State Significant Development

Response to Submissions

Deniliquin Battery Energy Storage System

Edward River

Current Status: Response to Submissions

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 120MW/480MWh and ancillary infrastructure.

Attachments & Resources

Early Consultation (3)

Notice of Exhibition (1)

Request for SEARs (1)

SEARs (1)

EIS (16)

Response to Submissions (1)

Agency Advice (21)

Submissions

Filters
Showing 41 - 60 of 70 submissions
Name Withheld
Object
Lancefield , Victoria
Message
I Object to Avenis Energy’s Deniliquin BESS on the following grounds:-
• It is destructive to native flora and fauna;
• Construction will leave a legacy of land destruction that is unlikely to be rectified by the builder;
• It is an abomination on the natural landscape along with the whole diabolical NSW energy infrastructure roadmap.
• It is part of a system that costs billions, does not work reliably and attempts to solve a problem that does not exist, in other words useless and irresponsible use of public funds;
• All such infrastructures should be built at developer’s expense, NOT on public funds.
As we are told that wind and solar are the cheapest, well prove it, remove all subsidises - DO NOT build this system on public funds;
• The TOTAL cost has not been verified by independent experts;
• There is NO verified scientific basis for reduction of CO2 in the atmosphere so this project is a total waste of public money, along with all other such projects. 
There is in fact reliable verifiable scientific proof that CO2 is beneficial to plant life and by extension to human life on earth.
Name Withheld
Object
Hay , New South Wales
Message
I OBJECT TO THIS DESPICABLE BESS planned 5 klms from Deniliquin - designed to create toxic fires, deprive Australian people of power, cost us a motzer & never be cleaned up!
Name Withheld
Object
Redbank Plains , Queensland
Message
I Object to Deniliquin BESS because the fact is so called ‘renewables’ will not bring enough energy to supply ordinary Australians. They have not been proven to deliver continuous supply.

I am very unhappy that there is no opportunity for open debate on this destructive energy depriving venture that will change the life of all Australians for the worse.

The fact is energy costs will keep rising unaffordably for ordinary, already struggling householders & we’ll all be in the dark.
Name Withheld
Object
Springfield , Queensland
Message
I OBJECT to Avenis Energy’s horrible plan for destructive, toxic PFAS contaminating, explosive FIRE INFERNO BESS BOMBS - which will only work part-time, rip-off taxpayers & create a massive pile of toxic waste that is ruining Australia.
Name Withheld
Object
Harefield , New South Wales
Message
This terribly poisonous, FIRE BOMB BESS at Deniliquin is a despicable, diabolical plan designed to rip-off the Australian public with CONtrolling Energy Poverty.
Nobody in their right mind would rely on FIRE HAZARDOUS RUBBISH & the weather for their Electricity Grid & wreck our children’s future by making Australia weak - beholden to the CCP - our most hostile enemy!
Name Withheld
Object
Kepnock , Queensland
Message
Deniliquin BESS has no social licence as it is a horribly dangerous, extremely toxic & totally useless plan that is a complete waste of public money as it will never provide secure, reliable, affordable power.
Name Withheld
Object
GRIFFITH , New South Wales
Message
This planned Deniliquin BESS is part of a ridiculously costly, unethical, unreliable, energy depriving scam that would be a massive National Security Nightmare for Australia.

https://www.aspistrategist.org.au/editors-picks-for-2024-australias-climate-ambitions-have-a-modern-slavery-problem-examining-the-origins-of-our-big-batteries/
Name Withheld
Object
Mount Barker , South Australia
Message
Too much land and money is being wasted on inefficient production and storage of power.
Why not utilise the heat within the ground which is always constant , free and economical.
Name Withheld
Object
KOORINGAL , New South Wales
Message
The Hazardous Deniliquin Battery Energy Storage System will NEVER ensure reliable, affordable Australian power which is an essential service for the people of NSW.

Depending on intermittent, weather dependent Solar/Wind JUNK means it’s really flaky, a very silly idea & WON’T WORK most of the time.

This toxic contaminating plan DOES NOT belong on essential, irreplaceable Food growing land at all as irreversible environmental harm will inevitably occur & our children’s Energy Security & Food Security future will be ruined forever.
Save Our Surroundings Riverina
Object
Lake Albert , New South Wales
Message
Deniliquin BESS is a totally objectionable, Environmentally Destructive, life threatening Fire Risk that is useless, weather dependent & a toxic contamination disaster - against the best interests of Australia.
Name Withheld
Object
mount torrens , South Australia
Message
To Whom It May Concern,

I am writing to express my deep concern regarding the proposed Deniliquin battery farm and the environmental impact it will have on our region. While I recognize the importance of renewable energy initiatives, I strongly believe that this project, as it stands, will cause significant harm to the local environment and community.

Firstly, the construction and operation of large-scale battery storage facilities pose risks to the local ecosystem. The disruption of natural habitats and wildlife corridors cannot be overlooked. Deniliquin, being a rural area with rich biodiversity, is home to many species of flora and fauna that rely on these habitats for survival. The proposed development could lead to irreversible damage to these ecosystems, with the potential for increased fragmentation of wildlife habitats.

Additionally, I am concerned about the environmental footprint of the battery farm during its construction and maintenance. The large-scale industrial infrastructure required for such a project, including extensive excavation, heavy machinery, and pollution from transportation, could degrade the surrounding natural areas. This could also negatively affect soil and water quality, with potential runoff into local waterways, harming both the environment and the local agriculture that many rely on for their livelihood.

Moreover, the materials used to construct and operate battery farms—such as lithium, cobalt, and other metals—pose significant challenges in terms of sourcing, recycling, and disposal. The environmental costs of mining these materials, often in areas with lax environmental regulations, could undermine the very sustainability that renewable energy projects aim to promote. Without a clear plan for managing the lifecycle of these materials, the potential negative consequences of the project outweigh its benefits.

It is essential that we prioritize the preservation of our local environment alongside the adoption of renewable energy solutions. I strongly urge you to reconsider the Deniliquin battery farm's current plans and conduct a more thorough environmental impact assessment that takes into account the full scope of potential ecological damage, local biodiversity concerns, and long-term sustainability.

I encourage you to explore alternative renewable energy projects that do not compromise the health of our local ecosystems and the well-being of our community. The balance between green energy and environmental protection should not be sacrificed.

Thank you for your attention to this important matter. I look forward to hearing how you plan to address these concerns.

Sincerely,
Name Withheld
Object
LAKE ALBERT , New South Wales
Message
continued->
In spite of the devastating, weather dependent energy failures throughout NSW & the tragic ECOCIDAL RenewaBULL Experiment being unjustly inflicted on us, there is a plethora of Industrialised Solar/Wind & BESS destruction planned in Edward River Shire the SW & throughout NSW EVERYWHERE - AGAINST THE WILL OF THE COMMUNITY - WITH NO CONSENT & NO SOCIAL LICENCE!

With obvious, detrimental Public Health & Safety impacts to our essential, life-sustaining food resource land & vital water sources, it’s reprehensible that Approving Bodies persist in prioritising greedy, irresponsible carpetbaggers intent on sucking subsidies in exchange for a pathetic, weather dependent, intermittent Electricity System that’s ripping off Australian Electricity Consumers, causing the Government inflicted Cost of Living Crisis & plundering the countryside.

Entombment of this site with dangerous BESS ensures sterilisation of the soil, TOXIC CONTAMINATED WASTELAND & POISONING OF OUR VITAL WATER SOURCES FOREVER!

The unethical nature of tortured Child Slave Labour mined Cobalt for Lithium ion Batteries is well proven throughout NSW/Australia - which is NOT acceptable in Australia & against the New Modern Slavery Condition.

*NEW MODERN SLAVERY CONDITION-requiring proof prior to construction that NO Slave Labour supply chain components be used in construction. 
**New Condition Inserted C4A - Dealing With Modern Slavery.
Commonwealth Modern Slavery Act 2018

Considering the utmost importance of National Security, an ASIC search & an Audit is required to determine allegiance to Australia - as to whether this Applicant, their connections & that of others connected with Critical Energy Infrastructure are subject to the CCP’s National Intelligence Law?

‘Australia’s Climate Ambitions have a Modern Slavery Problem: Examining the Origins of our Big Batteries' | The Strategist
https://www.aspistrategist.org.au/editors-picks-for-2024-australias-climate-ambitions-have-a-modern-slavery-problem-examining-the-origins-of-our-big-batteries/

The people of Deniliquin/NSW/Australia require RELIABLE, AFFORDABLE, SECURE, 24/7 AUSTRALIAN POWER NOT this Sabotaging, Fake Green RenewaBULL Swindle!

References:
NATIONAL ELECTRICITY LAW OBJECTIVE
‘The objective of the National Electricity Law is to promote efficient investment in, & efficient operation and use of, electricity services for the long term interests of consumers with respect to:-
(a) price, quality, safety, reliability and security of supply of electricity; 
and
(b) the reliability, safety and security of the national electricity system; 
and 
(c) the achievement of targets set by a participating jurisdiction 
(i) for reducing Australia’s greenhouse gas emissions; or 
(ii)that are likely to contribute to reducing Australia’s greenhouse gas emissions.’

AEMO, AER, AEMC, EnergyCo, TransGrid, Energy Ministers and everyone in 'authority', place primacy on emissions target rather than the other requirements of the NEL. 
The emissions requirement was only added to the NEL in Sep 2023, and the NSW Emissions Reduction Act 2023 was only passed in Nov 23 (other states were similarly tardy to legislate any targets),  - so on what basis did any Gov act prior to that to impose all this on us?   Yet they all did, and still emphasise emissions over other objectives.   NEL is made in the SA Parliament, and in the 2nd reading, the Minister there also reiterated that all objectives are equal.

* The Four Principles of Ecologically Sustainable Development (ESD) are:
        • The Precautionary Principle: When there is a threat of serious environmental damage, action should be taken to prevent it, even if there is not full scientific certainty. 
        • Intergenerational Equity: The current generation should take care of the environment so that future generations can benefit from it. 
• Conservation of Biological Diversity: The diversity of plants and animals should be preserved. 
•  Improved Valuation, Pricing, and Incentive Mechanisms: The costs of pollution and waste should be paid by those who cause them.

*The recent Australian Drinking Water Guidelines Draft has highlighted PFOS as a Toxic contaminant - PFOS (Perfluorooctane Sulfonate or Perfluorooctane Sulfonic Acid) is coating Chinese Solar Panels, Electrical Wiring &  is in Solar Inverters, as well as filthy, hazardous Lithium Batteries & Bisphenol A shedding Wind Turbine Blades being Toxic PFAS Contaminants.
The PFAS reviewed as part of this update include perfluorooctanoic acid (PFOA); perfluorooctane sulfonic acid (PFOS); perfluorohexane sulfonic acid (PFHxS); perfluorobutane sulfonic acid (PFBS) and hexafluoropropylene oxide dimer acid and its ammonium salt (GenX chemicals).’
Further information on the NHMRC Review of PFAS in Australian drinking water (https://www.nhmrc.gov.au/health-advice/environmental-health/water/PFAS-review) is available on the NHMRC website.

*A range of PFAS is also subject to the Stockholm Convention for the protection of human health and the environment from persistent organic pollutants (POPs) (ie, PFOS, PFHxS, PFOA and potentially all long chain perfluoroalkyl carboxylic acids). 

*The World Health Organization now lists two PFAS as carcinogens or possible carcinogens: perfluorooctanoic acid (PFOA) as a Group 1 carcinogen and perfluorooctanesulfonic acid (PFOS) as a Group 2B carcinogen.

More Funding is Needed to Investigate Impact of PFAS on Human Health
**https://insightplus.mja.com.au/2024/46/more-funding-needed-to-investigate-impact-of-pfas-on-human-health/

* Notably, regarding the Toxic PFAS/PFOS Contaminating Renewable’ Industry -  the Commonwealth has effectively banned the import, use and manufacture of some of the more prominent types of PFAS (PFOS, PFOA and PFHxS) from 1 July 2025.  
(21 Feb 2024)

*Taking over farmland to build facilities to produce intermittent energy is a violation of Article 2, Section 1(b) of the Paris Agreement (2015).
Article 2 1(b) of the 2015 Paris Agreement states:
“This Agreement... aims to strengthen the global response to the threat of climate change, in the context of sustainable development and efforts to eradicate poverty, including by:
“(b) Increasing the ability to adapt to the adverse impacts of climate change and foster climate resilience and low greenhouse gas emissions development,  IN A MANNER THAT DOES NOT THREATEN FOOD PRODUCTION”; See: https://unfccc.int/files/essential_background/convention/application/pdf/english_paris_agreement.pdf .

*Livestock Production Assurance Program* 
The particular question is 2.8 of the "Food Safety on Your Property" section. 

*”Do livestock have access to leaking electrical transformers, capacitors, hydraulic equipment, solar panels, wind turbines, coal seam gas structures or coal mine wastes?"*

- Yes
- No
- I am now aware and making plans to restrict access

https://www.facebook.com/groups/2147446775628698/posts/2222816628091712/https://m.facebook.com/story.php?story_fbid=2222816628091712&id=2147446775628698
Name Withheld
Object
LAKE ALBERT , New South Wales
Message
The irresponsible Approval of SSD-72258210 - a filthy, 120MW/480MWhr Deniliquin Battery Energy Storage System at 21541 Riverina Highway, only 5 kms from Deniliquin would be an extremely Hazardous, Toxic Fire disaster for Edward River Shire!

The Applicant: ‘The Trustee for the AE BESS 4 Unit Trust’ (Avenis Energy) has been set up to NEVER be held accountable to clean up this Toxic PFAS contaminating, poisonous, incapable JUNK that’s part of the torturous & treacherous, subsidy sucking, Fake Green RenewaBULL Energy Poverty Swindle - designed to make Australia weak & fulfil
China's Energy Dream - Patricia Adams
“Carbon dioxide reduction only make sense for those it (China) wishes to harm & supplant." 
https://www.thegwpf.org/content/uploads/2021/12/Adams-Chinas-Energy-Dream.pdf

Deniliquin & the iconic, productive SW is NO place for Filthy, Fire🔥Hazardous BESS BOMBS or equally ECOCIDAL Industrialised Solar/Wind Monstrosities which are all A STORM OF NEGLECT AND ABUSE OF NATURE as these Fake Green Swindle Factories are the Antithesis of Healthy Food Production, Protecting Nature & Caring for Country! 

How the ex NFF CEO, now biased, unbalanced Australian Energy Infrastructure Commissioner (AEIC) can possibly spew such deceptively false RenewaBULL propaganda in Senate Estimates recently - in citing the South West - Hay in particular - as an example of *How we should Roll out ‘Renewables’* is disgusting & blatantly wrong!
Considering the undemocratic Hay Council Dictatorship ordered the community NOT to cause division by objecting & the developer biased ABC Riverina has refused to report the local objector facts & the Planning Minister continues his unjust refusal to include all their emailed objections to multiple plans when his office had acknowledged objections could be emailed - noting that the Planning Portal had repetitively failed to operate as it should ….. then the essential topic to highlight in Senate Estimates by the AEIC should be a ROYAL COMMISSION to expose the totally dodgy, unjust, underhanded stitch-up of the predatory RenewaBULL/Rotten TransGrid/Dodgy Regulator Nightmare being forced on rural NSW by heartless, land grabbing, vested interests - Against Our Will & Against Australia’s Best Interests.

Clearly The ISP is:-
•Not Fit For Purpose
•Has NO Independence
•Is Fatally Compromised
•An Unmitigated Disaster
•IS DEAD & BURIED!

"The idea that adding more & more renewable energy to the grid pushes power prices down has been comprehensively dismissed."
10/2/25 - 4:48 minutes - Aidan Morrison:
https://www.skynews.com.au/opinion/peta-credlin/governments-insistence-on-renewables-amid-soaring-power-prices-lashed/video/86bd230860f5514d1e587239c6b913ab

Fresh pressure on Chris Bowen + Matt Kean 🔌 - Ben Fordham Live (https://omny.fm/shows/ben-fordham-full-show/saturday-fresh-pressure-on-chris-bowen-matt-kean) - About 8 minutes

AEMO was not “trying to find the cheapest replacement for coal” since its Integrated Systems Plan (ISP) must be based on the current government’s policy.
“Matt Kean looks like he's lying to Parliament in that case, because the statements he's made… that the market operator's ISP is trying to find the cheapest replacement for coal; that is absolutely false,” he said.
“What's become absolutely, unequivocally clear is that the market operators Integrated System Plan is merely an instrument to achieve government policies.
It does not allow government policies to be compared to any other alternative.
So this idea that this baseline is somehow tested and compared to other alternatives - like more coal and gas - is utterly false.”
16/1/25 - 7 minutes - Aidan Morrison
https://www.skynews.com.au/business/energy/utterly-false-energy-expert-unleashes-on-climate-change-authority-head-matt-kean-and-market-regulator-beholden-to-government/news-story/a68147f24f47c99c1a868640f6ab7b64

DENILIQUIN BESS DEFIES:
*All Aspects of the National Electricity Law Objective
•All Principles of Ecologically Sustainable Development
•Australian Drinking Water Guidelines
•Stockholm Convention
•The WHO
•Paris Agreement 
•Livestock Production Assurance              Program
•New Modern Slavery Condition

The irreversibly toxic, environmentally harmful, life-threatening impacts from burning BESS & PFAS contamination of food growing land & vital water sources is a Public Health & Safety Disaster & Ecological/Biodiversity Catastrophe as RenewaBULLs ARE THE ASBESTOS OF THE FUTURE!

Industrialised BESS would put Deniliquin residents & the rural community at serious risk of life-threatening hazardous toxic fumes from BESS FIRES that burn for days with billowing toxic smoke that fills the air & residences, contaminating the soil & water throughout the locality.

**Forever Chemicals from Lithium ion Batteries Contaminate the Environment
https://www.theguardian.com/technology/article/2024/jul/14/forever-chemicals-lithium-ion-batteries-environment

** Disaster at Moss Landing: The Risk of Battery Storage - YouTube - 16/1/25
https://www.youtube.com/watch?v=xuTaZFQA18E

**https://wattsupwiththat.com/2025/02/20/massive-green-battery-plant-catches-on-fire-again-weeks-after-major-toxic-blaze/

**https://notalotofpeopleknowthat.wordpress.com/2025/02/21/battery-storage-fire-in-essex/

**https://localnewsmatters.org/2025/02/13/environmental-tests-reveal-elevated-levels-of-toxic-metals-since-moss-landing-battery-fire/

**https://www.sfgate.com/news/bayarea/article/environmental-tests-reveal-battery-metals-around-20163514.php

**https://www.cbsnews.com/sanfrancisco/news/elevated-levels-heavy-metals-elkhorn-slough-lithium-battery-facility

**https://www.fire.nsw.gov.au/page.php?id=9402
“There is a general lack of guidance and provisions in building codes, standards, and legislation in relation to safety to address the potential risks from these emerging technologies. Part of the problem is that we do not yet know enough about their probability of failure, their mechanisms of failure and potential consequences of failure.”

**Safety of Grid Scale Lithium-ion Battery Energy Storage Systems
“The scale of Li-ion BESS energy storage envisioned at “mega scale” energy farms is unprecedented and requires urgent review. The explosion potential and the lack of engineering standards to prevent thermal runaway may put control of “battery fires” beyond the knowledge, experience and capabilities of local Fire and Rescue Services.
BESS present special hazards to fire-fighters….”
https://www.researchgate.net/publication/352158070_Safety_of_Grid_Scale_Lithium-ion_Battery_Energy_Storage_Systems

**Grid Scale Batteries & Fire Risk
https://static1.squarespace.com/static/656f411497ae14084ad8d03a/t/66fd2383b56dbc6906390297/1727865736681/Fannon-Batteries.pdf

The Applicant has no intentions of ever cleaning up their BESS JUNK if it’s approved, as there is NO Decommissioning & Remediation Bond - which is essential, otherwise the gullible Host will be left with this mess & ultimately Edward River Council is responsible/liable for the inevitable serious/irreversible Contamination/Pollution caused by unregulated activities such as BESS & also Solar/Wind Electricity Generating Works under the POEO Act.

*Decommissioning is a Liability for Hosts*
The government essentially deems a Wind/Solar/BESS Factory lease agreement to be a private “handshake deal” between a naïve farmer and a future foreign consortium. see video clip below.
Lease agreements are written to be exploited by future buyers.
The Developer can sell the Wind/Solar/BESS Factory on without requiring permission from the host.
The host is not privy to any subsequent changes to the lease agreement.
The new buyers can add or delete clauses to suit their business needs.
The new company will amend the caveat on the land title without requiring permission from the host farmer.
The sale is done in secrecy – the deal between the foreign owners will be subject to confidentiality clauses, so they won’t disclose the new lease arrangements with the host farmer.
 
The farmer has handed over his land to who knows who?
If the new “who knows who” foreign owner of the Wind/Solar/BESS Factory – defaults on the decommissioning clause, the Government won’t help the host – see video clip https://fb.watch/xYYUUOGJRF/
 
It will be up to the farmer to decommission the infrastructure at a future exorbitant cost of eg. 1-2 million per turbine (and climbing.)
Insurance underwriters and Banks know this – The host farmers are now a financial risk to their businesses.
 
It is pie-in-the-sky politics to think a Wind/Solar/BESS Factory developer will cough up 200 million now for a bond or bank guarantee during the development phase.
The developer is in it for a quick buck, the lease is written to attract foreign buyers, and no foreign buyer is going to wear the decommissioning burden.
 
In any commercial lease agreement, if the lessee tenant shoots through, it’s on the landowner to clean up the mess.
This is the law.
The only option the landowner has is to sue the tenant for costs …. Good luck with that.
Here’s the Government confirming – they cannot protect farmers b/c the lease agreement is a private lease contract b/w two parties. 
https://fb.watch/xYYUUOGJRF/
CWO REZist Inc.
Object
COOLAH , New South Wales
Message
We object to this planned industrial BESS.

The BESS will be using lithium technology. Batteries use lead, lithium and cobalt, all of which are hazardous materials. This is of much concern to residents and the community as ordinary fire suppression measures cannot extinguish a Lithium chemical reaction fire. A fire that occurred in the 350MW/450MWh BESS during testing on 30 July 2021 in Geelong, Victoria shows how dangerous it can be for nearby residents. When one of the 13 tonne battery packs caught fire, it burned for three days and resulted in the evacuation of residents because of the toxic fumes generated.
A fire in a BESS would threaten immediate residents and those residing in the nearby township of Deniliquin, a mere 5km away.

What about end of life for the BESS? According to the CSIRO in 2021, only 10% of Australia's 3,300 tonnes of lithium-ion battery waste was recycled. Lithium battery waste is growing at 20% a year. Most of Australia's battery waste is shipped overseas, with the remaining waste going to landfill, leading to potential fires and environmental contamination. This is NOT ‘green”!

This project should be rejected.
Name Withheld
Object
COONABARABRAN , New South Wales
Message
BESS is dangerous and brings hazards to the project and community.
The noises from this BESS project will have negative impacts on the nearby livestock and wildlife. These impacts will be evident in not only everyday life for the animals, but also during breeding and birthing cycles. BESS carries significant fire risk.
Name Withheld
Object
Mendooran , New South Wales
Message
This battery storage system is of a major fire risk and will put significant strain on local and rural firefighting services. These local firefighting services are not equipped with the resources or man-power to manage emergency fires for when they do break out at this site. Why should the community risk their lives and step up to fight fires for infrastructure that they never wanted there in the first place?
Name Withheld
Object
Mendooran , New South Wales
Message
NO!! I object to this project. Explore a reliable form of energy such as nuclear. Explore a cleaner form of energy such as nuclear. Battery Energy Storage Systems are too dangerous for the environment. BESS presents significant fire risks.
BESS infrastructure will negatively impact the safety, visual amenity of the Deniliquin community and landscapes.
Name Withheld
Object
BALGOWLAH , New South Wales
Message
This infrastructure is too dangerous to the neighbouring properties and communities. BESS and solar panel factories are a significant fire risk. I object to this project.
Name Withheld
Object
MOLLYAN , New South Wales
Message
I object to the Deniliquin BESS project.
Why is our government forcing FIRE HAZARDOUS infrastructure and UNRELIABLE energy on our nation at the expense of rural Australia?!?
Save the land that supports and produces food and fibre for Australia. Put these elsewhere!
These projects are destroying rural Australia!!
Name Withheld
Object
MOLLYAN , New South Wales
Message
I object to this project. It is too close to the town of Deniliquin (5km south-east) and when a fire starts, it will be a disaster for the community.

Pagination

Project Details

Application Number
SSD-72258210
Assessment Type
State Significant Development
Development Type
Electricity Generation - Other
Local Government Areas
Edward River

Contact Planner

Name
Pragya Mathema