SSD Modifications
Determination
MOD 2 - Lot 4 Trunk Drainage and Warehouse Design
Penrith
Current Status: Determination
Interact with the stages for their names
- Prepare Mod Report
- Assessment
- Recommendation
- Determination
Reduction in the approved trunk drainage channel width and subsequent increase in the floor area of the Lot 4 warehouse.