Skip to main content

State DA

Determination

MP06_0148 06_0148 Tourist and Residential Development

Coffs Harbour

Determination Documents (55)

4. Response to Submissions
Appendix 1 Submissions.pdf
4. Response to Submissions
Appendix 12 Trees.pdf
4. Response to Submissions
Appendix 14 Flora and Fauna Report.pdf
4. Response to Submissions
Appendix 3 Coastal Hazard Water Management.pdf
4. Response to Submissions
Appendix 4 Letter from Dept Natural Resources.pdf
4. Response to Submissions
Appendix 5 Sewerage Provision.pdf
4. Response to Submissions
Appendix 8 Landscape Master Plan.pdf
5. Determination
Approved Concept Plan.pdf
2. Director-General's Requirements
Director-General's Requirements.pdf
Volume 1
EA Part 1.1.pdf
Volume 1
EA Part 1.10.pdf
Volume 1
EA Part 1.13.pdf
Volume 1
EA Part 1.2.pdf
Volume 1
EA Part 1.8.pdf
Volume 2
EA Part 2.1.pdf
Volume 2
EA Part 2.13.pdf
Volume 2
EA Part 2.2.pdf
Volume 2
EA Part 2.4.2.pdf
Volume 2
EA Part 2.5.pdf
Volume 2
EA Part 2.9.pdf
Volume 3
EA Part 3.1.pdf
Volume 3
EA Part 3.2.pdf
5. Determination
Instrument and conditions of approval.pdf
4. Response to Submissions
Appendix 10 Access Report.pdf
4. Response to Submissions
Appendix 15 Noise Mitigation Measures.pdf
4. Response to Submissions
Appendix 7 Bushfire Letter.pdf
4. Response to Submissions
Appendix 9 Traffic Report Part 3.pdf
Volume 1
EA Part 1.4.pdf
Volume 1
EA Part 1.5.pdf
Volume 2
EA Part 2.11.pdf
Volume 2
EA Part 2.12.pdf
Volume 2
EA Part 2.6.pdf
4. Response to Submissions
Plans.pdf
1. Application and Declaration
Preliminary Assessment.pdf
1. Application and Declaration
Project Application.pdf
4. Response to Submissions
Appendix 11 Contamination.pdf
4. Response to Submissions
Appendix 2 Geotechnical Assessment Letter.pdf
4. Response to Submissions
Appendix 2 Geotechnical Report.pdf
4. Response to Submissions
Appendix 9 Traffic Report Part 2.pdf
5. Determination
Director-General's Report.pdf
Volume 1
EA Part 1.6.pdf
Volume 1
EA Part 1.9.pdf
Volume 2
EA Part 2.8.pdf
4. Response to Submissions
Appendix 13 Stormwater Easements.pdf
4. Response to Submissions
Appendix 6 Infrastructure.pdf
4. Response to Submissions
Appendix 9 Traffic Report Part 1.pdf
Volume 1
EA Part 1.11.pdf
Volume 1
EA Part 1.12.pdf
Volume 1
EA Part 1.3.pdf
Volume 1
EA Part 1.7.pdf
Volume 2
EA Part 2.10.pdf
Volume 2
EA Part 2.3.pdf
Volume 2
EA Part 2.4.1.pdf
Volume 2
EA Part 2.7.pdf
4. Response to Submissions
Preferred Project Report.pdf

Project Details

Consent Authority's ID number
MP06_0148
Address
Pacific Hwy, Sapphire Beach 740-742 Pacific Highway , Sapphire Beach New South Wales Australia
Type of Application
Part3A
Exhibition Start-End Date
-
Determination Authority
Minister
Decision
Approved
Determination date

Consent Authority

Consent authority name
Minister