGRs call for a demonstration of "net benefit" to the NSW community. To an economist, this is a clear call for cost benefit analysis. There is no cost benefit analysis in the EIS. NSW Treasury and Department of Planning put out guidelines in Nov last year specifically to guide cost benefit analysis of mining and CSG projects. These have not been followed.
WATER -
* The drilling of these wells will produce an additional 331 and 413 megalitres over three years for the operation of Dewhurst 13-18H and Dewhurst 26-31 pilots, respectively of highly saline water containing heavy-metals and petrochemicals. Santos still do not have approval for any long-term sustainable management of this toxic produced water that poses a huge threat to the local creeks and groundwater from spills.
* In addition despite the risks posed by the new tri-lateral wells there is no established baseline data for the important groundwater systems underlying the Pilliga such as the recharge zone for the Great Artesian Basin. The aquifer monitoring bores required to do this have not yet been constructed.
* In addition, the cumulative water model used by Santos lacks the basic data required to assess the impacts of drilling for coal seam gas on groundwater in the future.
BIODIVERSITY -
* The further drilling required for these wells could be death by a thousand cuts for the Federal and State listed threatened species that live in the Pilliga Forest. These include the Pilliga Mouse (found only in the Pilliga), Koala's, the Black Striped Wallaby, Eastern Pygmy Possum and many more. The Pilliga is also a haven for birdlife, including the internationally protected Rainbow Bee-eater.
* Santos have admitted that their CSG exploration will destroy habitat for the Pilliga Mouse. The breeding status and population dynamics of the threatened species in the Pilliga are very poorly understood. There must be baseline ecological surveys to assess the population dynamics and status of the Pilliga Mouse and other threatened species.
AIR QUALITY -
The baseline atmospheric methane data collection against which to assess any future potential fugitive emissions and Independent Health Impact Assessment of north-west NSW to establish baseline health data and air quality information has not yet been conducted.
GREEN-HOUSE GASES -
The latest studies of unconventional gas drilling from Harvard University have suggested gas emissions from drilling and fracking are 50% worse than previously thought. A 2012 study by researchers at the Southern Cross University found significant amounts of methane appeared to be leaking from the country's largest coal-seam field, near Condamine on Queensland's Western Downs.
HAZARDS -
The Pilliga is highly susceptible to fires, largely due to the high incidence of ironstone attracting lightning strikes. It is not unusual for the Rural Fire Service to record up to 1000 over a 24 hour period in the Pilliga region. Santos does not appear to have a clear bushfire strategy, especially for gas flaring which cannot be shut down on catastrophic fire days.
HERITAGE -
It is extremely disappointing that Aboriginal Heritage requirements for were taken out of the Director General Requirements. The Gomeroi Traditional Owners of the Pilliga Forest have an ongoing connection to the Pilliga Forest through `song-lines', sacred sites, bush-medicine and cultural practices. To not include an Aboriginal Cultural Heritage assessment is denying the rights of the Gomeroi Nation to have their traditional knowledge considered as part of this Planning proposal.
Paul Notholt
Object
Frenchs Forest , New South Wales
Message
Put simply, we have been acquainted with the surface of the earth for millenia, yet we are stil learning about the intricacies of the bioshpere and the long-term negative impacts of a whole range of human activities.
Yet we know so much less about the subterranean zone - so it is utter recklessness and selfishness to plough headlong into CSG driling, even more so with horizontal wells, until we know much, much more about the effects on groundwater, farming, air quality, native flora & fauna, and people.
History will judge us ruthlessly. What legacy will we leave behind?
Phoebe Clift
Object
Spring Ridge , New South Wales
Message
Fist things first before you let any mining go ahead you must ensure that Santos or any other mining company does not pollute, disturb or facture the pristine underground water which is vital to the local towns, agriculture and businesses in the towns. My understanding is The Pilliga is the starting or head of the aquifer and is critical as it feeds all surrounding areas. In the country we have a great appreciation of water it is our livelihood and we depend on it. The value of water outweighs the value of this mine! This water feeds Australians - local community, animals and agriculture that feeds the general community of Australia. Just think your cereal for breakfast, your bread at lunch and your steak and corn tonight are all a result of Australia's aquifers. Why doesn't Santos share to each council and the general community its Emergency Back up Plan if the aquifer that supplies the towns water are contaminated, the bores are contaminated, the water dried up - enlighten us - how do they envisage the towns to survive, the animals to drink and the crops to grow?
Roman Suwald
Object
CESSNOCK , New South Wales
Message
RESPONSE TO THE DIRECTOR GENERAL REQUIREMENTS:
TRIPLE-STACKED HORIZONTAL WELLS -
* The `Triple Stacked' drilling of horizontal coal seam gas wells through the casing of the existing wells, at Dewhurst 13-18H and 31 poses great danger to the Great Artesian Basin and other aquifers as it is very difficult, if not impossible, to seal the junction between the casing and the lateral.
* When questioned about sealing these junctions in July this year, NSW Chief Scientist Professor Mary O'Kane said she had been told by Santos that they had difficulty sealing these junctions known as Kick Off Points (KOPs). It is clear that Santos hold little concern for the pollution of aquifers by either drill fluids or gas escapes and the down draining of aquifers.
ECONOMICS -
* The assessment that has been done doesn't take into account any costs of the project, only claimed benefits. This approach has been labelled as "biased", "abused" and "deficient" by the ABS, Productivity Commission and Land and Environment Court respectively and doesn't comply with DGRs.
* DGRs call for a demonstration of "net benefit" to the NSW community. To an economist, this is a clear call for cost benefit analysis. There is no cost benefit analysis in the EIS. NSW Treasury and Department of Planning put out guidelines in Nov last year specifically to guide cost benefit analysis of mining and CSG projects. These have not been followed.
WATER -
* The drilling of these wells will produce an additional 331 and 413 megalitres over three years for the operation of Dewhurst 13-18H and Dewhurst 26-31 pilots, respectively of highly saline water containing heavy-metals and petrochemicals. Santos still do not have approval for any long-term sustainable management of this toxic produced water that poses a huge threat to the local creeks and groundwater from spills.
* In addition despite the risks posed by the new tri-lateral wells there is no established baseline data for the important groundwater systems underlying the Pilliga such as the recharge zone for the Great Artesian Basin. The aquifer monitoring bores required to do this have not yet been constructed.
* In addition, the cumulative water model used by Santos lacks the basic data required to assess the impacts of drilling for coal seam gas on groundwater in the future.
BIODIVERSITY -
* The further drilling required for these wells could be death by a thousand cuts for the Federal and State listed threatened species that live in the Pilliga Forest. These include the Pilliga Mouse (found only in the Pilliga), Koala's, the Black Striped Wallaby, Eastern Pygmy Possum and many more. The Pilliga is also a haven for birdlife, including the internationally protected Rainbow Bee-eater.
* Santos have admitted that their CSG exploration will destroy habitat for the Pilliga Mouse. The breeding status and population dynamics of the threatened species in the Pilliga are very poorly understood. There must be baseline ecological surveys to assess the population dynamics and status of the Pilliga Mouse and other threatened species.
AIR QUALITY -
The baseline atmospheric methane data collection against which to assess any future potential fugitive emissions and Independent Health Impact Assessment of north-west NSW to establish baseline health data and air quality information has not yet been conducted.
GREEN-HOUSE GASES -
The latest studies of unconventional gas drilling from Harvard University have suggest gas emissions from drilling and fracking are 50% worse than previously though. A 2012 study by researchers at the Southern Cross University found significant amounts of methane appeared to be leaking from the country's largest coal-seam field, near Condamine on Queensland's Western Downs.
HAZARDS -
The Pilliga is highly susceptible to fires, largely due to the high incidence of ironstone attracting lightning strikes. It is not unusual for the Rural Fire Service to record up to 1000 over a 24 hour period in the Pilliga region. Santos does not appear to have a clear bushfire strategy, especially for gas flaring which cannot be shut down on catastrophic fire days.
HERITAGE -
It is extremely disappointing that Aboriginal Heritage requirements for were taken out of the Director General Requirements. The Gomeroi Traditional Owners of the Pilliga Forest have an ongoing connection to the Pilliga Forest through `song-lines', sacred sites, bush-medicine and cultural practices. To not include an Aboriginal Cultural Heritage assessment is denying the rights of the Gomeroi Nation to have their traditional knowledge considered as part of this Planning proposal.


Thank you so much for taking time to protect this beautiful place.

Pagination

Project Details

Application Number
SSD-6038
Assessment Type
State Significant Development
Development Type
Petroleum extraction
Local Government Areas
Narrabri Shire
Decision
Approved
Determination Date
Decider
IPC-N
Last Modified By
SSD-6038-Mod-3
Last Modified On
15/07/2020

Contact Planner

Name
Rose-Anne Hawkeswood