State Significant Infrastructure
Determination
Sydney CBD Light Rail
Inner West
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Sydney CBD Light Rail
Consolidated Approval
CSELR Consolidated instrument __MOD_6
Modifications
Determination
Determination
Determination
Determination
Determination
Determination
Archive
Application (2)
DGRs (2)
EIS (44)
Submissions (9)
Response to Submissions (4)
Determination (6)
Approved Documents
There are no post approval documents available
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
There are no enforcements for this project.
Inspections
31/01/2020
29/04/2020
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.
Submissions
Showing 141 - 160 of 495 submissions
Name Withheld
Object
Name Withheld
Object
,
New South Wales
Message
1. Travel time will take longer on light rail. I can catch an express bus from Duffy's corner Matraville (cnr of Anzac Pde and Beachaump Rd) at 8am and get to Chifley square in 37 minutes. To do this on light rail I will have to catch a bus to Kingsford (approx 15 min), switch to light rail with thousands of people (approx 10min) and then take 37 min on light rail to Wynyard then walk to Chifley Square (20min). In total this trip would take 82 min almost 3 times the travelling time.
2. The light rail should be extended to at least Malabar or La Perouse.
3. The proposed stop at the UNSW will not be feasible. Light rail crossing 4 lanes of traffic that is fully congested during peak time will cause super congestion.
4. There was no consideration given to bus users along Bunnerong Rd and how they will interchange with the light rail at Kingsford.
5. There was no consideration given to the amount of bicycles that use the current bus lanes. The buses do not use bus lanes because they are full of slow bicycles. The bus then uses a normal lane shared with cars. There will be one less lane due to the light rail so effectively cars and buses will just have access to one lane for the entire trip along Anzac Pde from Kingsford to the city.
6. There was no consideration given to people with a disability, parents with prams or the elderly. Forcing people to get off the light rail and switch to buses at Kingsford where it will be extremely busy is lacking in vision.
7. It will probably cost more and take longer to get to the city.
8. The bus strategy should not be separate to light rail and I am still waiting to hear from the bus expert on what the strategy will be.
9. There has been no communication on which buses will be terminated.
10. I still cannot understand how congestion will not increase with buses, light rail, cars and bicycles all on the roads.
11. I live in Randwick area and I am really frustrated when Light rail enthusiats comment on how good it will be for people travelling to the footy or to the races. These people generally travel on weekends or very rarely. I travel on public transport approximately 480 times during the year and there has been no consideration to the inconvenience I will experience.
2. The light rail should be extended to at least Malabar or La Perouse.
3. The proposed stop at the UNSW will not be feasible. Light rail crossing 4 lanes of traffic that is fully congested during peak time will cause super congestion.
4. There was no consideration given to bus users along Bunnerong Rd and how they will interchange with the light rail at Kingsford.
5. There was no consideration given to the amount of bicycles that use the current bus lanes. The buses do not use bus lanes because they are full of slow bicycles. The bus then uses a normal lane shared with cars. There will be one less lane due to the light rail so effectively cars and buses will just have access to one lane for the entire trip along Anzac Pde from Kingsford to the city.
6. There was no consideration given to people with a disability, parents with prams or the elderly. Forcing people to get off the light rail and switch to buses at Kingsford where it will be extremely busy is lacking in vision.
7. It will probably cost more and take longer to get to the city.
8. The bus strategy should not be separate to light rail and I am still waiting to hear from the bus expert on what the strategy will be.
9. There has been no communication on which buses will be terminated.
10. I still cannot understand how congestion will not increase with buses, light rail, cars and bicycles all on the roads.
11. I live in Randwick area and I am really frustrated when Light rail enthusiats comment on how good it will be for people travelling to the footy or to the races. These people generally travel on weekends or very rarely. I travel on public transport approximately 480 times during the year and there has been no consideration to the inconvenience I will experience.
Patrick Molloy
Object
Patrick Molloy
Object
Randwick
,
New South Wales
Message
The current proposals for the parking spaces on Alison Road which are situated outside my apartment block are to be transformed into road traffic lanes. As a resident who possesses a car and is lucky enough to have a garage with the dwelling I have Major Safety concerns with this proposition. I currently back onto Alison Road from the garage which has the protective parking lane. With the new proposed changes I would reverse out onto a blind corner and into heavy oncoming traffic.
I consider that parking for residents, deliveries and visitors has not been considered for either.
I consider that parking for residents, deliveries and visitors has not been considered for either.
Name Withheld
Object
Name Withheld
Object
Surry Hills
,
New South Wales
Message
I wish to voice my opposition for the proposed design of the CBD and South East Light Rail project (CSELR) as described in the Environmental Impact Statement (EIS) dated November 2013. I do not agree with the proposal as stated in the EIS document.
My concerns in relation to the CSELR project and the EIS, with particular interest with the Surry Hills to Moore Park West route, are summarised below:
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
My concerns in relation to the CSELR project and the EIS, with particular interest with the Surry Hills to Moore Park West route, are summarised below:
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Mark Ehrman
Support
Mark Ehrman
Support
Redfern
,
New South Wales
Message
In general I support the CSELR project and believe it is a necessary project for Sydney's long-term traffic management strategy, but I have several concerns with the EIS as submitted and cannot support certain aspects of the project.
Construction impacts are never easy and must be considered a necessary evil of infrastructure projects. As a resident, I am willing to sacrifice short-term inconvenience for long-term benefit, and I encourage other residents to adopt a similar viewpoint.
I support the plan to run down Devonshire Street, and accept the government's statements that underground routes along Foveaux or Devonshire Streets are not feasible primarily due to interference with the Eastern Distributor..
My concerns are with the permanent, ongoing operational impacts, especially in Surry Hills.
Specifically, in rank order, I am concerned with the following:
Use of overhead lines for the majority of the route (except certain CBD areas)
inclusion of "property treatments" as a noise mitigation proposal
long term viability of the project, especially given the failures of other Sydney transport options such as the existing light rail and monorail.
I strongly object to the proposal to rely on overhead power lines for the majority of the route. This is not best practice globally and has significant negative visual impact along the entire route. Every effort should be made to use wireless power options, similar to what is proposed for the CBD sections along George Street. Do not permanently sacrifice our cityscape to save money or effort in the planning and development stages. You must eliminate overhead wiring as much as possible.
"Property treatments" should be used as an absolute lsat resort in noise mitigation strategies. Reduce the noise impact in the design and planning phases using some of the other options proposed in the EIS. I support the use of vegetated trackforms as that will have the greatest positive impact on the appearance of the project, as well as being eco-friendly. As mentioned in the EIS, it has been done successfully in Europe and I have no doubt it can be successfully adapted for this project here in Sydney.
Lastly, this project needs to be priced right, fulfil the promise of reliable and efficient transport to and from the CBD and offer clear advantages over the existing transport options. This project must be a commercial and absolute success to not follow the ill-fated light rail system into uselessness and waste of money.
Construction impacts are never easy and must be considered a necessary evil of infrastructure projects. As a resident, I am willing to sacrifice short-term inconvenience for long-term benefit, and I encourage other residents to adopt a similar viewpoint.
I support the plan to run down Devonshire Street, and accept the government's statements that underground routes along Foveaux or Devonshire Streets are not feasible primarily due to interference with the Eastern Distributor..
My concerns are with the permanent, ongoing operational impacts, especially in Surry Hills.
Specifically, in rank order, I am concerned with the following:
Use of overhead lines for the majority of the route (except certain CBD areas)
inclusion of "property treatments" as a noise mitigation proposal
long term viability of the project, especially given the failures of other Sydney transport options such as the existing light rail and monorail.
I strongly object to the proposal to rely on overhead power lines for the majority of the route. This is not best practice globally and has significant negative visual impact along the entire route. Every effort should be made to use wireless power options, similar to what is proposed for the CBD sections along George Street. Do not permanently sacrifice our cityscape to save money or effort in the planning and development stages. You must eliminate overhead wiring as much as possible.
"Property treatments" should be used as an absolute lsat resort in noise mitigation strategies. Reduce the noise impact in the design and planning phases using some of the other options proposed in the EIS. I support the use of vegetated trackforms as that will have the greatest positive impact on the appearance of the project, as well as being eco-friendly. As mentioned in the EIS, it has been done successfully in Europe and I have no doubt it can be successfully adapted for this project here in Sydney.
Lastly, this project needs to be priced right, fulfil the promise of reliable and efficient transport to and from the CBD and offer clear advantages over the existing transport options. This project must be a commercial and absolute success to not follow the ill-fated light rail system into uselessness and waste of money.
Name Withheld
Object
Name Withheld
Object
Coogee
,
New South Wales
Message
I do not support the proposed plans
Stephen Hodgkinson
Object
Stephen Hodgkinson
Object
Kensington
,
New South Wales
Message
I am writing to oppose the South East Light Rail project as it represents a very poorly thought out project that will not provide any real benefits to residents of south east Sydney over that available via the existing bus transport network.
In summary, my objections are:
* It will be slow
* the route is not convenient
* it will be easily disrupted by vehicular traffic
* it will have significant impact on the streetscape
* it will provide no real additional capacity over that of the existing bus network
* the proposed tram stops are completely over the top and there will be too few stops especially since the existing bus routes are to be discontinued
* the concept will have significant impact on vehicular traffic
* forcing people to change at Randwick and Kingsford is madness
The EIS acknowledges that the network will operate at near 100% capacity from day one. Population density in the South East is increasing and any enhancement to public transport needs to plan for more capacity, not commit to a project that only keeps capacity the same as at present. The South East tram is not a plan, but more like a misguided, poorly thought out, half baked scheme dreamed up by someone who has very little knowledge of what is required to provide a workable public transport network.
The route across Moore Park, through the Olivia Gardens apartment block, to Central and down George St is a very poorly thought out route. This route is not a convenient way to get to the city from the south east and without a tram along Parramatta Road, will also disrupt bus travel from the inner west from Parramatta Road. The journey time along George St from Circular Quay to Central will be woefully slow as the trams will be restricted to around 20kmh along the pedestrianised George Street.
If the tram is to proceed, the 19th century route from the south east and Moore Park via Taylor Square and Elizabeth St is a much better thought out route and imposes less overall disruption to existing services. The old inner west tram route along Parramatta Road, Broadway and down George St also worked. The present plan will cause major disruption to lots of people with few benefits. Our forebears knew what they were doing, which is more than can be said for our present planners.
Street based trams are very susceptible to being disrupted by motor vehicles. Street based routes will of necessity require numerous traffic lights at intersections and 45 metre long trams will not be easy to get around. Whilst accidents should not occur all that often, when they do, the impact will be significant and the disruption will bring the entire tram network to a halt. It is worth remembering that the existing Lilyfield trams were recently cancelled for several WEEKS due to a couple of relatively minor derailments.
FORCING people to interchange at stops in Randwick and Kingsford is not a good solution as this will INCREASE overall travel time from Maroubra, Pagewood etc to the city and provide a DISINCENTIVE for use of the system. Journey times will increase rather than decrease when the journey time of the slower tram, the inconvenience of having to interchange and the less convenient route to the city is considered. Any system that FORCES people to change is not a step forward. A public transport system that provides an INCENTIVE (via a potential quicker journey) works. FORCING people to interchange does not.
The proposed tram stops are completely over the top in concept and look like those that would be used for a metro rail network rather than a hop on hop off low floor tram stop. The stops will need to be 45 metres long. Having fewer access points to the trams through Randwick, Kensington and the inner city will reduce access to public transport, not improve it.
The tram stop at Randwick in the park near Avoca St will have a significant impact on the park itself. The proposed route along Wansey Road will require a significant number of trees to be removed.
The disruption while constructing the tram tracks along George St will be enormous. Has any real thought been given to the practical implications that construction will have on the existing electricity, water, gas, sewerage and telecommunications infrastructure below the street in George St? There is a lot of existing infrastructure that will need to be relocated prior to tracks being able to be laid. This will mean that several years of disruption will occur while services are being relocated in which existing George St bus traffic will have to be relocated away from George St without any benefits accruing to anyone while construction is underway.
What then is my preferred position?
There is a need to improve public transport in Sydney's South East as the existing bus network is overcrowded. There have been well thought out published plans developed by the NSW Government in recent years. These plans include the Eastern Suburbs Railway extension and the South East Metro.
One better solution as identified in the 2001 Ron Christie developed Long Term Strategic Plan for Rail was to build the south east extension to the Eastern Suburbs Railway. This was planned to have stops at Charing Cross, Frenchmans Road, Randwick, UNSW and Kingsford and thus serve a number of the locations that the proposed tram network would serve. It would provide significantly more capacity and being built underground, it would be vastly less disruptive to construct. The dedicated route would also provide a quicker journey time to that of the proposed tram network. The Eastern Suburbs Railway extension would also obviously integrate very well with the existing rail network. The tram network will not integrate all that well with other public transport and will require passengers to pass through ticket barriers each time they change.
Another better solution is the South East Metro project as also proposed in the 2001 Long Term Strategic Plan for Rail. Ron Christie knew what he was doing when putting the Long Term Strategic Plan for Rail together, he understood rail transport and understood how to develop a well thought out rail project. An underground metro scheme could provide operational benefits through driverless trains as currently proposed for the North West rail network.
The 2001 Long Term Strategic Plan for Rail metro rail plan with stations at St James, Taylor Square, Moore Park, UNSW, Randwick, Kingsford and Maroubra could be developed as an underground cut and cover type tunnel with driven tunnels into the city. This scheme would also link up with Moore Park and the existing rail network at St James and potentially Wynyard. As such, it would impose minimal disruption to existing street based traffic in the long term, it would provide substantially quicker journery times and would be easier to construct. The stations, being underground would have minimal impact at street level.
The South East Metro is potentially a better solution than the ESR as it could increase the "reach" of rail transport into more areas of Sydney presently not presently served by rail, especially if it was developed as part of a wider network. The Long Term Strategic Plan for Rail was well thought out and is well worth adopting. It is acknowledged that it would be a more expensive than the ESR or the tram network, though would provide more benefits to Sydney than the huge amount of money proposed to be squandered on the Westconnex 1950's mentality motorway.
Both the ESR extension and the South East Metro can happily coexist with street level bus networks.
I urge you to reject the South East tram network entirely and invest in a better, more worthwhile public transport scheme as described in the Long Term Strategic Plan for Rail.
Regards,
Stephen Hodgkinson
In summary, my objections are:
* It will be slow
* the route is not convenient
* it will be easily disrupted by vehicular traffic
* it will have significant impact on the streetscape
* it will provide no real additional capacity over that of the existing bus network
* the proposed tram stops are completely over the top and there will be too few stops especially since the existing bus routes are to be discontinued
* the concept will have significant impact on vehicular traffic
* forcing people to change at Randwick and Kingsford is madness
The EIS acknowledges that the network will operate at near 100% capacity from day one. Population density in the South East is increasing and any enhancement to public transport needs to plan for more capacity, not commit to a project that only keeps capacity the same as at present. The South East tram is not a plan, but more like a misguided, poorly thought out, half baked scheme dreamed up by someone who has very little knowledge of what is required to provide a workable public transport network.
The route across Moore Park, through the Olivia Gardens apartment block, to Central and down George St is a very poorly thought out route. This route is not a convenient way to get to the city from the south east and without a tram along Parramatta Road, will also disrupt bus travel from the inner west from Parramatta Road. The journey time along George St from Circular Quay to Central will be woefully slow as the trams will be restricted to around 20kmh along the pedestrianised George Street.
If the tram is to proceed, the 19th century route from the south east and Moore Park via Taylor Square and Elizabeth St is a much better thought out route and imposes less overall disruption to existing services. The old inner west tram route along Parramatta Road, Broadway and down George St also worked. The present plan will cause major disruption to lots of people with few benefits. Our forebears knew what they were doing, which is more than can be said for our present planners.
Street based trams are very susceptible to being disrupted by motor vehicles. Street based routes will of necessity require numerous traffic lights at intersections and 45 metre long trams will not be easy to get around. Whilst accidents should not occur all that often, when they do, the impact will be significant and the disruption will bring the entire tram network to a halt. It is worth remembering that the existing Lilyfield trams were recently cancelled for several WEEKS due to a couple of relatively minor derailments.
FORCING people to interchange at stops in Randwick and Kingsford is not a good solution as this will INCREASE overall travel time from Maroubra, Pagewood etc to the city and provide a DISINCENTIVE for use of the system. Journey times will increase rather than decrease when the journey time of the slower tram, the inconvenience of having to interchange and the less convenient route to the city is considered. Any system that FORCES people to change is not a step forward. A public transport system that provides an INCENTIVE (via a potential quicker journey) works. FORCING people to interchange does not.
The proposed tram stops are completely over the top in concept and look like those that would be used for a metro rail network rather than a hop on hop off low floor tram stop. The stops will need to be 45 metres long. Having fewer access points to the trams through Randwick, Kensington and the inner city will reduce access to public transport, not improve it.
The tram stop at Randwick in the park near Avoca St will have a significant impact on the park itself. The proposed route along Wansey Road will require a significant number of trees to be removed.
The disruption while constructing the tram tracks along George St will be enormous. Has any real thought been given to the practical implications that construction will have on the existing electricity, water, gas, sewerage and telecommunications infrastructure below the street in George St? There is a lot of existing infrastructure that will need to be relocated prior to tracks being able to be laid. This will mean that several years of disruption will occur while services are being relocated in which existing George St bus traffic will have to be relocated away from George St without any benefits accruing to anyone while construction is underway.
What then is my preferred position?
There is a need to improve public transport in Sydney's South East as the existing bus network is overcrowded. There have been well thought out published plans developed by the NSW Government in recent years. These plans include the Eastern Suburbs Railway extension and the South East Metro.
One better solution as identified in the 2001 Ron Christie developed Long Term Strategic Plan for Rail was to build the south east extension to the Eastern Suburbs Railway. This was planned to have stops at Charing Cross, Frenchmans Road, Randwick, UNSW and Kingsford and thus serve a number of the locations that the proposed tram network would serve. It would provide significantly more capacity and being built underground, it would be vastly less disruptive to construct. The dedicated route would also provide a quicker journey time to that of the proposed tram network. The Eastern Suburbs Railway extension would also obviously integrate very well with the existing rail network. The tram network will not integrate all that well with other public transport and will require passengers to pass through ticket barriers each time they change.
Another better solution is the South East Metro project as also proposed in the 2001 Long Term Strategic Plan for Rail. Ron Christie knew what he was doing when putting the Long Term Strategic Plan for Rail together, he understood rail transport and understood how to develop a well thought out rail project. An underground metro scheme could provide operational benefits through driverless trains as currently proposed for the North West rail network.
The 2001 Long Term Strategic Plan for Rail metro rail plan with stations at St James, Taylor Square, Moore Park, UNSW, Randwick, Kingsford and Maroubra could be developed as an underground cut and cover type tunnel with driven tunnels into the city. This scheme would also link up with Moore Park and the existing rail network at St James and potentially Wynyard. As such, it would impose minimal disruption to existing street based traffic in the long term, it would provide substantially quicker journery times and would be easier to construct. The stations, being underground would have minimal impact at street level.
The South East Metro is potentially a better solution than the ESR as it could increase the "reach" of rail transport into more areas of Sydney presently not presently served by rail, especially if it was developed as part of a wider network. The Long Term Strategic Plan for Rail was well thought out and is well worth adopting. It is acknowledged that it would be a more expensive than the ESR or the tram network, though would provide more benefits to Sydney than the huge amount of money proposed to be squandered on the Westconnex 1950's mentality motorway.
Both the ESR extension and the South East Metro can happily coexist with street level bus networks.
I urge you to reject the South East tram network entirely and invest in a better, more worthwhile public transport scheme as described in the Long Term Strategic Plan for Rail.
Regards,
Stephen Hodgkinson
Name Withheld
Comment
Name Withheld
Comment
Seaforth
,
New South Wales
Message
I am writing to support option 1b for the light rail project, together with option 1a. They have the straightest run, there for resulting in less noise and impacts.
willem sprokkreeff
Object
willem sprokkreeff
Object
unit 3204 tower apartments 68-7+
,
New South Wales
Message
As an owner/occupier of a unit in the Tower Apartments(,68-70)
Market Street I was invited to attend the presentation of the
George Street Light Rail Update. No present or future traffic data were presented, ,which made it difficult for all residents
present to judge the impact on the accessibility of our parking garage/. Having had this property for thirteen years, I am familiar with the enormous traffic flow on George Street which peaks during the early mornings and late afternoons, when arrow of approx.80 busses is proceeding to and from Circular Quay.
By making space for light rail and creating larger pedestrian ways chaos will be the result which may take years to correct.
Already now, when part of George Street is closed for the City of Sydney's many celebrations, I am often delayed for quite some time before able to park my car.
And all of this mainly to create a festive zone in a wider circle around Town Hall.
Stores like Myer and Dymocks, the many offices on the stretch between Market and King Street, they all need two lanes on both sides to avoid constant traffic jams.
I also have safety concerns with cars and trucks sharing and crossing pedestrian space.
Your own data on traffic movements must suggest that creating a boulevard is a dream, which willcost billions of dollars to correct.
All these reasons force me to object in the strongest possible terms to the present plan. I trust that you see the enormous problems it would create and I hope that you will give it your unbiased consideration.
Market Street I was invited to attend the presentation of the
George Street Light Rail Update. No present or future traffic data were presented, ,which made it difficult for all residents
present to judge the impact on the accessibility of our parking garage/. Having had this property for thirteen years, I am familiar with the enormous traffic flow on George Street which peaks during the early mornings and late afternoons, when arrow of approx.80 busses is proceeding to and from Circular Quay.
By making space for light rail and creating larger pedestrian ways chaos will be the result which may take years to correct.
Already now, when part of George Street is closed for the City of Sydney's many celebrations, I am often delayed for quite some time before able to park my car.
And all of this mainly to create a festive zone in a wider circle around Town Hall.
Stores like Myer and Dymocks, the many offices on the stretch between Market and King Street, they all need two lanes on both sides to avoid constant traffic jams.
I also have safety concerns with cars and trucks sharing and crossing pedestrian space.
Your own data on traffic movements must suggest that creating a boulevard is a dream, which willcost billions of dollars to correct.
All these reasons force me to object in the strongest possible terms to the present plan. I trust that you see the enormous problems it would create and I hope that you will give it your unbiased consideration.
Name Withheld
Object
Name Withheld
Object
Surry Hills
,
New South Wales
Message
I totally oppose this ridiculous CBD and South East Light Rail project (CSELR) as described in the Environmental Impact Statement (EIS) dated November 2013. I do not agree with the proposal as stated in the EIS document.
My concerns in relation to the CSELR project and the EIS, with particular interest with the Surry Hills to Moore Park West route, are summarised below:
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
My concerns in relation to the CSELR project and the EIS, with particular interest with the Surry Hills to Moore Park West route, are summarised below:
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Name Withheld
Object
Name Withheld
Object
Surry Hills
,
New South Wales
Message
I wish to voice my opposition for the proposed design of the CBD and South East Light Rail project (CSELR) as described in the Environmental Impact Statement (EIS) dated November 2013. I do not agree with the proposal as stated in the EIS document.
My concerns in relation to the CSELR project and the EIS, with particular interest with the Surry Hills to Moore Park West route, are summarised below:
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled will be completely removed. How are we to get deliveries
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
My concerns in relation to the CSELR project and the EIS, with particular interest with the Surry Hills to Moore Park West route, are summarised below:
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled will be completely removed. How are we to get deliveries
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Name Withheld
Object
Name Withheld
Object
Surry Hills
,
New South Wales
Message
I wish to voice my opposition for the proposed design of the CBD and South East Light Rail project (CSELR) as described in the Environmental Impact Statement (EIS) dated November 2013. I do not agree with the proposal as stated in the EIS document.
My concerns in relation to the CSELR project and the EIS, with particular interest with the Surry Hills to Moore Park West route, are summarised below:
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route will be removed - this is quite insane.
How are we to get deliveries
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
My concerns in relation to the CSELR project and the EIS, with particular interest with the Surry Hills to Moore Park West route, are summarised below:
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route will be removed - this is quite insane.
How are we to get deliveries
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Name Withheld
Object
Name Withheld
Object
Randwick
,
New South Wales
Message
I am totally opposed to the CSELR in its current form. There are so many better options available. Reinstate the heavy rail from Bondi Junction to Maroubra and Coogee and then use either light rail or buses to move people to the university etc. There is also the Foveaux Street sub surface route to consider. The current light rail project can not handle the number of passengers per hour as reported by TfNSW - so that is a completely false statement on their part. These fabrications by TfNSW imply that there are many other misleading statement in the EIS and really gives me no hope that anything they have advised is true.
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Sandy Tasker
Object
Sandy Tasker
Object
Randwick
,
New South Wales
Message
I am totally opposed to the CSELR in its current form. There are so many better options available. Reinstate the heavy rail from Bondi Junction to Maroubra and Coogee and then use either light rail or buses to move people to the university etc. There is also the Foveaux Street sub surface route to consider. The current light rail project can not handle the number of passengers per hour as reported by TfNSW - so that is a completely false statement on their part. These fabrications by TfNSW imply that there are many other misleading statement in the EIS and really gives me no hope that anything they have advised is true.
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Name Withheld
Object
Name Withheld
Object
Randwick
,
New South Wales
Message
I am totally opposed to the CSELR in its current form. There are so many better options available. Reinstate the heavy rail from Bondi Junction to Maroubra and Coogee and then use either light rail or buses to move people to the university etc. There is also the Foveaux Street sub surface route to consider. The current light rail project can not handle the number of passengers per hour as reported by TfNSW - so that is a completely false statement on their part. These fabrications by TfNSW imply that there are many other misleading statement in the EIS and really gives me no hope that anything they have advised is true.
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Name Withheld
Object
Name Withheld
Object
Surry Hills
,
New South Wales
Message
I am totally opposed to the CSELR in its current form. There are so many better options available. Reinstate the heavy rail from Bondi Junction to Maroubra and Coogee and then use either light rail or buses to move people to the university etc. There is also the Foveaux Street sub surface route to consider as well as a possible route via Campbell Street, Surry Hills with is alreaday a transport corridoor, is wide enough to have both trams, cars as well as parking available and wouldn't ruin the amenity of the area - whilst still giving people access to oxford Street.
The issues of concern to me particularly down and around Surry Hills and Devonshire Street:
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
The issues of concern to me particularly down and around Surry Hills and Devonshire Street:
Lack of business case for overall project and cost benefit of possible routes through Surry Hills
Devonshire street is not capable of being the spine of the SE Network / not sustainable
Vastly superior alternative routes has been identified - Foveaux and Devonshire sub-surface
No genuine community consultation has been engaged in.
Unacceptable noise levels, and times through a densely populated suburb
Size, speed and frequency of the light rail vehicles (LRV's)
Construction impact on small businesses and residents
Road closures during and post construction
Acquisition of 69 homes
Dislocation of Surry Hills
Loss of Amenity
Traffic congestion
Loss of large historic trees
Impact on parklands
Access to properties along the route - businesses, residents, elderly and disabled
Significant devalue on properties along the route with no compensation from the Government
Loss of car parking
If the project is to proceed then at a minimum the following should be adhered to:
The LRV's are no longer than 29m long if traveling through residential areas at the surface level. If the LRV"s are longer than 29m, then they are only to travel along specifically tailored routes (such as a sub-surface or tunnel) and or dedicated rights of way (not on residential streets).
Speed to be reduced to 20km from South Dowling Street to Elizabeth Street
Operational times through Surry Hills must limited to 05:30 to 23:30
No light rail movement between 23.30 and 5.30
Frequency limited to a minimum of 5 minutes gap of both LRV's
Noise and vibration levels delivered well within the EPA guidelines
Continuous rail to reduce noise at expansion joints to be used between South Dowling Street to Elizabeth Streets
Maximum noise reducing beds to be installed below the tracks
Base to be constructed in a way that limits vibration
Significant screening in residential areas must take place
All parklands should be replaced 1:1 with improvements on facilities
The Government has suggested they will replace trees 1:7 - this should be enforced with a at least 1:10 in the Surry Hills area
Light rail and electrical cables to be placed underground to reduce the visual clutter and enable trees to be planted to replace those being cut down
All substations must be below ground
Those residents financially impacted by the development of the light rail should be compensated for the loss of value; including acquisition and properties along the route affected.
Genuine consultation with business owners and operators about the construction of the light rail, with immediate support in the event of an incident.
Compensation to business for loss of income due to the construction and long-term impact of the light rail.
Compensation for all those residents living on Devonshire Street or on street level where the route passes in front of their residence
The frequency of LRV's should be limited to a minimum of 5 minutes to ensure a suitable gap to allow pedestrians, cyclists and vehicles to cross in safety
Resident/Commercial Only spaces in selected areas and temporary parking permits for the occasional visitors of residents and also for tradespeople. This allows those that have a genuine need to park in the area - residents and businesses - greater access to dedicated parking.
The safety issues need to be fully reviewed by independent consultants and the full reports made available
Frequency limited to a minimum of 5 minutes gap between both LRV's
Barbara Guthrie
Comment
Barbara Guthrie
Comment
Surry Hills
,
New South Wales
Message
I strongly support the CBD and South East Light Rail Project however I am disappointed that the route chosen through Surry Hills is via Devonshire Street. I am also disappointed that the route is, and apparently always has been, non-negotiable. Notwithstanding this, I wish to place on record my objection to the Devonshire route on the basis that it involves demolition of the Olivia Gardens apartment complex (69 homes) and removal of heritage listed trees on Council's Register of Significant Trees. The street is also significantly narrower than potential alternatives (Foveaux or Albion) and, accordingly, the construction will have a greater impact on the viability of local businesses.
I note that the EIS assesses the visual impacts on Devonshire Street as "moderate adverse" in both the construction and operations stages (Vol 5, p106 "Landscape and Visual Assessment" Devonshire St). Although trees will be removed on both sides of the street, they will not be replaced on the southern side and only where space permits on the northern side. The EIS notes that the Northcott brick buildings would be more visually prominent and that "New elements including overhead wires and catenary structures would add visual clutter within the streetscape."
In order to ameliorate these adverse visual impacts, I urge the State Government to take the opportunity created by the road works to work with the relevant power company to take down the overhead electricity wires and lay them underground. Not only is overhead wiring unsightly, it is susceptible to damage in high winds and storms. Undergrounding these wires would also mean that replanted trees on the northern side of Devonshire St would not need to be disfigured to avoid overhead wires.
Finally, I urge the Government to work closely with residents and the City Council on public domain improvements to the area in the course of the project.
I note that the EIS assesses the visual impacts on Devonshire Street as "moderate adverse" in both the construction and operations stages (Vol 5, p106 "Landscape and Visual Assessment" Devonshire St). Although trees will be removed on both sides of the street, they will not be replaced on the southern side and only where space permits on the northern side. The EIS notes that the Northcott brick buildings would be more visually prominent and that "New elements including overhead wires and catenary structures would add visual clutter within the streetscape."
In order to ameliorate these adverse visual impacts, I urge the State Government to take the opportunity created by the road works to work with the relevant power company to take down the overhead electricity wires and lay them underground. Not only is overhead wiring unsightly, it is susceptible to damage in high winds and storms. Undergrounding these wires would also mean that replanted trees on the northern side of Devonshire St would not need to be disfigured to avoid overhead wires.
Finally, I urge the Government to work closely with residents and the City Council on public domain improvements to the area in the course of the project.
David Sutton
Support
David Sutton
Support
Surry Hills
,
New South Wales
Message
I'm concerned about the effect of Surry Hills traffic changes on Adelaide Place.
Adelaide Place is a laneway running between Devonshire Street and Adelaide Street.
There are five houses that open straight on to the roadway - i.e. there is no pavement at all.
Cars pass directly by our front doors, often at speed.
If Waterloo Street is closed at Devonshire Street, it would funnel more traffic onto Steel St and Adelaide Place.
I propose closing Adelaide Place at Devonshire St and keeping Waterloo St open.
Adelaide Street could be re-opened at Riley Street to give better access to the area.
This would be a major improvement for Adelaide Place residents.
There is one garage on Adelaide Place, but access could be via Adelaide Street, or via Steel Lane to Steel Street.
Adelaide Place is a laneway running between Devonshire Street and Adelaide Street.
There are five houses that open straight on to the roadway - i.e. there is no pavement at all.
Cars pass directly by our front doors, often at speed.
If Waterloo Street is closed at Devonshire Street, it would funnel more traffic onto Steel St and Adelaide Place.
I propose closing Adelaide Place at Devonshire St and keeping Waterloo St open.
Adelaide Street could be re-opened at Riley Street to give better access to the area.
This would be a major improvement for Adelaide Place residents.
There is one garage on Adelaide Place, but access could be via Adelaide Street, or via Steel Lane to Steel Street.
June Odlum
Object
June Odlum
Object
Maroubra
,
New South Wales
Message
I strongly oppose the proposal to upgrade the Kensington/Kingsford area regarding the installation of a Light Rail system.
I am also deeply distressed concerning the removal of the precious Moreton Bay Fig trees.
Please take this into consideration.
I am also deeply distressed concerning the removal of the precious Moreton Bay Fig trees.
Please take this into consideration.
Peter Thorburn
Comment
Peter Thorburn
Comment
Randwick
,
New South Wales
Message
SUBMISSION - South East Light Rail, 16 December 2012
The following submission is in response to my understanding of the documents:
CBD and South East Light Rail Project, November 2013 CSELR/1113/191
CBD and South East Light Rail - Environmental Impact Statement Overview / CSELR/1113/192
The light rail to Randwick is designed to primarily service a distinct need i.e. for the vast numbers of non-residents who visit for one-off events to the ... Sports Ground, Fox studios, Randwick Racecourse, the Prince of Wales Hospital, and UNSW
(apart from UNSW which requires daily transport).
1) Coogee - the residents of Coogee, Kensington, and Kingsford will have to continually change modes of transport to get to where they need to go, as opposed to the current arrangement.
2) North Randwick - the people who live in the North Randwick will have their existing access to public transport reduced to just one bus, the 374.
Residents who live in North Randwick rely on the Coogee / Maroubra bus services to & from Randwick Shopping Centre, the city, & Central Station.
Bus services affected: 372 redirected down High St, 373 eliminated altogether, 376 & 377 terminating at the High Cross Park terminal.
The light rail route along Alison Rd from Anzac Pde has 3 stops,
1) the Racecourse, great for the odd racedays - no residents live there, + 300 metres away from Randwick TAFE
2) Wansey Rd, great for the very few residents who live in that area, and
3) the High Cross park terminal.
4) The Wansey Rd & Racecourse are the light rail stops closest for North Randwick residents up to Avoca St = a 2kms walk up hill = not good at night, walking alone, and not good if you have the misfortune to be elderly or wheelchair bound.
Summary
Randwick North / severely discontinued transport involving 1-2 km walk + hills.
374 the sole remaining bus for residents who live in North Randwick - i.e. the area bounded by Francis St / South, Avoca St / East and Stephen St / North
No transport options to the shopping centre along Belmore Rd from North Randwick - up to a 2km walk from Stephen St: Residents in this area will have no transport options to get to the Randwick shopping centre along Belmore Rd. The only bus service, which is proposed, is the 374 which turns left from Cook St into Alison Rd leaving the entire length of Belmore Rd (3 stops) without a bus service from North Randwick to the end of Belmore Rd at High Cross Park, and back.
The daily transport needs for residents of the entire area of North Randwick appear to have been totally disregarded in the current light rail plan - it is all about the Racecourse, the Sports ground, UNSW and PoW and big events at Centennial Park.
The light rail appears to give priority to the needs of non-residents at the expense of local residents.
Has light rail planner ever stood at the stops along Cook St / Cowper St's to see how many local residents catch the buses at these two locations which are 1-2 kms away from the nearest proposed light rail stops?
Peter Thorburn
3/96 Wentworth St, Randwick, 0408 65 35 25
[email protected]
CBD & South East Light Rail Project - Transport for North Randwick residents without buses.
The Randwick leg of the South East Light Rail will principally accommodate non-residents travelling to Fox Studios, Randwick Racecourse, Randwick TAFE, UNSW and the Prince of Wales Hospital, and then residents living in the Coogee basin and Maroubra.
Residents who live in the North Randwick precinct will be disadvantaged - the proposed Light rail route combined with the proposed changes to the existing bus routes will devalue the current transport service for people who live north of the High Cross Park Terminal midway to Darley Rd which borders Centennial Park. Residents in this area already have up to a 1.25 km walk to get to the bus stops in Cowper St, additionally many people drive to Wentworth St from further afield to park their cars for the day and catch the Cowper St buses.
The Light rail route is a further 1km walk away for many of these residents.
The bus routes (from Coogee and Maroubra) that currently service this area along Belmore Rd (Randwick Shopping Centre) to Cook & Cowper Streets are proposed to either,
a) stop at the Terminal (377), or to be
b) discontinued altogether (373 and 376), or to be
c) re-routed away from the north Randwick area (372).
d) The 374 is the only existing route (from midway between Cook/Cowper Sts St & Darley Rd) which will be retained to connect people living in this area of north Randwick to the light rail on Alison Rd. The current 374 timetable does not operated frequently, certainly not frequently enough to accommodate peak hour demand and late return home journeys at night, (the 339 route is to be retained but counter-productive for residents south of Stephen St, North Randwick)
e) Many of the residents who catch these buses at the Cook & Cowper St bus stops already have between a 500m & 1.25km walk to get to these three stops.
f) All of which leaves residents north of the High Cross park terminal reliant on just 374 or an additional 500 metre to 1.5 kilometre walk to access the light rail and to the shopping centre - including city workers during peak hour, and during the day - mother with prams, the elderly and schoolchildren.
Summary
g) The light rail route is proposed to operate along Alison Rd (no residents), Wansey Rd (narrow road / few residents) and High St (medical related businesses) - the entire Randwick light rail route is away from the significant population area of North Randwick, with exisiting bus services to be curtailed requiring and uphill walk from the light rail stop on Alison Rd if the sole 374 does not come!
h) It is ironic that the buses which service Coogee, Maroubra, Randwick come from Randwick Bus Depot which is situated in the exact area which will be disadvantaged most by the Randwick leg South East Light Rail.
This is a revised version of my submission, which I emailed on Saturday 14th December
Peter Thorburn
3/96 Wentworth St
Randwick NSW 2031
0408 65 35 25
16 December 2013
The following submission is in response to my understanding of the documents:
CBD and South East Light Rail Project, November 2013 CSELR/1113/191
CBD and South East Light Rail - Environmental Impact Statement Overview / CSELR/1113/192
The light rail to Randwick is designed to primarily service a distinct need i.e. for the vast numbers of non-residents who visit for one-off events to the ... Sports Ground, Fox studios, Randwick Racecourse, the Prince of Wales Hospital, and UNSW
(apart from UNSW which requires daily transport).
1) Coogee - the residents of Coogee, Kensington, and Kingsford will have to continually change modes of transport to get to where they need to go, as opposed to the current arrangement.
2) North Randwick - the people who live in the North Randwick will have their existing access to public transport reduced to just one bus, the 374.
Residents who live in North Randwick rely on the Coogee / Maroubra bus services to & from Randwick Shopping Centre, the city, & Central Station.
Bus services affected: 372 redirected down High St, 373 eliminated altogether, 376 & 377 terminating at the High Cross Park terminal.
The light rail route along Alison Rd from Anzac Pde has 3 stops,
1) the Racecourse, great for the odd racedays - no residents live there, + 300 metres away from Randwick TAFE
2) Wansey Rd, great for the very few residents who live in that area, and
3) the High Cross park terminal.
4) The Wansey Rd & Racecourse are the light rail stops closest for North Randwick residents up to Avoca St = a 2kms walk up hill = not good at night, walking alone, and not good if you have the misfortune to be elderly or wheelchair bound.
Summary
Randwick North / severely discontinued transport involving 1-2 km walk + hills.
374 the sole remaining bus for residents who live in North Randwick - i.e. the area bounded by Francis St / South, Avoca St / East and Stephen St / North
No transport options to the shopping centre along Belmore Rd from North Randwick - up to a 2km walk from Stephen St: Residents in this area will have no transport options to get to the Randwick shopping centre along Belmore Rd. The only bus service, which is proposed, is the 374 which turns left from Cook St into Alison Rd leaving the entire length of Belmore Rd (3 stops) without a bus service from North Randwick to the end of Belmore Rd at High Cross Park, and back.
The daily transport needs for residents of the entire area of North Randwick appear to have been totally disregarded in the current light rail plan - it is all about the Racecourse, the Sports ground, UNSW and PoW and big events at Centennial Park.
The light rail appears to give priority to the needs of non-residents at the expense of local residents.
Has light rail planner ever stood at the stops along Cook St / Cowper St's to see how many local residents catch the buses at these two locations which are 1-2 kms away from the nearest proposed light rail stops?
Peter Thorburn
3/96 Wentworth St, Randwick, 0408 65 35 25
[email protected]
CBD & South East Light Rail Project - Transport for North Randwick residents without buses.
The Randwick leg of the South East Light Rail will principally accommodate non-residents travelling to Fox Studios, Randwick Racecourse, Randwick TAFE, UNSW and the Prince of Wales Hospital, and then residents living in the Coogee basin and Maroubra.
Residents who live in the North Randwick precinct will be disadvantaged - the proposed Light rail route combined with the proposed changes to the existing bus routes will devalue the current transport service for people who live north of the High Cross Park Terminal midway to Darley Rd which borders Centennial Park. Residents in this area already have up to a 1.25 km walk to get to the bus stops in Cowper St, additionally many people drive to Wentworth St from further afield to park their cars for the day and catch the Cowper St buses.
The Light rail route is a further 1km walk away for many of these residents.
The bus routes (from Coogee and Maroubra) that currently service this area along Belmore Rd (Randwick Shopping Centre) to Cook & Cowper Streets are proposed to either,
a) stop at the Terminal (377), or to be
b) discontinued altogether (373 and 376), or to be
c) re-routed away from the north Randwick area (372).
d) The 374 is the only existing route (from midway between Cook/Cowper Sts St & Darley Rd) which will be retained to connect people living in this area of north Randwick to the light rail on Alison Rd. The current 374 timetable does not operated frequently, certainly not frequently enough to accommodate peak hour demand and late return home journeys at night, (the 339 route is to be retained but counter-productive for residents south of Stephen St, North Randwick)
e) Many of the residents who catch these buses at the Cook & Cowper St bus stops already have between a 500m & 1.25km walk to get to these three stops.
f) All of which leaves residents north of the High Cross park terminal reliant on just 374 or an additional 500 metre to 1.5 kilometre walk to access the light rail and to the shopping centre - including city workers during peak hour, and during the day - mother with prams, the elderly and schoolchildren.
Summary
g) The light rail route is proposed to operate along Alison Rd (no residents), Wansey Rd (narrow road / few residents) and High St (medical related businesses) - the entire Randwick light rail route is away from the significant population area of North Randwick, with exisiting bus services to be curtailed requiring and uphill walk from the light rail stop on Alison Rd if the sole 374 does not come!
h) It is ironic that the buses which service Coogee, Maroubra, Randwick come from Randwick Bus Depot which is situated in the exact area which will be disadvantaged most by the Randwick leg South East Light Rail.
This is a revised version of my submission, which I emailed on Saturday 14th December
Peter Thorburn
3/96 Wentworth St
Randwick NSW 2031
0408 65 35 25
16 December 2013
Park Hyatt
Comment
Park Hyatt
Comment
The Rocks
,
New South Wales
Message
Dear Sir/Madam
Whilst we have already participated in sharing an initial submission with the Australian Hotels Association (AHA), after reviewing the EIS exhibition documents we would like to share the following concerns for your consideration.
1. Traffic in the Rocks already becomes congested at times due to cruise ships, weekly road closures for markets, and supplier deliveries to local businesses with inadequate parking. In addition to this, development projects at Barangaroo are resulting in lane closures along Hickson Road and traffic has considerably increased. We are concerned about another project only adding to these challenges.
2. The proposed construction route along Hickson Road and past the Barangaroo construction site will lead to further congestion and increase danger for tourists in rocks area. Our understanding is that all heavy vehicles carrying waste materials will be using Hickson Road as a frequent thoroughfare for removal of this waste from the project site. Traffic diversions in place, specifically all traffic heading North along along George Street for the Four Seasons hotel and all Rocks area businesses will also congest Hickson Road and cause concern for the safety of tourists and other visitors to the area.
3. In earlier discussions it was suggested that George Street would not be closed off in its entirety for construction. The EIS documents indicate that it will be closed off.
4. The ongoing ability to turn right from Bridge Street into George Street is important but not clearly indicated in the document. This is of concern as there are a large volume of vehicles that use Bridge Street as the main route when travelling from the Airport to The Rocks.
In summary, we are concerned about the increasing traffic in Rocks area at the same time as reducing the ability of vehicles to arrive and depart the area. We respectfully request that our concerns be reviewed and considered at this stage of proceedings.
Whilst we have already participated in sharing an initial submission with the Australian Hotels Association (AHA), after reviewing the EIS exhibition documents we would like to share the following concerns for your consideration.
1. Traffic in the Rocks already becomes congested at times due to cruise ships, weekly road closures for markets, and supplier deliveries to local businesses with inadequate parking. In addition to this, development projects at Barangaroo are resulting in lane closures along Hickson Road and traffic has considerably increased. We are concerned about another project only adding to these challenges.
2. The proposed construction route along Hickson Road and past the Barangaroo construction site will lead to further congestion and increase danger for tourists in rocks area. Our understanding is that all heavy vehicles carrying waste materials will be using Hickson Road as a frequent thoroughfare for removal of this waste from the project site. Traffic diversions in place, specifically all traffic heading North along along George Street for the Four Seasons hotel and all Rocks area businesses will also congest Hickson Road and cause concern for the safety of tourists and other visitors to the area.
3. In earlier discussions it was suggested that George Street would not be closed off in its entirety for construction. The EIS documents indicate that it will be closed off.
4. The ongoing ability to turn right from Bridge Street into George Street is important but not clearly indicated in the document. This is of concern as there are a large volume of vehicles that use Bridge Street as the main route when travelling from the Airport to The Rocks.
In summary, we are concerned about the increasing traffic in Rocks area at the same time as reducing the ability of vehicles to arrive and depart the area. We respectfully request that our concerns be reviewed and considered at this stage of proceedings.
Pagination
Project Details
Application Number
SSI-6042
Assessment Type
State Significant Infrastructure
Development Type
Rail transport facilities
Local Government Areas
Inner West
Decision
Approved
Determination Date
Decider
Minister
Last Modified By
SSI-6042-MOD-6
Last Modified On
21/02/2017
Related Projects
SSI-6042-MOD-1
Determination
SSI Modifications
MOD 1 - Design Modifications
Sydney Cbd And South Eastern Suburbs New South Wales Australia
SSI-6042-MOD-2
Determination
SSI Modifications
Sydney CBD Light Rail (Mod 2)
Sydney Cbd And South Eastern Suburbs New South Wales Australia
SSI-6042-MOD-3
Determination
SSI Modifications
MOD 3 - Local Access Plans
Sydney Cbd And South Eastern Suburbs New South Wales Australia
SSI-6042-MOD-4
Determination
SSI Modifications
MOD 4 - Terminus & Stop Amendments
Sydney Cbd And South Eastern Suburbs New South Wales Australia
SSI-6042-MOD-5
Determination
SSI Modifications
Sydney CBD Light Rail (Mod 5)
Sydney Cbd And South Eastern Suburbs New South Wales Australia
SSI-6042-MOD-6
Determination
SSI Modifications
MOD 6 - Tree Pruning
Sydney Cbd And South Eastern Suburbs New South Wales Australia