Part 5 Activities
Stormwater Management System upgrade - Bendalong Boat Harbour
Shoalhaven
The proposed activity is the upgrade of the stormwater management system at Bendalong Boat Harbour
• the installation of approximately 100 metres of new stormwater reinforced concrete pipes (RCP) of various diameters
• installation of five pits of various configurations
• construction of a stormwater outlet structure comprised of pipeline, Rock Bags and geotextile
• rock-lined drains
• kerb and gutter
• repair and reinstatement of the road pavement
• earthworks for the installation of the upgraded stormwater system and stabilisation of batters
• installation of rock logs to prevent vehicle access onto beach
• decommissioning of existing stormwater facilities (two outlet pipes and associated headwalls)
• associated vegetation clearing necessary to undertake the works.
The proposed activity would also involve the implementation of safeguards and mitigation measures prescribed in Section 7 of the Review of Environmental Factors (REF).