Capital Investment Value > $20M and lodged before 1 March 2018
Integrated Development
(Former) Sydney East Joint Regional Planning Panel
Staged mixed-use development including the following works resulting in the construction of 3 x 13-storey mixed-use buildings with 242 residential units, 4 commercial tenancies and 308 car parking spaces within a basement configuration. The staging includes the following works:
Prior to Stage One works subdivision based upon the staging of the mixed-use development.
Stage One Works including:
Demolition of existing buildings within Stage One including demolition of the existing building on proposed Lot 1;
Site works, remediation and excavation for proposed Lot 1;
Construction of proposed driveway access;
Erection of Building "C" being a 13-storey mixed-use building with ground floor retail, basement level car parking and associated landscaping.
Stage Two Works including:
Demolition of existing buildings within Stage Two including demolition of the existing building on proposed Lot 2;
Site works, remediation and excavation for proposed Lot 2;
Construction of proposed driveway as an extension of Lot 1 driveway;
Erection of Buildings "A" and "B" being 2 x 13-storey mixed-use buildings with ground floor retail, basement level car parking and associated landscaping.