Planning proposals
Proposed amendments to Fairfield Local Environmental Plan 2013 – Accelerated LEP Review – Stage 1 (0 dwellings/ 0 Jobs)
Fairfield
The planning proposal represents Stage 1 in the accelerated review of the Fairfield LEP 2013 and includes the following:
• Inclusion of a new aim linking the Fairfield LEP 2013 to Council’s draft PSPS;
• New local clauses and additional objectives under existing clauses to address priorities and actions contained in Council’s draft LSPS;
• Amendments to Schedule 2 (Exempt Development) – increase the maximum period of temporary uses on Council land from 52 to 104 days, permit storage of goods on Council owned footpaths without the need for development consent, new category of ‘emergency works’ on Council owned/managed land;
• Updating the existing property/site details appearing in Schedule 5 Environmental Heritage to clarify planning considerations relevant to these site; and
• Amendments to the land use zoning of various parcels of land that addresses zoning anomalies to promote greater certainty for future development of the relevant sites