State Significant Infrastructure

Determination

WestConnex - M4 East Upgrade

Burwood

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

.

Modifications

Determination
Determination
Determination
Determination
Determination

Archive

Application (1)

SEARS (3)

EIS (111)

Submissions (79)

Response to Submissions (18)

Recommendation (6)

Determination (3)

Approved Documents

Other Documents (1)

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

10/01/2020

4/05/2020

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 381 - 400 of 666 submissions
Name Withheld
Object
Rozelle , New South Wales
Message
To the Director, Major Planning Assessments, Department of Planning

I write to express my strong objection to the WestConnex M4 East motorway proposal.

Global experience of major toll road construction has demonstrated conclusively that these projects are enormously expensive and counter-productive. WestConnex will increase air pollution and encourage more car use, quickly filling the increased road capacity. It is not a long-term solution to Sydney's congestion problem.

The fact that the State Government has already signed multi-billion dollar contracts for WestConnex before this EIS was even placed on public exhibition undermines community confidence that this is a genuine consultation process.

This EIS considers benefits for all stages of the project but doesn't address the negative impacts along the whole route.

No one wants a major highway on their doorstep and real estate prices in the areas affected will drop considerably. This project should be aborted and the funds put into a faster and more efficient train network. Public transport is the answer not more cars.

Thank you
Erica Deluchi
Object
Haberfield , New South Wales
Message
To the Director, Major Planning Assessments, Department of Planning
I write to express my strong objection to the WestConnex M4 East motorway proposal.
Global experience of major toll road construction has demonstrated conclusively that these projects are enormously expensive and counter-productive. WestConnex will increase air pollution and encourage more car use, quickly filling the increased road capacity. It is not a long-term solution to Sydney's congestion problem.
The fact that the State Government has already signed multi-billion dollar contracts for WestConnex before this EIS was even placed on public exhibition undermines community confidence that this is a genuine consultation process.
This EIS considers benefits for all stages of the project but doesn't address the negative impacts along the whole route.
I object to this proposal as it encourages more cars instead of public transport and bicycle paths, and fails to provide a long term solution to traffic and congestion.
Name Withheld
Object
Haberfield , New South Wales
Message
I wish to express my strong objection to the WestConnex M4 East motorway proposal. If built it will generate additional traffic, funnelling it into heavily congested middle-ring and inner city roads. The exit at Wattle Street is already a heavily congested site roadway for traffic and the proposal now adds more traffic. Why is our State Government agreeing to add additional vehicles to currently congested roads?

I also wish to register my objection to the government awarding tenders for the project before a full business case has been publicly released and before the EIS had been published and the public has exercised its right of participation.

The EIS process is supposed to allow for genuine public input and to result, potentially, in approval, non-approval, or approval with modifications, of the project. The present procedure makes a mockery of that right.

Government funding for this proposal - as part of the whole WestConnex proposal - will claim an extraordinary proportion of the state transport budget for years to come. This being the case, I am outraged that the EIS has failed to honestly and fully discuss its social, environmental, and economic impacts or to explain why it is preferable to other, alternative public- and active transport solutions.

In particular I draw attention to the EIS's failure to:

* Factor into the traffic modelling the very large increase in apartment construction - and therefore of population - that has been promoted by the WestConnex Delivery Authority and other agencies as a major rationalisation for the proposal.

* Honestly discuss public transport and freight rail alternatives.

* Publish a robust business case to justify expenditure of billions of dollars worth of taxpayers' funds.

* Properly describe the long term impacts of air pollution generated by the increased traffic volumes the project is designed to facilitate.

* Consider more sustainable public and active transport options that will produce a lower level of greenhouse gas emissions.

· Provide clear indications of how air quality will be monitored outside of the tunnel for local and regional areas. As a resident who will be affected by the air quality emanating from the tunnel outlets and stacks I do not believe we have received clear indications of air quality monitoring and risk management. Negligible impact on air quality is still an unacceptable outcome!


Debbie Ryan

Name Withheld
Object
Haberfield , New South Wales
Message
To the Director, Major Planning Assessments, Department of Planning
I write to express my strong objection to the WestConnex M4 East motorway proposal.
Global experience of major toll road construction has demonstrated conclusively that these projects are enormously expensive and counter-productive. WestConnex will increase air pollution and encourage more car use, quickly filling the increased road capacity. It is not a long-term solution to Sydney's congestion problem.
The fact that the State Government has already signed multi-billion dollar contracts for WestConnex before this EIS was even placed on public exhibition undermines community confidence that this is a genuine consultation process.
This EIS considers benefits for all stages of the project but doesn't address the negative impacts along the whole route.
I object to this proposal as it encourages more cars instead of public transport and bicycle paths, and fails to provide a long term solution to traffic and congestion.
Bill Johnstone
Object
Marrickville , New South Wales
Message
I write to express my strong objection to the WestConnex M4 East motorway proposal.

Global experience of major toll road construction has demonstrated conclusively that these projects are enormously expensive and counter-productive. WestConnex will increase air pollution and encourage more car use, quickly filling the increased road capacity. It is not a long-term solution to Sydney's congestion problem.

The fact that the State Government has already signed multi-billion dollar contracts for WestConnex before this EIS was even placed on public exhibition undermines community confidence that this is a genuine consultation process.

This EIS considers benefits for all stages of the project but doesn't address the negative impacts along the whole route.

I object to this proposal as it encourages more cars instead of public transport, and fails to provide a long term solution to traffic and congestion.

I also object as it will destroy the unique Newtown community that is centred especially around King Street south, by flooding King Street with more cars.
Name Withheld
Object
Enmore , New South Wales
Message
Building more roads of this type is an outdated approach to transport planning. You've only got to look at the M2 and M5 to see that these roads to not significantly improve commuter times over the long term. Instead, what is needed is investment in public transport.
Romy Caen
Object
Sydney , New South Wales
Message
To the Director, Major Planning Assessments, Department of Planning

I write to express my strong objection to the WestConnex M4 East motorway proposal.

Global experience of major toll road construction has demonstrated conclusively that these projects are enormously expensive and counter-productive.

WestConnex will increase air pollution and encourage more car use, quickly filling the increased road capacity. It is not a long-term solution to Sydney's congestion problem.

The fact that the State Government has already signed multi-billion dollar contracts for WestConnex before this EIS was even placed on public exhibition undermines community confidence that this is a genuine consultation process.

This EIS considers benefits for all stages of the project but doesn't address the negative impacts along the whole route.

I object to this proposal as it encourages more cars instead of public transport and bicycle paths, and fails to provide a long term solution to traffic and congestion

Regards,

Romy Caen
Ray Rauscher
Object
e gosford , New South Wales
Message
Dear Sir/Madam



We wish to make a submission on the above EIS.



We, and many residents of the Central Coast who travel to Sydney and through Sydney,
are concerned about the impact the $15.4bn toll road will have on Greater Sydney, in
particular the inner and middle suburbs.



As a number of cities around the world have experienced, building major toll roads
is both enormously expensive and counter productive. These cities have learned that
traffic will increase overall after expressways and motorways are built. It is not
a long term solution to Sydney's congestion problems.



Public transport is by far a better long term solution than expressways and
motorways. The money for Westconnex would be better spent building a world class
public transport system, as other cities (i.e. London, Paris, Copenhagen etc.) have
learned.





The Weatconnex as proposed (as outlined in the M4 EIS) will increase pollution and
traffic overall. This is unacceptable for a modern city. The City of Sydney and
other local councils are working to introduce sustainable urban planning (SUP)
practices in their transport building.



There are numerous references on the subject of SUP frameworks for transport and
urban planning (google Dr Ray Rauscher for recent books on the subject, including
'Sustainable Communities: A Framework for Planning

- Case Study of an Australian Outer Sydney Growth Area' (2014 Springer) and
'Sustainable Neighbourhoods in Australia; City of Sydney Urban Planning' (2015
Springer). Dr Rauscher (conjoint lecturer at Univ. of

Newcastle) can confer with the State further on the subject via
[email protected]<mailto:[email protected]> is you wish.



We would like to be kept up to date on progress made in this review of the EIS and
further State reports on the matter.



Yours sincerely



Ray Rauscher

Chair

Transport Action Central Coast

c/ CEN Offices

Univ. of Newcastle

Ourimbah
Name Withheld
Object
Newtown , New South Wales
Message
I object to WestConnex as:
1. it will deliver more cars and more traffic congestion in my local area and will make no improvement to the already straining public transport system
2. I am concerned about worsening air pollution and health risks particularly for children and the elderly
3. it will (and is already) creating adverse community impacts
4. it is destroying green space and having impacts on biodiversity in small pockets of remaining park and natural bushland
5. it will destroy items and areas of Sydney's heritage
6. it will have adverse impacts on our environment, we should be encouraging people not to drive their cars and move onto more environmentally friendly methods (ie public transport)
7. the total lack of transparency around the project.
Maarinke van der Meulen
Object
Enmore , New South Wales
Message
1. I object to westconnex because it will increase traffic without a clear path of where these extra cars will be directed; it is incredibly short sighted and simply 'shifts' the problem into other areas

2. I object to westconnex as it is a hugely expensive and shortsighted project, which delivers no value. $15b could be far better spent improving public transport options, providing long term benefit to the community and better for the natural environment.

3. Having attended several talks on this project by health professionals and academics, I am hugely concerned about the air pollution health risks of westconnex

4. I believe westconnex will have devastating community impacts, extra traffic will affect the community atmosphere of neighbourhoods, cripple the outside shopping and dining precincts which add so much life, employment and income to the neighbourhoods, as well as decrease road safety and increase frustration and anger already so common as a result of traffic.

5. I cannot believe the plans to cut into parkland, so necessary for the ecosystem and well used by the community. I am against westconnex destroying green space & biodiversity.

6. I am sincerely concerned that the development of westconnex will contaminate precious waterways

7. Forcibly buying homes - of families, of elderly residents- is disgusting practice, particularly with the lack of consultation or transparency so far regarding westconnex; I don't want westconnex destroying our heritage

8. westconnex is bad news for our climate, and we cannot keep pretending otherwise; public transport would be a far better option for the climate, and we could be so much smarter thinking ahead about this sort of investment (like Germany). It is literally the only future we have.

9. Finally, I utterly object to the lack of transparency around westconnex. That work has started with no community consultation, without a public business case, without am EIS! I cannot believe this is possible. let alone acceptable.
Cheryl Handford
Object
St Peters , New South Wales
Message
Director, Major Project Assessments
Department of Planning
GPO Box 39
Sydney NSW 2001

Submission: WestConnex M4 East EIS (SSI 6307)

I wish to express my strong objection to the WestConnex M4 East motorway proposal. If built it will generate additional traffic, funnelling it into heavily congested middle-ring and inner city roads, requiring the demolition of hundreds of homes and businesses to make way for road widenings on the surface road network to distribute the traffic from the motorway.
I also wish to register my objection to the government awarding tenders for the project before a full business case has been publicly released and before the EIS had been published and the public has exercised its right of participation.
The EIS process is supposed to allow for genuine public input and to result, potentially, in approval, non-approval, or approval with modifications, of the project. The present procedure makes a mockery of that right.
Government funding for this proposal - as part of the whole WestConnex proposal - will claim an extraordinary proportion of the state transport budget for years to come. This being the case, I am outraged that the EIS has failed to honestly and fully discuss its social, environmental, and economic impacts or to explain why it is preferable to other, alternative public- and active transport solutions.
In particular I draw attention to the EIS's failure to:
* Factor into the traffic modelling the very large increase in apartment construction - and therefore of population - that has been promoted by the WestConnex Delivery Authority and other agencies as a major rationalisation for the proposal.
* Honestly discuss public transport and freight rail alternatives.
* Publish a robust business case to justify expenditure of billions of dollars worth of taxpayers' funds.
* Properly describe the long term impacts of air pollution generated by the increased traffic volumes the project is designed to facilitate.
* Consider more sustainable public and active transport options that will produce a lower level of greenhouse gas emissions.
Decades-long global experience of urban motorway construction has demonstrated conclusively that big new urban roads are counterproductive. They generate a flood of new road traffic and rapidly reach capacity. That is why, globally, they have fallen out of favour and are no longer seen as a solution to congestion.

Cheryl Handford
15/10/2015
24 Grove Street
St Peters 2044
Name Withheld
Object
Annandale , New South Wales
Message
Submission: WestConnex M4 East EIS (SSI 6307)

I wish to express my strong objection to the WestConnex M4 East motorway proposal. If built it will generate additional traffic, funnelling it into heavily congested middle-ring and inner city roads, requiring the demolition of hundreds of homes and businesses to make way for road widenings on the surface road network to distribute the traffic from the motorway.

I also wish to register my objection to the government awarding tenders for the project before a full business case has been publicly released and before the EIS had been published and the public has exercised its right of participation.

The EIS process is supposed to allow for genuine public input and to result, potentially, in approval, non-approval, or approval with modifications, of the project. The present procedure makes a mockery of that right.

Government funding for this proposal - as part of the whole WestConnex proposal - will claim an extraordinary proportion of the state transport budget for years to come. This being the case, I am outraged that the EIS has failed to honestly and fully discuss its social, environmental, and economic impacts or to explain why it is preferable to other, alternative public- and active transport solutions.

In particular I draw attention to the EIS's failure to:

* Factor into the traffic modelling the very large increase in apartment construction - and therefore of population - that has been promoted by the WestConnex Delivery Authority and other agencies as a major rationalisation for the proposal.

* Honestly discuss public transport and freight rail alternatives.

* Publish a robust business case to justify expenditure of billions of dollars worth of taxpayers' funds.

* Properly describe the long term impacts of air pollution generated by the increased traffic volumes the project is designed to facilitate.

* Consider more sustainable public and active transport options that will produce a lower level of greenhouse gas emissions.
Consider the detrimental impact on local communities, and culture. Eg King Street, Newtown is a vibrant shopping strip, tourist destination. The M4, would destroy this culture, with King Street being like Parramatta Road.

Decades-long global experience of urban motorway construction has demonstrated conclusively that big new urban roads are counterproductive. They generate a flood of new road traffic and rapidly reach capacity. That is why, globally, they have fallen out of favour and are no longer seen as a solution to congestion.
marta bako
Object
leichhardt , New South Wales
Message
I object to the development of WestConnex. It will provide nothing but more cars on the road and more gridlock to the city. The development of precincts around Parramatta Rd, especially the Leichhardt area are is greedy development of the thoughtless. High rise buildings, no schools , no parks and no thinking of how you are going to deal with increased traffic in these areas. As I live on 32 Kegworths St, traffic is already at a gridlock every morning trying to head to the city via the City West Link. Build further public transport and get all these cars off the road. That would be a much better idea. Taking our home to clutter the area with high rise cheap residential homes is a very poor way of increasing housing for the population increase in our area.
Name Withheld
Object
Haberfield , New South Wales
Message
I am disappointed in the proposed plan's infringement on the suburb of Haberfield. While I understand the need for better transport options, it is unwise that an area with history and heritage be impacted:

1. Roads and highways can always be replaced and torn, but a heritage area and a suburb of character cannot be stripped and then recreated.

2. Governments are responsible to ensure their citizens lad productive, harmonious, and positive lives. It begins with each individual, expanding to their family, and then to their immediate surrounds. Close and satisfying community ties are engendered by the physical environment which surround people.


3. The imposing exhaust stack, expanded road area, tunnel exists and entrances are at the expense of peoples' homes and pedestrians' footpaths.

4. Public transport options should be examined, including underground rail, similar to metros or subways.

5. If the project's exhaust stack is to proceed, it would be preferable to have on the south-west corner of the Parramatta Rd/West link intersection, not at the proposed north-east corner which is closer to the public school and heritage suburb.

6. Any proposed tunneling to connect to M5 in the future should be under the current West Link, as opposed to under residential homes. Witness the problems that have occurred in Brisbane's tunnel under homes.

Bao-Dinh NGUYEN-PHUOC
Object
HABERFIELD , New South Wales
Message
I object to Martin St being made into a "rat run" for traffic from the West Connex.
Maarinke van der Meulen
Object
Enmore , New South Wales
Message
1. I object to westconnex because it will increase traffic without a clear path of where these extra cars will be directed; it is incredibly short sighted and simply 'shifts' the problem into other areas

2. I object to westconnex as it is a hugely expensive and shortsighted project, which delivers no value. $15b could be far better spent improving public transport options, providing long term benefit to the community and better for the natural environment.

3. Having attended several talks on this project by health professionals and academics, I am hugely concerned about the air pollution health risks of westconnex

4. I believe westconnex will have devastating community impacts, extra traffic will affect the community atmosphere of neighbourhoods, cripple the outside shopping and dining precincts which add so much life, employment and income to the neighbourhoods, as well as decrease road safety and increase frustration and anger already so common as a result of traffic.

5. I cannot believe the plans to cut into parkland, so necessary for the ecosystem and well used by the community. I am against westconnex destroying green space & biodiversity.

6. I am sincerely concerned that the development of westconnex will contaminate precious waterways

7. Forcibly buying homes - of families, of elderly residents- is disgusting practice, particularly with the lack of consultation or transparency so far regarding westconnex; I don't want westconnex destroying our heritage

8. westconnex is bad news for our climate, and we cannot keep pretending otherwise; public transport would be a far better option for the climate, and we could be so much smarter thinking ahead about this sort of investment (like Germany). It is literally the only future we have.

9. Finally, I utterly object to the lack of transparency around westconnex. That work has started with no community consultation, without a public business case, without am EIS! I cannot believe this is possible, let alone acceptable.
Name Withheld
Object
Annandale , New South Wales
Message
I wish to express my strong objection to the WestConnex M4 East motorway proposal. If built it will generate additional traffic, funnelling it into heavily congested middle-ring and inner city roads, requiring the demolition of hundreds of homes and businesses to make way for road widenings on the surface road network to distribute the traffic from the motorway.
I also wish to register my objection to the government awarding tenders for the project before a full business case has been publicly released and before the EIS had been published and the public has exercised its right of participation.
The EIS process is supposed to allow for genuine public input and to result, potentially, in approval, non-approval, or approval with modifications, of the project. The present procedure makes a mockery of that right.
Government funding for this proposal - as part of the whole WestConnex proposal - will claim an extraordinary proportion of the state transport budget for years to come. This being the case, I am outraged that the EIS has failed to honestly and fully discuss its social, environmental, and economic impacts or to explain why it is preferable to other, alternative public- and active transport solutions.
In particular I draw attention to the EIS's failure to:
* Factor into the traffic modelling the very large increase in apartment construction - and therefore of population - that has been promoted by the WestConnex Delivery Authority and other agencies as a major rationalisation for the proposal.
* Honestly discuss public transport and freight rail alternatives.
* Publish a robust business case to justify expenditure of billions of dollars worth of taxpayers' funds.
* Properly describe the long term impacts of air pollution generated by the increased traffic volumes the project is designed to facilitate.
* Consider more sustainable public and active transport options that will produce a lower level of greenhouse gas emissions.
Decades-long global experience of urban motorway construction has demonstrated conclusively that big new urban roads are counterproductive. They generate a flood of new road traffic and rapidly reach capacity. That is why, globally, they have fallen out of favour and are no longer seen as a solution to congestion.
Name Withheld
Object
Newtown , New South Wales
Message
Scared about the WestConnex and how it's going to destroy the Inner West? Quick! Get on the NSW Dept of Planning website and tell them you object to the dreadful 'tunnel to a traffic jam' nightmare proposal. DEADLINE IS TODAY (but it only takes a minute).

Here's some text from me in case you don't have time to write something yourself:

I strongly object to the WestConnex M4 East motorway proposal.

It is quite clear that this massive project will be hugely expensive and will not achieve its objectives. As overseas experience has amply demonstrated, projects like this only increase air pollution and actively encourage more cars on to the road, rapidly using up any increased road capacity created.

The WestConnex M4 East motorway is NOT a long-term solution to Sydney's congestion problem.

The fact that the State Government signed multi-billion dollar contracts for the development of this scheme PRIOR to the Environment Impact Statement even being put on public display completely undermines my confidence that this is a genuine consultation process.

The EIS enunciates BENEFITS for all stages of the project ... but does not address the NEGATIVE impacts along the whole route.

The principal objections to this proposal are:

1. The WestConnex M4 will, if built, encourage MORE CARS instead of PUBLIC TRANSPORT. It would fail to provide a long term solution to traffic and congestion. If you build more roads, you just get more cars. It is as simple as that.

2. The WestConnex M4 will, if built, create significant air pollution and damage the health and wellbeing of people who live nearby, especially children.

3. The WestConnex M4 will, if built, divide local communities and force hundreds of people out of their homes and neighbourhoods. It will do enormous damage to the fabric of Sydney's inner west community, including small businesses and families.

4. The WestConnex M4 will, if built, contribute to Australia's greenhouse gas emission and global warming by promoting an increase in fuel consumption and creating significant air pollution. This is not progress. It is regressive. Last century.

5. The WestConnex M4 will, if built, pollute local waterways and groundwater, and destroy precious green space and parklands that are so important to the local community.

6. This proposal fails to include any evaluation or consideration of alternative public transport options.

7. This proposal is not justified by any publicly-released business case.

In short, this is a community destroying, polluting, regressive and economically suspect proposal.
Name Withheld
Object
lewisham , New South Wales
Message
Public transport is the solution, not more cars.
The Westconnex project merely transfers the problem from one bottleneck site to another.
It will increase pollution and impact our planet and children's health.
The project is NOT justified by any publicly related business case.
Westconnex is not the answer.
Denis Beaubois
Object
Marrickville , New South Wales
Message
I am against the M4 East project. As a resident of the inner west I know that the area is already packed with traffic and I can only see West Connex compounding the issue. The money should be spent on public transport instead.
The air quality will also be jeopardised bringing more pollution into the area . We should be encouraging people not to drive because of the increased global warming and this is a retrograde step.
After some research I have yet to see a publicly released business case that justifies this project.
The project will also jeopardise local waterways and will also mean the loss of already scarce green space and parkland.

Please listen and do not impose this fiasco on the community.

Pagination

Project Details

Application Number
SSI-6307
Assessment Type
State Significant Infrastructure
Development Type
Road transport facilities
Local Government Areas
Burwood
Decision
Approved
Determination Date
Decider
Minister
Last Modified By
SSI-6307-MOD-5
Last Modified On
04/07/2018

Contact Planner

Name
Mary Garland