Part 5 Activities
Construction (inlcuding dredging) and Operation of new berthing facility - Ulladulla Harbour
Shoalhaven
The proposed activities are:
• dredging part of the harbour bed to a navigable depth (including removal ofmudstone rock platform in the southern comer) as shown in Figure 5 of the REF
• construction of a floating pontoon public berthing facility with 19 berths (Figure 6 of the REF)
• operation of the berthing facility.
The berthing facility would include
• fabrication and provision of new floating pontoon berthing facility
• installation of mooring piles, pontoon restraint piles and jetty support piles
• establishment of 19 berths with a mixture of 4.5 to 5.5 metre widths and 8 to 12 metre lengths
• construction of concrete paths, security gate and fence
• construction of platforms and gangway ramp to access the pontoon
• provision of effluent pump-out, power and water supply