Youngs Creek, Cordeaux, Bridge Maintenance Works

Wollongong

Scope of works:
Works are required to protect the bridge abutments due to scouring from water. Works involve:
1. Remove built up soil from the bridge deck
2. Construct cross banks across the width of the bridge approaches to restrain water to the bridge deck
3. Regrade the existing table drains on both sides of the approaching roads and line with basalt/sandstone spalls
4. Temporary removal of existing guardrail (if necessary) and form spoon drains (mitre drains) in line with the existing drainage tracks to deviate water from table drains away from the bridge by using basalt/sandstone spalls and bio-degradable geo textile underlay
5. Fill void underneath headstock with no-fines concrete
6. Remove sandbags and place un-grouted boulders to all the sides of bridge abutment to stabilise the existing surface and reduce the water velocities
7. Reinstate existing guardrail posts using no-fine concrete
Note: Area of works approximately 62m long x 24m wide

Review of Environmental Factors (REF) (1)

The approved project is described in the REF, as modified by any associated decision statement (see supporting documents).
Review of Environmental Factors
Review of Environmental Factors-REF03843-Youngs Creek Scour Protection-FINAL
Date : Wed, 07/06/2023 - 15:56

Activity Details

Reference number
P5-2023-70
Proponent(s)
Wollongong City Council
Address
Cordeaux Road
Cordeaux
Legislation
TISEPP (State Environmental Planning Policy (Transport & Infrastructure) 2021)
Activity Type
Roads and road infrastructure facilities
Decision
Approved
Determination date