Skip to main content

DA Exhibitions

On Exhibition

Electricity Generating Works (Solar Installation and associated Battery Energy Storage System)

Glen Innes Severn

Application Documents (2)

Site Plans
Development Plans
Statement of environmental effects
24031_R_SEE_Solar Farm, Glen Innes_270324

Determination Documents (5)

Aboriginal Due Diligence Assessment
App. D - Cultural Heritage Due Diligence
Biodiversity - Test of Significance
App. C - Biodiversity Assessment (v3.0)
Construction Management Plan
App. E - Construction Environmental Management Plan
Traffic Impact Assessment
App. B - Traffic Impact Assessment
Visual Impact Assessment Report
App. A - VIA v2.0 Final

Submission

Make a submission

Submission Type (required)

To make an online submission, please fill in the following fields. Those marked with an asterisk "*" are mandatory.

Title
Please tick this box if you do not want your name published in the list of submitters on the NSW Planning Portal.
Do you have any Political Donations to report? (required)
Please attach a Political Donations Disclosure Statement
One file only.
256 MB limit.
Allowed types: txt, rtf, pdf, doc, docx, odt, ppt, pptx, odp, xls, xlsx, ods.

Submission

Please upload a submission document
One file only.
10 MB limit.
Allowed types: pdf.
I have read and agree to the department’s disclaimer and declaration.
This question is for testing whether or not you are a human visitor and to prevent automated spam submissions.

Project Details

Portal reference number
PAN-494889
Other identification number
DA 62/24-25
Property Address
Gwydir Highway Glen Innes 2370
Lot/DP number
60/-/DP1834,62/-/DP1834,59/-/DP1834,61/-/DP1834
Type of application
Development Application
Type of development

Electricity generating facility (solar and wind), Other Infrastructure, Erection of a new structure

Number of dwellings / units proposed
0
Exhibition start - end date
-

Consent Authority

Consent authority name
Glen Innes Severn