Skip to main content

State Significant Development

Determination

Springvale Water Treatment Facility

Lithgow City

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Consolidated Consent

Consolidated Consent

Archive

Request for SEARs (1)

SEARS (1)

EIS (20)

Response to Submissions (2)

Amendments (2)

Recommendation (8)

Determination (3)

Approved Documents

Management Plans and Strategies (13)

Reports (4)

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

21/10/2020

10/05/2022

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 341 - 360 of 454 submissions
Tamara Radic
Object
Port Melbourne , Victoria
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Tamara Radic
211/232-242 Rouse Street
Port Melbourne Victoria 3207
Monday, October 31, 2016 - 21:29

Jan Spencer
Object
Rozelle , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Jan Spencer
49 Foucart Street
Rozelle New South Wales 2039
Monday, October 31, 2016 - 21:23

Denis Duchesne
Comment
Quakers Hill , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Denis Duchesne
18 Bellbird Ct
Quakers Hill New South Wales 2763
Monday, October 31, 2016 - 21:19

Ben Evans
Object
Golden Square , Victoria
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Ben Evans
128 Symonds Street
Golden Square Victoria 3555
Monday, October 31, 2016 - 21:17

Sally Curry
Object
Mardunna , Tasmania
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Sally Curry
577 Sommers Bay Rd
Murdunna Tasmania 7178
Monday, October 31, 2016 - 20:20

Kate Tysoe
Object
Woy Woy , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

kate Tysoe
39 woy woy rd
woy woy New South Wales 2256
Monday, October 31, 2016 - 19:59

John Rimmer
Object
Parkville , Victoria
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

I am writing as a person who visits and highly values the Greater Blue Mountains World Heritage Area.

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

The Coxs River is not a drain for mine water. The river must be restored to health, because it flows through our Blue Mountains World Heritage Area.

The release of treated mine water will increase the nutrient status of the Coxs River and possibly lead to massive outbreaks in aquatic weeds or algal blooms downstream.

John Rimmer
PO Box 53
Parkville Victoria 3052
Monday, October 31, 2016 - 19:54

Sonja Ebzery
Object
Fymea , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Sonja Ebzery
13 Darryl pl
Fymea New South Wales 2227
Monday, October 31, 2016 - 19:23

Eryl Brady
Object
Maroubra , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Eryl Brady
3 Torrington Rd
Maroubra New South Wales 2035
Monday, October 31, 2016 - 19:18

Ben Keyzer
Object
WAGGA WAGGA , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Ben Keyzer
Johnston st
Wagga Wagga New South Wales 2650
Monday, October 31, 2016 - 19:16

Laurie Bimson
Object
Frenchs Forest , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Laurie Bimson
25 rabbett st Frenchs forest
Frenchs forest New South Wales 2086
Monday, October 31, 2016 - 18:37

Shef Kane
Object
Clovelly Park , South Australia
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

shef kane
41 Celtic ave
clovelly park South Australia 5042
Monday, October 31, 2016 - 18:07

Lorraine Higgins
Object
Melbourne , Victoria
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Lorraine Higgins
Banchory Street
Melbourne Victoria 3040
Monday, October 31, 2016 - 17:51

Simone Young
Object
Terrey Hills , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Simone Young
18 Nambucca road
Terrey Hills New South Wales 2084
Monday, October 31, 2016 - 17:43

Kerith Power
Object
Emu Heights , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.


Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.


Kerith Power
17, Strathdon Rd
Emu Heights New South Wales 2750
Monday, October 31, 2016 - 17:29

Penny Osterhaus
Object
Jamberoo , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

penny osterhaus
"wallaya " budderoo fire trail
jamberoo New South Wales 2533
Monday, October 31, 2016 - 17:14

Jason Hay
Object
Gormans Hill , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Jason Hay
32b Dees Close
Gormans Hill New South Wales 2795
Monday, October 31, 2016 - 17:13

Kelly Owen
Object
Raymond Terrace , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Kelly Owen
35 Manning Avenue
Raymond Terrace New South Wales 2324
Monday, October 31, 2016 - 17:09

Jeanette Brackstone
Object
Bangor , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Jeanette Brackstone
31 Yanderra Ave
Bangor New South Wales 2234
Monday, October 31, 2016 - 16:33

Karen Hull
Object
Denistone , New South Wales
Message
Mining and Industry Projects
NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001

Dear Sir/Madam,

Submission on the Springvale Water Treatment proposal (SSD 16_7592)

The Springvale water treatment proposal must be greatly improved if it is to adequately protect the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Mine water must not be simply treated to a minimum standard then released into the catchment.

Wangcol Creek is already contaminated. Discharges from the proposed treatment plant would worsen this situation and send a plume of salt down the Coxs River that is part of Sydney's drinking water catchment.

The treatment proposal must maximise mine water use by storing it for future periods of high demand by the Mt Piper Power Plant. Water treatment must be decoupled from the power plant's coal consumption to prevent an outcome where a reduction in coal-fired electricity generation would cause an increase in mine water pollution.

The water treatment plant must not be built for discharge into the environment. It can be designed as a closed system with treated mine water stored in Thompsons Creek Reservoir which has sufficient capacity to accommodate mine water from both Springvale and Clarence mines for future power plant use.

To take advantage of future mine water transfer upgrades, the proposed pipeline from Springvale to Mt Piper power plant should have sufficient capacity to accommodate mine water from Clarence Colliery.

Runoff from the Springvale Coal Services and fly ash emplacement areas also must be collected and treated for use in the power plant.

Any additional pipeline construction on Newnes Plateau for the mine water transfers must follow the existing pipeline alignment to minimise further damage to endangered ecological communities and pagoda landscapes.

Karen Hull
17 Pennant Avenue, Denistone. 2114
Sydney New South Wales 2114
Monday, October 31, 2016 - 15:06

Pagination

Project Details

Application Number
SSD-7592
Assessment Type
State Significant Development
Development Type
Water supply & management
Local Government Areas
Lithgow City
Decision
Approved
Determination Date
Decider
IPC-N
Last Modified By
SSD-7592-Mod-11
Last Modified On
28/03/2025

Contact Planner

Name
Anthony Ko