Skip to main content

State Significant Development

Response to Submissions

Wattle Creek Battery Energy Storage System

Upper Lachlan Shire

Current Status: Response to Submissions

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Development of a 350MW/1400MWh battery energy storage facility with associated infrastructure.

EPBC

This project is a controlled action under the Environment Protection and Biodiversity Conservation Act 1999 and will be assessed under the bilateral agreement between the NSW and Commonwealth Governments, or an accredited assessment process. For more information, refer to the Australian Government's website.

Attachments & Resources

Notice of Exhibition (1)

Request for SEARs (1)

SEARs (1)

EIS (22)

Response to Submissions (1)

Agency Advice (27)

Submissions

Filters
Showing 21 - 40 of 76 submissions
Name Withheld
Object
Gannawarra , Victoria
Message
There is no detailed plan for restoring habitats disrupted by the project. the surround land will be destroyed. the land will near be the same or ever returned top its orinagal state
Name Withheld
Object
WANTABADGERY , New South Wales
Message
Here are my Concerns:
- Fire and explosion risks plus re-ignition
- Pollution and contamination of surrounding land should a fire occur.
- Health risks due to toxic smoke should a fire occur.
- No benefit to the community. Economic or social. Benefits only big business.
- Environmental impact at the site, surrounding the site and in other countries that manufacture the equipment.
- BESS manufacture supports slave & child labour in developing nations.
- Visual impact to rural area. The introduction of large industrial scale BESS will change the character of the area.
- Carbon footprint- while BESS can help integrate renewable energy, its own production and operation contributes to carbon emissions.
- Lack of community consultation, the locals that I have spoken to had no idea this major project was being considered.
Name Withheld
Object
Redbank Plains , Queensland
Message
Filthy, Fire Hazardous BATTERY BOMBS are a toxic contamination disaster that will cause Groundwater Poisoning - with life threatening chemicals leaching into aquifers over time—irreversibly destroying water security.
Name Withheld
Object
Moulamein , New South Wales
Message
The proposal lacks measures to ensure public safety during construction and operation. It has no social licence. The surround residence are worn out by the constant barrage of industry
Name Withheld
Object
Moulamein , New South Wales
Message
There is no mention of independent safety audits to evaluate fire risk management strategies to stop contamination of adjoining farm land
Name Withheld
Object
Romsay , Victoria
Message
The EIS does not assess the potential risks to nearby communities.
Name Withheld
Object
Romsey , Victoria
Message
There are no detailed plans for managing potential chemical spills.
Name Withheld
Object
Springfield , Queensland
Message
This dodgy, fake green rip-off is Intergenerational Theft!
This destructive projects locks in environmental debt and poisoned land for future Australians to inherit without consent or compensation.
Name Withheld
Object
Moulamein , New South Wales
Message
The EIS does not specify how hazardous materials will be handled and disposed of.
Name Withheld
Object
LEETON , New South Wales
Message
TO WHOM IT MAY CONCERN

I object to the above as renewable energy is hazardous and will contaminate regional environments and may catch fire and cause toxic smoke and asthma and asthma-like health hazards in that event.

It is a myth that “renewable” energy is better. It is NOT better or CHEAPER than coal-fired base-load power by any stretch. This is also a national security issue when our services and assets are owned offshore.

This is not in Australia’s best interests and anyone thinking or pushing that has a loyalty to somewhere other than Australia and should be held accountable.
Name Withheld
Object
GRIFFITH , New South Wales
Message
What a Battery Blight Spark Renewables/TNB are planning - with monstrous industrial BESS BOMBS that destroy rural environments - pollute the land/water, kill biodiversity, deny us real reliable & affordable power & devalue neighbouring land.
Name Withheld
Object
Moulamein , New South Wales
Message
here is no provision for compensating 2nd neighbouring farmers for potential losses due to the project.
Name Withheld
Object
Moulamein , New South Wales
Message
The Environmental Impact Study does not include a comprehensive assessment of the project’s impact on local agriculture.
, including groundwater.
Name Withheld
Object
Hay , New South Wales
Message
Spark Renewables/TNB use False 'Green' Branding.
Despite being sold as sustainable, BESS systems are built from unethically mined, toxic minerals and poisonous chemicals, with massive, energy intense footprints.
Name Withheld
Object
BARHAM , New South Wales
Message
The development may disrupt local watering systems, affecting stock yields.
Name Withheld
Object
BARHAM , New South Wales
Message
There is no clear plan to protect local water resources from potential contamination.
Name Withheld
Object
Torque , Victoria
Message
Potential battery leaks pose a risk of soil contamination, affecting agricultural productivity.
Save Our Surroundings Hay
Object
Hay , New South Wales
Message
Airborne Toxin Fallout in the event of Fire is a Public Health & Safety Nightmare - with airborne particles that contaminate crops, livestock, and water supplies—crippling agricultural productivity.
Name Withheld
Object
Horsham , Victoria
Message
Threat to Endangered Species:
The development site is within the habitat of several endangered species, including the Swift Parrot and Eastern Bent-wing Bat.
Lack of Species Relocation Plans:
There are no clear plans for relocating endangered species if their habitats are affected.
Absence of Biodiversity Monitoring:
The EIS does not outline a plan for ongoing biodiversity monitoring during and after construction.
Inadequate Habitat Restoration Plans:
There is no detailed plan for restoring habitats disrupted by the project.
Failure to Address Cumulative Impacts:
The EIS does not adequately assess the cumulative environmental impacts of the project.
Name Withheld
Object
Springfield , New South Wales
Message
The lack of adequate Capability & Emergency Response Capacity is a Public Health & Safety Disaster!
Local Fire Services are woefully underprepared for chemical BESS infernos, placing first responders and entire towns in jeopardy.

Pagination

Project Details

Application Number
SSD-63345458
EPBC ID Number
2024/09970
Assessment Type
State Significant Development
Development Type
Electricity Generation - Other
Local Government Areas
Upper Lachlan Shire

Contact Planner

Name
Pragya Mathema