Part 5 Activities
Albury Wodonga Regional Hospital Project – Construction of a New Northeast Building, Temporary At-grade Northwest Carpark, and Associated Works
Albury City
The proposal involves:
• Site preparation works, including:
— Demolition of existing hard stand areas, pedestrian infrastructure, and forty-one car parking spaces of the existing lower staff at-grade carpark (Car Park A);
— Tree removal;
— Relocation of existing fire hydrant and inground services diversions.
• Construction of a new two storey Northeast Building including administration, outpatient clinics, education training and research, and pharmacy departments, with new bridge connection to Level 02 corridor of adjacent existing building (surgical wards and operating theatres (at public entry level).
• Construction of a new at-grade temporary car park with thirty-nine (39) spaces to the northwest of the Hospital Campus.
• An additional seven (7) permanent car parking spaces to be located at Car Park E.
• Make good the interface to the existing building, and surrounding pedestrian paths and line marking.
• Installation of wayfinding signage.
• New tree planting and landscaping works