SSD Modifications
Determination
Mod 2 - Deferral of Salinity Reductions
Lithgow City
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare Mod Report
- Exhibition
- Collate Submissions
- Assessment
- Recommendation
- Determination
Springvale Coal (Mod 2)
Attachments & Resources
Application (2)
EIS (5)
Response to Submissions (2)
Recommendation (7)
Determination (3)
Submissions
Showing 81 - 100 of 344 submissions
Sumi Skellam
Object
Sumi Skellam
Object
Kogarah
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. I am not sure what kind of E&PA Act would allow ongoing pollution of water especially in a dry continent like Australia, but it would be ridiculous if it was one of ours, surely. Put a stop to this, and force them to clean up.
I object to any ongoing pollution of water that is planned to be caused by this mine.
This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts.
I object to Centennial Coal being granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
I object to any ongoing pollution of water that is planned to be caused by this mine.
This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts.
I object to Centennial Coal being granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Curtis Davis
Object
Curtis Davis
Object
Hartley
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
lesley kinney
Object
lesley kinney
Object
katoomba
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Jesse Herring
Object
Jesse Herring
Object
Petersham
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
courtney Toms
Object
courtney Toms
Object
katoomba
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Claire Harris
Object
Claire Harris
Object
Wollstonecraft
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
James Rayment
Object
James Rayment
Object
Mosman
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Kate Burns
Object
Kate Burns
Object
Avoca Beach
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Robert King
Object
Robert King
Object
kiama
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Stacey Brown
Object
Stacey Brown
Object
Elanora Heights
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Grant Rider
Object
Grant Rider
Object
Wentworth Falls
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Lisa Rothery
Object
Lisa Rothery
Object
Wentworth falls
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Erika Leesing
Object
Erika Leesing
Object
leura
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Toni Farlow
Object
Toni Farlow
Object
Blackheath
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Peter Morris
Object
Peter Morris
Object
Valentine
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Roy Jamieson
Object
Roy Jamieson
Object
NORTH GOSFORD
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
gregory olive
Object
gregory olive
Object
quakers hill
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Vicki Harriss
Object
Vicki Harriss
Object
Neerim
,
Victoria
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution with toxic metal salts, of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges into Sawyers Swamp Creek which immediately flows into the Coxs River; part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September 2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes, as each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges into Sawyers Swamp Creek which immediately flows into the Coxs River; part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September 2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes, as each proposal will not be properly understood unless these matters are assessed together.
Kelly Parsons
Object
Kelly Parsons
Object
Blackheath
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Dale Kentwell
Object
Dale Kentwell
Object
Avalon
,
New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.
Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.
Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.
I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Pagination
Project Details
Application Number
SSD-5594-MOD-2
Main Project
SSD-5594
Assessment Type
SSD Modifications
Development Type
Coal Mining
Local Government Areas
Lithgow City
Decision
Approved
Determination Date
Decider
IPC-N
Related Projects
SSD-5594-MOD-1
Determination
SSD Modifications
Mod 1 - Production Increase
Castlereagh Highway Blackmans Flat New South Wales Australia 2790
SSD-5594-MOD-2
Determination
SSD Modifications
Mod 2 - Deferral of Salinity Reductions
Castlereagh Highway Blackmans Flat New South Wales Australia 2790
SSD-5594-Mod-3
Determination
SSD Modifications
Springvale Coal MOD 3 - Aboriginal Heritage
Castlereagh Highway Blackmans Flat New South Wales Australia 2790
SSD-5594-Mod-4
Determination
SSD Modifications
MOD 4 - Rehabilitation Reforms
Castlereagh Highway Blackmans Flat New South Wales Australia 2790