Jetty Repair (through renewal), St Georges Basin estuary, The Basin Road, St Georges Basin

Shoalhaven

The proposed activity would comprise:
• demolition and removal of the existing 34 metre long by 0.9 metre wide timber jetty decking and existing concrete approach (existing footings would be retained and reused)
• replacement of decking with a fixed height composite fibre (FRP) jetty on new bearers
• installation of concrete strip-footing and associated subsurface drainage
• installation of seating and fishing-rod holders
• provision of new fish cleaning table and solar light
• connection to water for the fish cleaning table and provision of drain and conduit for fish waste into the estuary.
Works would also involve the implementation of safeguards and mitigation measures prescribed in Section 7 of the Review of Environmental Factors (REF).

Review of Environmental Factors (REF) (1)

The approved project is described in the REF, as modified by any associated decision statement (see supporting documents).
Review of Environmental Factors
Review of Environmental Factors REF - Jetty Renewal - St Georges Basin Estuary - The Basin Road St Georges Basin
Date : Wed, 04/10/2023 - 09:39

Activity Details

Reference number
P5-2023-124
Proponent(s)
Shoalhaven City Council
Address
The Basin Road St Georges Basin 2540
Legislation
TISEPP (State Environmental Planning Policy (Transport & Infrastructure) 2021)
Activity Type
Port, wharf or boating facilities
Decision
Approved
Determination date