State Significant Infrastructure
Determination
Central-West Orana REZ Transmission
Warrumbungle Shire
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Development of new twin double circuit 500 kV transmission lines between Wollar and the proposed substations at Merotherie and Elong Elong, and connections from these lines to renewable energy generation and storage projects in the CWO REZ
Modifications
Determination