Jetty Repair (through renewal), St Georges Basin estuary, The Basin Road, St Georges Basin
Shoalhaven
The proposed activity would comprise:
• demolition and removal of the existing 34 metre long by 0.9 metre wide timber jetty decking and existing concrete approach (existing footings would be retained and reused)
• replacement of decking with a fixed height composite fibre (FRP) jetty on new bearers
• installation of concrete strip-footing and associated subsurface drainage
• installation of seating and fishing-rod holders
• provision of new fish cleaning table and solar light
• connection to water for the fish cleaning table and provision of drain and conduit for fish waste into the estuary.
Works would also involve the implementation of safeguards and mitigation measures prescribed in Section 7 of the Review of Environmental Factors (REF).