Archive
Application (64)
Request for DGRS (1)
EA (26)
Submissions (7)
Agency Submissions (10)
Response to Submissions (62)
Recommendation (2)
Determination (17)
Approved Documents
There are no post approval documents available
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
Fire Safety Order issued to H71 – Sydney University, Abercrombie Student Housing Accommodation (MP 07_0158, Sydney LGA)
On 1 September 2020, the Department issued a Fire Safety Order to the owners of the building at H71 – Sydney University, Abercrombie Student Housing Accommodation at 393-415 Abercrombie Street, Darlington, to remove identified external wall panels on the building consisting of Aluminium Composite Panels (ACP). ACP is combustible and poses a fire safety risk. The owner is required to replace the ACP with a non – combustible product and provide an inspection report issued by an accredited certifier, certifying that the replacement panels and method of installation comply with the Building Code of Australia. The owner is required to develop and implement fire safety measures to reduce the fire safety risks associated with the cladding until the rectification work is complete.
Fire Safety Order issued to the University of Sydney - Building H69: Business School Building, 21-25 Codrington Street, Darlington (MP07_0158, City of Sydney LGA)
On 19 May 2021, the Department issued a Fire Safety Order to the owners of the University of Sydney - Building H69: Business School Building, 21-25 Codrington Street, Darlington, to remove identified external wall panels on the buildings consisting of Aluminium Composite Panels (ACP). ACP is combustible and poses a fire safety risk. The owner is required to replace the ACP with a non – combustible product and provide inspection reports issued by an accredited certifier, certifying that the replacement panels and method of installation comply with the Building Code of Australia. The owner is required to develop and implement fire safety measures to reduce the fire safety risks associated with the cladding until the rectification works are complete.
Fire Safety Order issued to Abercrombie Business School (Building H70) at Sydney University (MP07_0158) City of Sydney LGA
On 8 December 2022, the Department issued a Fire Safety Order to the owners of Abercrombie Business School (Building H70) at Sydney University, to remove identified external wall panels on the building consisting of Aluminium Composite Panels (ACP) and conduct associated rectification works. ACP is combustible and poses a fire safety risk. The owners are required to replace the ACP with a non-combustible product and provide an inspection report issued by an accredited certifier, certifying that the replacement panels and method of installation comply with the Building Code of Australia. The owners are required to develop and implement fire safety measures to reduce the fire safety risks associated with the cladding until the rectification work is complete.
Inspections
23/05/2022
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.
Submissions
Michelle Robinson
Object
Michelle Robinson
Message
Attachments
Name Withheld
Comment
Name Withheld
Message
Attachments
Pip Hopkins
Object
Pip Hopkins
Message
My daughter is in Yr 1 at the school and will be attending during the majority of the works that will take place.
As is highlighted in the submission by the school, the current actions to be taken by the University are unacceptable and need to be rectified and agreed upon prior to the building works starting.
The school is offering a number of solutions to potential problems which suit the needs of both parties and should be considered carefully!
Please do not hesitate to contact me if you have any questions about my objection.
Regards
Pip
Attachments
Name Withheld
Object
Name Withheld
Message
Attachments
Name Withheld
Object
Name Withheld
Message
Attachments
Adam Russell
Object
Adam Russell
Message
Please see my letter [attached] raising objection under the following headings:
Construction phase
1. Location of access point to the development site for all trucks and deliveries.
2. Air quality
3. Noise impacts
Development phase
1. Scale of the new Business Building
2. Use of the land for other purposes
3. Ongoing access point and traffic congestion on Abercrombie Street.
4. Closure of laneways and lack of through site link
Than you
Adam Russell
Attachments
Ian Medina
Object
Ian Medina
Message
Please read my File Attachment.