Part 5 Activities

Determined

BELLAMBI LAGOON EMERGENCY MECHANICAL ENTRANCE OPENING FOR FLOOD MITIGATION

Wollongong

Recent large ocean swell increased water levels in the lagoon and the height of the berm at the mouth of Bellambi Lagoon is preventing water to flow back out, creating localised flooding. The proposed work will open Bellambi Lagoon to the ocean, with a 1m-wide channel, long enough only to break through the berm. This will be done near high tide, and if possible with rain if it is forecast. The opening will be sufficient for scouring flow to develop. The backhoe operator will dig a pilot channel from the oceanward end toward the lagoon approximately a bucket-width wide with the bed graded to the ocean. The last section of the channel (at the lagoon end) to be opened at the time of the next possible high tide (i.e. the highest possible tide of the day). Initiation of a breakout at this time is likely to result in the most effective and sustained mechanical breakout due to the increasing head difference through the course of the breakout.

Review of Environmental Factors (REF) (1)

The approved project is described in the REF, as modified by any associated decision statement (see supporting documents).
Review of Environmental Factors
ECM_25603259_v10_Bellambi Lagoon Emergency Mechanical Entrance Opening for Flood Mitigation EP REF 2024 5
Date : Fri, 23/08/2024 - 09:50

Activity Details

Reference number
P5-2024-136
Proponent(s)
Wollongong City Council
Address
Turner Esplanade Bellambi 2518
Birch Crescent Bellambi 2518
Legislation
TISEPP (State Environmental Planning Policy (Transport & Infrastructure) 2021)
Activity Type
Waterway or foreshore management activities
Decision
Approved
Determination date