Part 5 Activities
Stormwater System Upgrade - Cameron and Hayward Street - Conjola Park
Shoalhaven
The proposed activity is the upgrade of the stormwater management system within the Hayward Street road Reserve and Cameron Street, Conjola Park, between Cameron Street and Sandra Street Conjola Park. Works are likely to be undertaken in stages determined by funding availability, however stages are likely to be:
1. Esme Street to Sandra Street
2. Cameron Steet to Esme Street
The activity would involve the following works:
• Installation of approximately 260 metres of 375mm to 900mm diameter reinforced concrete pipe (RCP) along Cameron Street and Hayward Street road reserve and associated earthworks and vegetation removal (including trees).
• Installation of stormwater pits.
• Creation of grassed swale drains above the RCP within the Hayward Road road reserve.
• Installation of layback kerb at the end of Cameron Street and associated road pavement works.
• Installation of scour protection (3.5 metres length using basalt spalls) at the Sandra Street stormwater outlet.
Review of Environmental Factors (REF) (2)
Activity Details
Conjola Park