Skip to main content
Back to Main Project

SSD Modifications

Determination

Mod 2 - Deferral of Salinity Reductions

Lithgow City

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare Mod Report
  3. Exhibition
  4. Collate Submissions
  5. Assessment
  6. Recommendation
  7. Determination

Springvale Coal (Mod 2)

Attachments & Resources

Application (2)

EIS (5)

Response to Submissions (2)

Recommendation (7)

Determination (3)

Submissions

Filters
Showing 121 - 140 of 344 submissions
Cindy Anderson
Object
Little Hartley , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Julie Foran
Object
Llanarth , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Yu Bolotin
Object
Lane Cove , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Lyn Mews
Object
Mt Colah , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Claudia Lacher
Object
Newtown , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Dan Edwards
Object
Riverstone , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Melanie Spruce
Object
Springfield , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Lawrence Curran
Object
Leura , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Arielle Barley
Object
Salamander bay , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Victor Zubakin
Object
Springwood , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Toni Curley
Object
New Lambton , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
kerry dacey
Object
Richmond , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Lynette Kitching
Object
Portland , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
James Packman
Object
Richmond , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Colin Walters
Object
Alexandria , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Shona Lindsay
Object
Annandale , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Sean Johnson
Object
Helensburgh , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
John Pettit
Object
Blackheath , New South Wales
Message
I strongly object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities. Further, the modification merely seeks to maximise Centennial Coal's profit, while avoiding the social and environmental costs that it creates.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Steven Robertson
Object
Coro Vale , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.
Wayde Szumyn
Object
Katoomba , New South Wales
Message
I object to the proposed modification of the Springvale Mine consent that would allow mine water treatment to be deferred for two more years. This consent modification proposal would cause on-going pollution of the Coxs River catchment, the Greater Blue Mountains World Heritage Area and Sydney's drinking water resources with toxic metal salts. Centennial Coal must not be granted legal relief arising from its foreshadowed default on the mine water discharge standards that it had previously agreed to with regulatory authorities.

Mine water discharges to Sawyers Swamp Creek that immediately flows into the Coxs River that is part of Sydney's drinking water catchment. Managing Director and CEO of Centennial Coal wrote to the Environment Protection Authority on May 29, 2015 to say that `Centennial acknowledges and agrees to the EPA's proposal for 700/900 EC limits as discussed in your letter'. The Planning Assessment Commission then placed these conditions in the September
2015 consent. I support the company's plans to remove mine water from Sydney's drinking water supplies by 30 June 2019 but Centennial Coal must be required to meet its consent obligations as agreed when the mine was approved.

Centennial Coal must install a temporary water treatment facility to meet the terms of its development consent so that mine water flowing into drinking water supplies receives at least a basic standard of treatment.

Further, this proposed consent modification is one of five modification proposals by Centennial Coal related to Springvale's mine water treatment.
The other proposals are: the mine water transfer, treatment and reuse at Mt Piper Power Plant; storage of treated mine water in Thompsons Creek Reservoir; the emplacement of waste from the water treatment plant; and effective treatment of highly polluting discharges from the emplacement area.

I request that these five proposals be considered together through the Department of Planning and Environment, and Planning Assessment processes.
Each proposal will not be properly understood unless these matters are assessed together.

Pagination

Project Details

Application Number
SSD-5594-MOD-2
Main Project
SSD-5594
Assessment Type
SSD Modifications
Development Type
Coal Mining
Local Government Areas
Lithgow City
Decision
Approved
Determination Date
Decider
IPC-N

Contact Planner

Name
Jack Turner