Review Environmental Factors-REF03624-Stage 2C Botanic Gardens Rainforest Walk
Wollongong City Council
To objective to complete an accessible compliant path. The existing blue metal/mulch path will be replaced. Existing trees will be protected but approx. 19 trees will be removed, and one tree pruned. See Appendix D for detail information.
Stage 2 C
Asphalt Pathway - 27m long x 1.8m wide x 200mm deep
Install Flush Concrete Edge to asphalt path 150 x 150mm
Install brick paver edge – woodlands garden unit pavers
Install Node Paving
Make good connection to existing mulch paths
Install Treetop Rainforest Canopy Bridge - 58m long
Install Nature Artwork to be developed
Install sandstone retaining wall at Node 1 and southern asphalt path.
Random rock boulders for informal seating at nodes