56-60 PYRMONT BRIDGE ROAD PYRMONT 2009

Under Consideration

56-60 PYRMONT BRIDGE ROAD PYRMONT 2009 Infrastructure NSW Planning Agreement

Sydney

Infrastructure NSW (Developer) has made an offer to enter into the Planning Agreement with the Minister to secure the provision of development contributions in connection with the State Environmental Planning Policy Amendment (Blackwattle Bay Precinct) 2022 (Precinct SEPP), further proposed changes to relevant environmental planning instruments to delete the minimum non-residential floor space control applying to ‘Area 17’ (Proposed Precinct (Further Amendment) SEPP), and future development applications which the Developer proposes to make on the Subject Land for the following development (Future Development):
1. development which became permissible on the Subject Land as a result of the Precinct SEPP; and
2. in the case of development within ‘Area 17’, includes development for which development consent may be granted as a result of the making of the Proposed Precinct (Further Amendment) SEPP.
The Planning Agreement facilitates:
1. the delivery of works contributions by the Developer towards the provision of State public infrastructure, being:
(a) construction of a cycleway on land defined as the Bank Street Cycleway Land;
(b) works, including demolition, site preparation, remediation, seawall, landscaping and embellishment of open space for public recreation and community facilities, and
other ancillary permissible land uses, carried out on land defined as the Bank Street Park Land;
(c) construction of a boardwalk over water at land defined as the Boardwalk Land;
(d) works, including demolition, remediation and embellishment works, on land defined as the Miller Street Reserve Land;
(e) the provision of Public Art, to the value set out in Schedule 6 Clause (2)(b) of the Planning Agreement, and at the locations set out in a ‘Public Art Plan’ to be prepared;
(f) construction of a cycleway for active transport and recreation on land defined as the Pyrmont Bridge Road Cycleway Extension Land;
(g) works to be carried out on land defined as the Sydney Fish Market Urban Park Land, including foreshore connection works;
(h) works, including demolition, remediation, seawall and drainage works and embellishment, carried out on land defined as the Waterfront Promenade Land;
(i) construction of approximately 1,200 square metres of space for cultural and creative uses (which may include meeting rooms, indoor recreation facilities/
amenities and the like) on land defined as the Cultural and Creative Uses Land;
(j) carrying out of intersection upgrades, including intersection reconfiguration and signals, at the intersection of Bank Street and Miller Street; and
(k) carrying out of road and intersection works at the Wattle Street intersection;
2. the payment of monetary contributions towards the Pyrmont Peninsula Metro Station and to local infrastructure; and
3. the transfer and / or dedication of land on which the contribution works have been constructed.

The Blackwattle Bay state-assessed rezoning proposal is also being exhibited on the NSW Planning Portal at www.planningportal.nsw.gov.au/ppr/blackwattle-bay.

Notified Documents (2)

Explanatory Note
Explanatory Note (Notification)
VPA Applicant signed
Planning Agreement (INSW Signed Revised)

Project Details

SVPA reference number
SVPA2024-33
Developer name
Infrastructure NSW
Notification start-end date
-
Notification Location
At any Service NSW centre. To find the centre nearest to you visit the website at Service NSW . Alternatively, you can call 13 77 88.