The proposed activities are:

• dredging part of the harbour bed to a navigable depth (including removal ofmudstone rock platform in the southern comer) as shown in Figure 5 of the REF
• construction of a floating pontoon public berthing facility with 19 berths (Figure 6 of the REF)
• operation of the berthing facility.

The berthing facility would include
• fabrication and provision of new floating pontoon berthing facility
• installation of mooring piles, pontoon restraint piles and jetty support piles
• establishment of 19 berths with a mixture of 4.5 to 5.5 metre widths and 8 to 12 metre lengths
• construction of concrete paths, security gate and fence
• construction of platforms and gangway ramp to access the pontoon
• provision of effluent pump-out, power and water supply

Review of Environmental Factors (REF) (1)

The approved project is described in the REF, as modified by any associated decision statement (see supporting documents).
Review of Environmental Factors
Review of Environmental Factors REF - construction and operation of new berthing facility - Ulladulla Harbour
Date : Tue, 22/08/2023 - 17:30

Activity Details

Reference number
P5-2023-102
Proponent(s)
Shoalhaven City Council
Address
Ulladulla Harbour
Legislation
TISEPP (State Environmental Planning Policy (Transport & Infrastructure) 2021)
Activity Type
Port, wharf or boating facilities
Decision
Approved