Name Withheld
Object
Name Withheld
Object
North Balgowlah
,
New South Wales
Message
I provide this submission as a North Balgowlah resident and hope the points raised will be factored into justification for and planning of the tunnel should the project end up going ahead.
1 - Is the tunnel justifiable?
Concern - The figures put forward in the EIS indicate only a minimal reduction in the traffic
flowing through Mosman for a significant and disproportionate use of public funds. Many of the assumptions for traffic used as justification of the build in the EIS have not factored in changes to travel habits and working from home due to COVID-19 and into the future, treating COVID-19 as having only a “temporary” impact".
The extra cost of tolls for local residents is not justifiable or reasonable
It has been widely discussed that if you build roads, cars will fill them up therefore the travel time benefits will only have a short term impact
Future proofing the existing lifestyle of residents in the area should be a priority for planning
Request - There are many new data points to factor in given the impact of COVID-19 on lifestyles long term and we stand with Viable Transport solutions in asking the government to halt the development process to allow for a suitable review, and to publicly release the results of the review.
2. Construction Impact
Concern - The construction phase of the project will undoubtedly impact North Balgowlah residents with dust, noise, vibration, and heavy vehicle traffic in the area. North Balgowlah will have construction surrounding most of the suburb and the EIS indicates that during construction there will be.
• Over 3,000 vehicles per day across all sites.
• 1,690 vehicles per day at the Balgowlah Golf Course site alone.
• 1.5 heavy vehicles every minute or 4.5 vehicles (total) every minute.
• Over 4,000 homes subjected to excessive noise
• Construction work to proceed 24/7 for up to 7 years.
Request – Reconsider how to ensure that the impact of trucks/vehicles is not felt on the suburban streets that are already hard to navigate with local traffic and buses. Ensure areas around schools and parks are not impacted and are safe for families and children to walk or ride around the local community. Disincentivise commuters looking to use our streets as a rat run to save time from congestion and money from using the toll roads.
3. Ventilation stacks
Concern - Global health experts agree that pollution from traffic exhaust poses serious health risks. Emissions include nitrous oxides and particulate matter that, when breathed into the lungs, causes respiratory diseases such as asthma and emphysema, and cancer. There are several schools, preschools, childcare centres, and sporting fields within the vicinity of all the proposed ventilation stacks and from a parent's point of view, the increased level of pollution is unacceptable.
Request - If the tunnel were to go ahead that the stacks be equipped with full filtration to minimize these impacts. At the very least the air pollution is kept at the current levels.
4. Environmental Impact
Concern - We are fortunate to live in an area that incorporates some spectacular bush land, reserves, and beaches and would urge that further consideration is given to the major environmental impacts, including but not limited to:
• Movement of contaminated sediment to Clontarf and Middle Harbour (The Spit) potentially causing pollution of the neighbouring beaches.
• Destruction of Burnt Bridge Creek and surrounds (e.g., bushland, wildlife etc) due to a possible 96% reduction in water flow.
• Discharge of 428,000 L per day of wastewater into Queenscliff Lagoon & Beach, resulting in health hazards for people and animals who swim in the waterways.
• Pollution of Manly Dam reserve, resulting in the potential extinction of rare flora and fauna and the last remaining areas of Duffy’s Forest, and meaning that one of the only swimmable dams in NSW is no longer safe for public use.
• Loss of recreational activities with the mountain bike trails that are used for riding, walking, and running
Request – assurances that future generations get to experience the natural wonders of the area in all its glory. That wildlife can live in the shadows of residential houses, not shadows of construction and pollution. What is the point of making the northern beaches more accessible if the very heart of what makes the northern beaches so special is destroyed? We should be preserving the trees, flora and fauna of the area.
I understand that in life, it is important to move forward, but not at all costs. We have a responsibility to look after what we have got, so we can all live together sustainably, leaving the world in a better place for future generations. I am to be convinced the tunnel is the answer.
1 - Is the tunnel justifiable?
Concern - The figures put forward in the EIS indicate only a minimal reduction in the traffic
flowing through Mosman for a significant and disproportionate use of public funds. Many of the assumptions for traffic used as justification of the build in the EIS have not factored in changes to travel habits and working from home due to COVID-19 and into the future, treating COVID-19 as having only a “temporary” impact".
The extra cost of tolls for local residents is not justifiable or reasonable
It has been widely discussed that if you build roads, cars will fill them up therefore the travel time benefits will only have a short term impact
Future proofing the existing lifestyle of residents in the area should be a priority for planning
Request - There are many new data points to factor in given the impact of COVID-19 on lifestyles long term and we stand with Viable Transport solutions in asking the government to halt the development process to allow for a suitable review, and to publicly release the results of the review.
2. Construction Impact
Concern - The construction phase of the project will undoubtedly impact North Balgowlah residents with dust, noise, vibration, and heavy vehicle traffic in the area. North Balgowlah will have construction surrounding most of the suburb and the EIS indicates that during construction there will be.
• Over 3,000 vehicles per day across all sites.
• 1,690 vehicles per day at the Balgowlah Golf Course site alone.
• 1.5 heavy vehicles every minute or 4.5 vehicles (total) every minute.
• Over 4,000 homes subjected to excessive noise
• Construction work to proceed 24/7 for up to 7 years.
Request – Reconsider how to ensure that the impact of trucks/vehicles is not felt on the suburban streets that are already hard to navigate with local traffic and buses. Ensure areas around schools and parks are not impacted and are safe for families and children to walk or ride around the local community. Disincentivise commuters looking to use our streets as a rat run to save time from congestion and money from using the toll roads.
3. Ventilation stacks
Concern - Global health experts agree that pollution from traffic exhaust poses serious health risks. Emissions include nitrous oxides and particulate matter that, when breathed into the lungs, causes respiratory diseases such as asthma and emphysema, and cancer. There are several schools, preschools, childcare centres, and sporting fields within the vicinity of all the proposed ventilation stacks and from a parent's point of view, the increased level of pollution is unacceptable.
Request - If the tunnel were to go ahead that the stacks be equipped with full filtration to minimize these impacts. At the very least the air pollution is kept at the current levels.
4. Environmental Impact
Concern - We are fortunate to live in an area that incorporates some spectacular bush land, reserves, and beaches and would urge that further consideration is given to the major environmental impacts, including but not limited to:
• Movement of contaminated sediment to Clontarf and Middle Harbour (The Spit) potentially causing pollution of the neighbouring beaches.
• Destruction of Burnt Bridge Creek and surrounds (e.g., bushland, wildlife etc) due to a possible 96% reduction in water flow.
• Discharge of 428,000 L per day of wastewater into Queenscliff Lagoon & Beach, resulting in health hazards for people and animals who swim in the waterways.
• Pollution of Manly Dam reserve, resulting in the potential extinction of rare flora and fauna and the last remaining areas of Duffy’s Forest, and meaning that one of the only swimmable dams in NSW is no longer safe for public use.
• Loss of recreational activities with the mountain bike trails that are used for riding, walking, and running
Request – assurances that future generations get to experience the natural wonders of the area in all its glory. That wildlife can live in the shadows of residential houses, not shadows of construction and pollution. What is the point of making the northern beaches more accessible if the very heart of what makes the northern beaches so special is destroyed? We should be preserving the trees, flora and fauna of the area.
I understand that in life, it is important to move forward, but not at all costs. We have a responsibility to look after what we have got, so we can all live together sustainably, leaving the world in a better place for future generations. I am to be convinced the tunnel is the answer.
Name Withheld
Object
Name Withheld
Object
CASTLECRAG
,
New South Wales
Message
I object to the destruction and disruption of the wildlife corridor at Flat Rock Gully where the proposed dive site will be. This is irreplaceable bushland on the edge of the exisiting expressway - it is priceless. Disruption to existing buildings and amenities as an alternative would have a short term social and financial cost but that can be overcome. The beauty and biodiversity in the gully may not ever return. I object also to ‘cost saving’ measures like unfiltered stacks. We deserve best-practice engineering taking into account the health of the local families and individuals who live here.
This is a unique part of Sydney, we have wallabies in our backyard! Let’s treasure this for future generations. Build the tunnel, but don’t destroy rare inner city bushland and compromise the health of people in this electorate to do so.
This is a unique part of Sydney, we have wallabies in our backyard! Let’s treasure this for future generations. Build the tunnel, but don’t destroy rare inner city bushland and compromise the health of people in this electorate to do so.
Kate O'Brien
Object
Kate O'Brien
Object
NORTH BALGOWLAH
,
New South Wales
Message
The beaches link and Gore Hill Freeway goes against Climate change and the Governments plan to reduce carbon emissions. removing significant green spaces, trees and nature reserves to build a tunnel and road to encourage more cars on the road and discourage public transport use, including removing bike lanes and green spaces that are used to cycle and walk ( burnt creek deviation).
Loss of natural habitat at Burnt Creek deviation for local wildlife flora and fauna. Destruction if Manly dam and wakehurst parkway also home to vital local eco systems.
Unfiltered smoke stacks polluting local residential areas including at least 4 local schools in direct zone of air pollution, Balgowlah Boys, Seaforth Public, St Cecilias and bordering on Manly West and BNPS.
There is no long term goal to encourage public transport use and sustainable transport options for the increasing number of people on the beaches. This will further encourage more cars and carbon emissions.
The complete destruction of the water table and planned 96% reduction of water flow planned to occur at Burnt Bridge Creek and beyond, all the way to Queenscliff
Loss of natural habitat at Burnt Creek deviation for local wildlife flora and fauna. Destruction if Manly dam and wakehurst parkway also home to vital local eco systems.
Unfiltered smoke stacks polluting local residential areas including at least 4 local schools in direct zone of air pollution, Balgowlah Boys, Seaforth Public, St Cecilias and bordering on Manly West and BNPS.
There is no long term goal to encourage public transport use and sustainable transport options for the increasing number of people on the beaches. This will further encourage more cars and carbon emissions.
The complete destruction of the water table and planned 96% reduction of water flow planned to occur at Burnt Bridge Creek and beyond, all the way to Queenscliff
Name Withheld
Comment
Name Withheld
Comment
PARRAMATTA
,
New South Wales
Message
n/a
Jenny Riseborough
Object
Jenny Riseborough
Object
CROWS NEST
,
New South Wales
Message
I hereby object to the Beaches Link and Gore Hill Freeway Connection due to the following serious concerns:
1. The massive expense of the project and the fact that it benefits a very small percentage of the population of NSW.
2. The data shows that the reduction of traffic on Military Rd and Spit Rd will be very minimal - the project won't actually fix the problem!
3. Public Transport options were not looked at properly - a Metro or rail link would service the Northern Beached well and would take traffic off the roads immediately.
4. Destruction of our natural environment - we need more green space, not less. More sportsfields on the Lower North Shore and natural environment to enjoy. The pollution during construction and after with the UNFILTERED!! exhaust stacks is a major concern to our health.
5. Not only will the project not fix the problem it sets out to solve, it has MAJOR design flaws. The entry and exit points on the Lower North Shore will make it extremely hard for locals to use the new infrastructure and the local roads will be gridlocked with people trying to get to the correct entry point. The Willoughby Rd interchange in particular will become a major entry/exit point and it is NOT designed to cope with that much traffic. Brook St works well now but will become essentially useless. The design is flawed and the knock on effect will have a massive effect on local Lower North Shore roads.
6. Safety concerns for our local children during and after construction. The number of truck movements is truly staggering. Our primary schools catchments cross the major roads where these trucks will be travelling and the safety of kids walking, bussing and driving to school will be compromised. Cammeray Public School spans Naremburn, Crows Nest and Cammeray and kids will be at risk in each of these suburbs. Cammeraygal High School catchment spans North Sydney, Waverton, Wollstonecraft, Crows Nest, Cammeray, Naremburn, Northbridge and Castlecrag. All of these suburbs will have immense traffic movements by large vehicles inappropriate for our roads.
7. Environmental Impacts are disproportionately high - Flat Rock Gully, Tunks Park, Middle Harbour, St Leonard's Park, The Coal Loader, Sydney Harbour from Waverton to Rozelle not to mention Cammeray Golf Course. TOO MANY IMPACTS! The pollution, the wildlife, the green space, our air quality, noise effects, run-off from the garbage dump in Flat Rock once disturbed.
8. Economic effects - aside from the massive cost of this project, the ongoing cost to the community in tolls will be extortionate. Additional tolls on roads already paid for in full by NSW citizens being tolled again! There will be massive deterrents to owning cars in Sydney, no public transport options and huge roads under-utilised. Covid has taught us we can work from home, or anywhere really. We don't need to be travelling on toll roads!
Please reassess this project and make sensible decisions. Use our state government funds wisely and thoughtfully for the future.This project makes no sense as it stands.
1. The massive expense of the project and the fact that it benefits a very small percentage of the population of NSW.
2. The data shows that the reduction of traffic on Military Rd and Spit Rd will be very minimal - the project won't actually fix the problem!
3. Public Transport options were not looked at properly - a Metro or rail link would service the Northern Beached well and would take traffic off the roads immediately.
4. Destruction of our natural environment - we need more green space, not less. More sportsfields on the Lower North Shore and natural environment to enjoy. The pollution during construction and after with the UNFILTERED!! exhaust stacks is a major concern to our health.
5. Not only will the project not fix the problem it sets out to solve, it has MAJOR design flaws. The entry and exit points on the Lower North Shore will make it extremely hard for locals to use the new infrastructure and the local roads will be gridlocked with people trying to get to the correct entry point. The Willoughby Rd interchange in particular will become a major entry/exit point and it is NOT designed to cope with that much traffic. Brook St works well now but will become essentially useless. The design is flawed and the knock on effect will have a massive effect on local Lower North Shore roads.
6. Safety concerns for our local children during and after construction. The number of truck movements is truly staggering. Our primary schools catchments cross the major roads where these trucks will be travelling and the safety of kids walking, bussing and driving to school will be compromised. Cammeray Public School spans Naremburn, Crows Nest and Cammeray and kids will be at risk in each of these suburbs. Cammeraygal High School catchment spans North Sydney, Waverton, Wollstonecraft, Crows Nest, Cammeray, Naremburn, Northbridge and Castlecrag. All of these suburbs will have immense traffic movements by large vehicles inappropriate for our roads.
7. Environmental Impacts are disproportionately high - Flat Rock Gully, Tunks Park, Middle Harbour, St Leonard's Park, The Coal Loader, Sydney Harbour from Waverton to Rozelle not to mention Cammeray Golf Course. TOO MANY IMPACTS! The pollution, the wildlife, the green space, our air quality, noise effects, run-off from the garbage dump in Flat Rock once disturbed.
8. Economic effects - aside from the massive cost of this project, the ongoing cost to the community in tolls will be extortionate. Additional tolls on roads already paid for in full by NSW citizens being tolled again! There will be massive deterrents to owning cars in Sydney, no public transport options and huge roads under-utilised. Covid has taught us we can work from home, or anywhere really. We don't need to be travelling on toll roads!
Please reassess this project and make sensible decisions. Use our state government funds wisely and thoughtfully for the future.This project makes no sense as it stands.
Name Withheld
Object
Name Withheld
Object
Northbridge
,
New South Wales
Message
I object to this project:
1. Absence of transparency: Consistently throughout this proposal, key information has not been made available despite repeated attempts. The business case has not been disclosed, clearly indicating there are known issues that the government does not wished confirmed in the public domain including ultimately the size of the public benefit verse the total cost including environmental and disruption and the timing of same. The government needs to commit to transparency and accountability. It is hard to believe commitments to transparency and accountability during construction when there as been so little to date.
What has not been provided adversely colours both promises and what information has been provided. We don’t know what we don’t know, but the government does.
2. Inadequate Planning: Progress to EIS has occurred with only 25% of the proposed design developed – experts have commented that this is a very low bar and does not enable fair and considered evaluation of impact. Similarly, experts have commented regarding the inadequacy of information provided in the EIS to enable an informed opinion.
3. Alternative transport options not considered and more deserving Projects: Without proper and adequate disclosure, it is impossible to comment of consideration of alternatives. Objectively there seems to be better and more pressing transport options and other more deserving infrastructure projects. It is difficult to see that the tunnel delivers the best option for improved public transportation when no rail is available. NSW cannot fund all good business cases but it should fund the best options and decision making needs to provide disclosure and accountability to ensure this is occurring.
4. All Pain No Gain: I live in Northbridge, a suburb that will be adversely impacted by the proposed development but receive no net benefits. Rather the suburb, the Premier’s suburb no less, will lose out to enable increased development of higher density dwellings in the northern beaches (as I understand 50,000 new dwellings, the consequences of which will be no improvement in travel times after the first few years of completion). There is a transfer of value from Northbridge, Cammeray and other impacted suburbs to the Northern Beaches and we don’t even know that there is a positive net value from the project.
5. Adverse impact on Northbridge growth and vibrancy for years: I understand that at least the Big 4 Banks will impose a construction risk category on all dwellings within 50 metres of the proposed tunnel. This will significantly reduce lending available to acquire premises impacted; this will likely flow through to values. Due to the long, narrow shape of Northbridge and tunnel running the length of the suburb, a significant proportion of the suburb is impacted. This is likely to impact overall values in Northbridge which will be reported as depressed – this risks impacting proposed developments, overall growth and vibrancy of the Suburb. I understand these same premises will carry access easements requiring approval prior to any improvements and/or development. The experience reported from Westconnex indicates approval times are in the range of 4-7 months. The adverse impact on Northbridge is likely to continue not only throughout development but take years to recover from.
The Government could take steps to mitigate loss of vibrancy by investing in the Northbridge Local Centres Strategy.
6. Potential Property Damage: I understand one of the reasons for the higher risk rating imposed by the banks is the risk of property damage and difficulty in securing compensation and/or rectification. Evidence provided by those impacted by Westconnex development flags the difficulties to secure damages and rectification.
Increased guarantees and support structures are required to overcome evidence of experience resulting from other projects, specifically Westconnex.
7. Lack of filtration: Exhaust stacks in Cammeray impact one of, if not the highest densities of schools in Australia. There is no established safe level for fine particulate matter yet 1000’s of children will be exposed in close proximity.
The proposed tunnel has been described as the longest unfiltered tunnel in the world. Travellers on the M5 tunnel are warned to keep their windows closed and air conditioning on recycle. The proposed Beaches Link tunnel is considerably longer and will be a multiple more problematic. People suffering with respiratory health conditions already dislike travelling the M5 tunnel.
Due to poor transparency existing evidence provided on behalf of the project fails to alleviate genuine concerns and the evidence is at odds with other expert evidence and laymen’s common sense.
8. Construction is a big deal, Traffic & noise: Dive sites are not small, they are enormous, noisy constructions with large double load trucks constantly moving in and out. An entire traffic ecosystem will be built to enable easy access for trucks and construction vehicles. Existing traffic has to go somewhere and it is well known that even small increases at peak hour add substantial delays and significant increases in local pollution.
9. Dust & particulate matter during construction: Pictures taken off and around other dive sites contradict promises of covered loads, minimal dust and limited environmental impact. A causal drive past the nearest dive site shows extracted material accumulating in gutters.
10. Contamination & environmental damage, including marine damage: It is well known that the area underlying the proposed Flat Rock Drive contains contaminants as the site was previously a dumping site. I am concerned as to the potential leakage of containments into the surrounding air, water and environment which will impact on closely situated residences, sporting fields and wildlife.
11. Health. I am one of many asthmatics living in Australia: As a chronic asthmatic, I am concerned about air pollution and contaminates both during construction and post construction due to my comprised system. I am also concerned for my children one who is an asthmatic. There are many other at-risk groups that will be impacted by poorer air quality. We can choose not to use the tunnel; it is much more difficult to avoid general air pollution.
Real time air monitoring must be located at, in and around construction sites and when complete exhaust stacks with easily understood longitudinal reporting and underlying data.
12. Road closures and restriction post construction: There is no information on road closures post construction. Experience is that existing transport routes will be blocked or restricted. Residence around the tunnels whilst receiving little to no benefit will likely have their existing transport routes reduced.
More information is required about all aspects of the proposed project sufficient to enable an informed response.
The aggregate total will be significant and sustain loss of amenity for Northbridge, Cammeray and other heavily impacted suburbs. We lose our environment, playing fields, and water ways, we are left to worry about our health and that of our families, we will have our access routes curtailed and/or traffic increased. None of this is good however we don’t know what the benefit will be; certainly not for us, nor residents along the length of the proposed route or for Northern Beach residents who will see greatly increased development but for Sydney more broadly. “All Pain No Gain” is an entirely legitimate catch cry for this proposal. The refusal of the State Government to provide information or to disclose consideration of other alternatives (in particular rail options) need to be reversed. This project should be delayed until reasonable and adequate disclosure is forthcoming to the public.
Fundamentally, I do not believe this project passes the ‘pub test’. I request that:
• the NSW government suspend progress of this project
• make public the business case and evaluations related to this project including public transport alternatives and projected impact of technology on realising benefits
• make public the evaluation of prioritisation of this project over other more essential, higher public benefit projects
1. Absence of transparency: Consistently throughout this proposal, key information has not been made available despite repeated attempts. The business case has not been disclosed, clearly indicating there are known issues that the government does not wished confirmed in the public domain including ultimately the size of the public benefit verse the total cost including environmental and disruption and the timing of same. The government needs to commit to transparency and accountability. It is hard to believe commitments to transparency and accountability during construction when there as been so little to date.
What has not been provided adversely colours both promises and what information has been provided. We don’t know what we don’t know, but the government does.
2. Inadequate Planning: Progress to EIS has occurred with only 25% of the proposed design developed – experts have commented that this is a very low bar and does not enable fair and considered evaluation of impact. Similarly, experts have commented regarding the inadequacy of information provided in the EIS to enable an informed opinion.
3. Alternative transport options not considered and more deserving Projects: Without proper and adequate disclosure, it is impossible to comment of consideration of alternatives. Objectively there seems to be better and more pressing transport options and other more deserving infrastructure projects. It is difficult to see that the tunnel delivers the best option for improved public transportation when no rail is available. NSW cannot fund all good business cases but it should fund the best options and decision making needs to provide disclosure and accountability to ensure this is occurring.
4. All Pain No Gain: I live in Northbridge, a suburb that will be adversely impacted by the proposed development but receive no net benefits. Rather the suburb, the Premier’s suburb no less, will lose out to enable increased development of higher density dwellings in the northern beaches (as I understand 50,000 new dwellings, the consequences of which will be no improvement in travel times after the first few years of completion). There is a transfer of value from Northbridge, Cammeray and other impacted suburbs to the Northern Beaches and we don’t even know that there is a positive net value from the project.
5. Adverse impact on Northbridge growth and vibrancy for years: I understand that at least the Big 4 Banks will impose a construction risk category on all dwellings within 50 metres of the proposed tunnel. This will significantly reduce lending available to acquire premises impacted; this will likely flow through to values. Due to the long, narrow shape of Northbridge and tunnel running the length of the suburb, a significant proportion of the suburb is impacted. This is likely to impact overall values in Northbridge which will be reported as depressed – this risks impacting proposed developments, overall growth and vibrancy of the Suburb. I understand these same premises will carry access easements requiring approval prior to any improvements and/or development. The experience reported from Westconnex indicates approval times are in the range of 4-7 months. The adverse impact on Northbridge is likely to continue not only throughout development but take years to recover from.
The Government could take steps to mitigate loss of vibrancy by investing in the Northbridge Local Centres Strategy.
6. Potential Property Damage: I understand one of the reasons for the higher risk rating imposed by the banks is the risk of property damage and difficulty in securing compensation and/or rectification. Evidence provided by those impacted by Westconnex development flags the difficulties to secure damages and rectification.
Increased guarantees and support structures are required to overcome evidence of experience resulting from other projects, specifically Westconnex.
7. Lack of filtration: Exhaust stacks in Cammeray impact one of, if not the highest densities of schools in Australia. There is no established safe level for fine particulate matter yet 1000’s of children will be exposed in close proximity.
The proposed tunnel has been described as the longest unfiltered tunnel in the world. Travellers on the M5 tunnel are warned to keep their windows closed and air conditioning on recycle. The proposed Beaches Link tunnel is considerably longer and will be a multiple more problematic. People suffering with respiratory health conditions already dislike travelling the M5 tunnel.
Due to poor transparency existing evidence provided on behalf of the project fails to alleviate genuine concerns and the evidence is at odds with other expert evidence and laymen’s common sense.
8. Construction is a big deal, Traffic & noise: Dive sites are not small, they are enormous, noisy constructions with large double load trucks constantly moving in and out. An entire traffic ecosystem will be built to enable easy access for trucks and construction vehicles. Existing traffic has to go somewhere and it is well known that even small increases at peak hour add substantial delays and significant increases in local pollution.
9. Dust & particulate matter during construction: Pictures taken off and around other dive sites contradict promises of covered loads, minimal dust and limited environmental impact. A causal drive past the nearest dive site shows extracted material accumulating in gutters.
10. Contamination & environmental damage, including marine damage: It is well known that the area underlying the proposed Flat Rock Drive contains contaminants as the site was previously a dumping site. I am concerned as to the potential leakage of containments into the surrounding air, water and environment which will impact on closely situated residences, sporting fields and wildlife.
11. Health. I am one of many asthmatics living in Australia: As a chronic asthmatic, I am concerned about air pollution and contaminates both during construction and post construction due to my comprised system. I am also concerned for my children one who is an asthmatic. There are many other at-risk groups that will be impacted by poorer air quality. We can choose not to use the tunnel; it is much more difficult to avoid general air pollution.
Real time air monitoring must be located at, in and around construction sites and when complete exhaust stacks with easily understood longitudinal reporting and underlying data.
12. Road closures and restriction post construction: There is no information on road closures post construction. Experience is that existing transport routes will be blocked or restricted. Residence around the tunnels whilst receiving little to no benefit will likely have their existing transport routes reduced.
More information is required about all aspects of the proposed project sufficient to enable an informed response.
The aggregate total will be significant and sustain loss of amenity for Northbridge, Cammeray and other heavily impacted suburbs. We lose our environment, playing fields, and water ways, we are left to worry about our health and that of our families, we will have our access routes curtailed and/or traffic increased. None of this is good however we don’t know what the benefit will be; certainly not for us, nor residents along the length of the proposed route or for Northern Beach residents who will see greatly increased development but for Sydney more broadly. “All Pain No Gain” is an entirely legitimate catch cry for this proposal. The refusal of the State Government to provide information or to disclose consideration of other alternatives (in particular rail options) need to be reversed. This project should be delayed until reasonable and adequate disclosure is forthcoming to the public.
Fundamentally, I do not believe this project passes the ‘pub test’. I request that:
• the NSW government suspend progress of this project
• make public the business case and evaluations related to this project including public transport alternatives and projected impact of technology on realising benefits
• make public the evaluation of prioritisation of this project over other more essential, higher public benefit projects
Kathy Bisits
Object
Kathy Bisits
Object
CAMMERAY
,
New South Wales
Message
The request that the NSW government abandon the Beaches Link Tunnels Project. See attachment below
Attachments
Name Withheld
Object
Name Withheld
Object
BALGOWLAH
,
New South Wales
Message
To whom it may concern,
I am writing to submit my concerns, uncertainty and overall objection to the Beaches Link Tunnel proposed by Transport for NSW.
There is enormous impact to local communities with the shock and subsequent decline of environment, the increased local traffic congestion and parking issues, water and air pollution as well as noise pollution. All of which is due to occur both during construction and operation of the proposed tunnel. This simply does not make logical sense when placed against huge expenditure of public funds for projected minimal gains for a very small area.
I have detailed my objections as follows:
• The desired outcome for the project is to reduce traffic congestion south of the Spit Bridge and hasten commutes. I object to the forecast of the benefits of the proposed tunnel as they were based on 2016 surveys. This therefore did not take into account the current global Covid 19 pandemic and its changed landscape for commuter’s vehicular use nor did it address the recent and successful introduction of B-line services. Less commuters due to the ability and desire of workers to work from home at least a few days a week, will obviously alleviate some traffic congestion. This ‘new normal’ presents an ill-advised and indeed foolish notion to take on this tunnel without investigating trends post 2020
• The traffic impact for the Balgowlah, Seaforth and Manly Vale communities are enormous. If the proposed tunnel goes ahead traffic and congestion will be hellish. This will be due to the construction site bringing slowed traffic conditions, large trucks entering and exiting sites, large trucks attempting tight corners, random stop-starts by manual traffic wardens, parking of contractors and workers, lack of parking for locals, and increased congestion to the already busy Condamine Street, Sydney Road and surrounding roads. Traffic impact alone gives way to greater carbon emissions, impedes current traffic flow and will cause an increase in danger to both vehicles and pedestrians
• I object to the smokestacks not being filtered. I am shocked and dismayed how this has even been approved given the proximity to local schools. Previously smokestack filtration has not been deemed financially viable compared to the health impacts. The exponential growth in respiratory conditions such as cancer, asthma attacks, emphysema, bronchiectasis and decreased lung capacity has been well documented in residential areas surrounding smokestacks, such as the M5 at Arncliffe. Failure to filtrate smokestacks considering a respiratory pandemic the world is facing is negligent. The future health care costs are not only monetary, but concern morbidity and mortality. To date, this has not been adequately addressed and needs to be thoroughly considered
• I object to the noise pollution from these works. As someone who has recently lost a significant amount of hearing due to sudden pathology, I do not wish the remainder of my precious hearing to be affected further by the proposed works. Decibel levels have been proposed to be unhealthy for kilometres surrounding the work site and operational site
• I object to the impact on no fewer than six schools in the immediate vicinity of the proposed work and operational site. Hundreds of children will be negatively affected. The noise and air pollution caused both during construction and during operation will directly affect these children’s learning and health. Personally, it would impact my child who has additional needs – the distraction of noise will impair his focus on his studies and learning – something we have worked VERY hard to achieve thus far
• I am concerned for my children who walk to school. The growth of rat runs of those vehicles wishing to get to the tunnel or indeed to avoid it; the rush of these commuters through residential streets, poses a danger to my children’s life as they walk to their places of learning
• I object to the artwork provided not being to scale, thus giving a false impression to those viewing it. It is misleading and deceptive
• I object to the complete lack of communication to local residents. Despite chapter 7 suggesting that information to stakeholders has been timely and accurate with provision of opportunities for the community to have their questions answered. I find this to be false. I am a stakeholder as I both live and work within the Balgowlah community. I have not received adequate nor timely information, or actually any information. It was a public schools community group that alerted me to this tunnel proposed project and EIS document NOT any official NSW government source. As a local health care worker I see a variety of locals daily. I am simply stunned by the general ignorance of the community to the tunnels proposal, its plans, the projects impact and cut-off dates for community to be involved. This could only be attributed to a severe lack of communication and education to the community stakeholders in which this proposed tunnel will mostly effect
• I object to the environmental impact on Burnt Creek. The loss of waterways to almost 96% during operation of the proposed tunnel will greatly impact the fragile environment including mature flora and fauna such as an endangered bat colony and its habitat
• I am concerned with the impact on middle harbour, Manly Dam and Manly Lagoon due to run-off from the project. I have not seen the effect on the health of these local waterways, beaches and recreational areas being thoroughly addressed
• I question, if the government is dedicated to climate change and carbon emission goals; surely there would be a view to make this tunnel not for vehicles, but rather for a train or tram infrastructure. This would increase the use of public transport, thereby decreasing traffic on the military road (probably by more than the 10% the current billion-dollar tunnel is proposing), decrease operating emissions from smokes stacks, increase speed of commute to the city and be an overall a compromise for the entire plan. I feel there needs to be more time in planning and optimal use of the tunnel discussed
• I am concerned for the value of my property. I am truly fortunate to live in a lovely area such as Balgowlah. Unfortunately with the proposed tunnel, I will lose value on my home due to the dramatic loss of local environment including creeks, walking paths and greenery, the increase of traffic congestion around my street, the increase in noise pollution from the construction, the operation and the rat racing cars due to horns being blown at all hours.
My rates are about to increase in the local council, but the environment I’m paying for is being dramatically changed for the worse.
Overall the proposed gains and benefit of the tunnel infrastructure is miniscule in comparison to the concerns addressed above.
Sincerely
Concerned Resident
I am writing to submit my concerns, uncertainty and overall objection to the Beaches Link Tunnel proposed by Transport for NSW.
There is enormous impact to local communities with the shock and subsequent decline of environment, the increased local traffic congestion and parking issues, water and air pollution as well as noise pollution. All of which is due to occur both during construction and operation of the proposed tunnel. This simply does not make logical sense when placed against huge expenditure of public funds for projected minimal gains for a very small area.
I have detailed my objections as follows:
• The desired outcome for the project is to reduce traffic congestion south of the Spit Bridge and hasten commutes. I object to the forecast of the benefits of the proposed tunnel as they were based on 2016 surveys. This therefore did not take into account the current global Covid 19 pandemic and its changed landscape for commuter’s vehicular use nor did it address the recent and successful introduction of B-line services. Less commuters due to the ability and desire of workers to work from home at least a few days a week, will obviously alleviate some traffic congestion. This ‘new normal’ presents an ill-advised and indeed foolish notion to take on this tunnel without investigating trends post 2020
• The traffic impact for the Balgowlah, Seaforth and Manly Vale communities are enormous. If the proposed tunnel goes ahead traffic and congestion will be hellish. This will be due to the construction site bringing slowed traffic conditions, large trucks entering and exiting sites, large trucks attempting tight corners, random stop-starts by manual traffic wardens, parking of contractors and workers, lack of parking for locals, and increased congestion to the already busy Condamine Street, Sydney Road and surrounding roads. Traffic impact alone gives way to greater carbon emissions, impedes current traffic flow and will cause an increase in danger to both vehicles and pedestrians
• I object to the smokestacks not being filtered. I am shocked and dismayed how this has even been approved given the proximity to local schools. Previously smokestack filtration has not been deemed financially viable compared to the health impacts. The exponential growth in respiratory conditions such as cancer, asthma attacks, emphysema, bronchiectasis and decreased lung capacity has been well documented in residential areas surrounding smokestacks, such as the M5 at Arncliffe. Failure to filtrate smokestacks considering a respiratory pandemic the world is facing is negligent. The future health care costs are not only monetary, but concern morbidity and mortality. To date, this has not been adequately addressed and needs to be thoroughly considered
• I object to the noise pollution from these works. As someone who has recently lost a significant amount of hearing due to sudden pathology, I do not wish the remainder of my precious hearing to be affected further by the proposed works. Decibel levels have been proposed to be unhealthy for kilometres surrounding the work site and operational site
• I object to the impact on no fewer than six schools in the immediate vicinity of the proposed work and operational site. Hundreds of children will be negatively affected. The noise and air pollution caused both during construction and during operation will directly affect these children’s learning and health. Personally, it would impact my child who has additional needs – the distraction of noise will impair his focus on his studies and learning – something we have worked VERY hard to achieve thus far
• I am concerned for my children who walk to school. The growth of rat runs of those vehicles wishing to get to the tunnel or indeed to avoid it; the rush of these commuters through residential streets, poses a danger to my children’s life as they walk to their places of learning
• I object to the artwork provided not being to scale, thus giving a false impression to those viewing it. It is misleading and deceptive
• I object to the complete lack of communication to local residents. Despite chapter 7 suggesting that information to stakeholders has been timely and accurate with provision of opportunities for the community to have their questions answered. I find this to be false. I am a stakeholder as I both live and work within the Balgowlah community. I have not received adequate nor timely information, or actually any information. It was a public schools community group that alerted me to this tunnel proposed project and EIS document NOT any official NSW government source. As a local health care worker I see a variety of locals daily. I am simply stunned by the general ignorance of the community to the tunnels proposal, its plans, the projects impact and cut-off dates for community to be involved. This could only be attributed to a severe lack of communication and education to the community stakeholders in which this proposed tunnel will mostly effect
• I object to the environmental impact on Burnt Creek. The loss of waterways to almost 96% during operation of the proposed tunnel will greatly impact the fragile environment including mature flora and fauna such as an endangered bat colony and its habitat
• I am concerned with the impact on middle harbour, Manly Dam and Manly Lagoon due to run-off from the project. I have not seen the effect on the health of these local waterways, beaches and recreational areas being thoroughly addressed
• I question, if the government is dedicated to climate change and carbon emission goals; surely there would be a view to make this tunnel not for vehicles, but rather for a train or tram infrastructure. This would increase the use of public transport, thereby decreasing traffic on the military road (probably by more than the 10% the current billion-dollar tunnel is proposing), decrease operating emissions from smokes stacks, increase speed of commute to the city and be an overall a compromise for the entire plan. I feel there needs to be more time in planning and optimal use of the tunnel discussed
• I am concerned for the value of my property. I am truly fortunate to live in a lovely area such as Balgowlah. Unfortunately with the proposed tunnel, I will lose value on my home due to the dramatic loss of local environment including creeks, walking paths and greenery, the increase of traffic congestion around my street, the increase in noise pollution from the construction, the operation and the rat racing cars due to horns being blown at all hours.
My rates are about to increase in the local council, but the environment I’m paying for is being dramatically changed for the worse.
Overall the proposed gains and benefit of the tunnel infrastructure is miniscule in comparison to the concerns addressed above.
Sincerely
Concerned Resident
Name Withheld
Object
Name Withheld
Object
CHATSWOOD
,
New South Wales
Message
This project is a complete waste of public money and disastrous for the local community with the cycle lanes unusable for 4 years. Please revert to a public transport solution.