State Significant Infrastructure
Sydney Metro West - Concept and Stage 1 (major civil construction between Westmead and The Bays)
Burwood
Current Status: Determination
Interact with the stages for their names
- SEARs
- Prepare EIS
- Exhibition
- Collate Submissions
- Response to Submissions
- Assessment
- Recommendation
- Determination
Sydney Metro West will service Westmead, Greater Parramatta, Sydney Olympic Park, The Bays Precinct and the Sydney CBD linking new communities to rail services with intermediate stations.
Consolidated Approval
Modifications
Archive
Application (1)
SEARs (1)
EIS (52)
Response to Submissions (6)
Amendments (1)
Determination (3)
Approved Documents
Management Plans and Strategies (161)
Agreements (1)
Community Consultative Committees and Panels (3)
Reports (12)
Independent Reviews and Audits (7)
Other Documents (26)
Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.
Complaints
Want to lodge a compliance complaint about this project?
Make a ComplaintEnforcements
Penalty Notices (3) and Official Cautions (2) issued to Acciona Ferrovial joint venture (SSI-10038) Canada Bay LGA
On 11 December 2023, NSW Planning issued three $15,000 Penalty Notices and two Official Cautions to Acciona Ferrovial joint venture (AFJV) for failing to comply with conditions of the Sydney Metro West approval. AFJV was issued one Penalty Notice for not having the required noise mitigation measures in place before commencing out of hours cavern excavation at the Burwood North station construction site. AFJV was issued a further two Penalty Notices and one Official Caution for not having the noise and traffic mitigation measures described in their management plans in place during bulk excavation at the Five Dock West station construction site. AFJV was issued a further Official Caution for not publishing the required traffic management plan on their website. AFJV has revised its construction program to minimise further construction activities at the Five Dock West site.
Penalty Notice issued to Gamuda Berhad (SSI-10038) City of Parramatta LGA
On 23 July 2024, NSW Planning issued a $15,000 Penalty Notice to Gamuda Berhad (Gamuda) for failing to ensure effective noise mitigation was in place at the Westmead station construction site for out of hours compressor noise. Gamuda commissioned a pair of compressors in June 2023 and identified compressor related noise exceedances in the night period in August 2023, however, did not initiate effective mitigation until November 2023. Gamuda has since had custom silencers fitted to the compressors to reduce noise impacts.
Inspections
16/06/2022
10/11/2022
1/03/2023
10/08/2022
31/08/2022
17/11/2022
16/02/2023
23/03/2023
26/10/2023
6/12/2023
23/01/2024
22/01/2024
16/01/2024
8/02/2024
25/02/2024
21/03/2024
27/03/2024
1/05/2024
3/06/2024
3/06/2024
19/06/2024
1/07/2024
4/07/2024
4/07/2024
24/10/2024
25/10/2024
28/10/2024
Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.
Submissions
Peter O’Connor
Comment
Peter O’Connor
Message
Name Withheld
Comment
Name Withheld
Message
During construction the EIS proposes that her street will be a one way 24 hour truck route with site entry opposite her house. This will have a serious impact on her amenity and wellbeing. Her main bedroom is at the front of the house and is not sound proof, with the house having no air conditioning. My mother is a light sleeper and relies on fresh air to ventilate the house. She lives independently but has mobility issues due to age, and will not be able to keep up with extra cleaning from the construction site opposite her home. A trip to the local shops is going to be extremely difficult given the truck traffic and her mobility. With the restriction on parking it will make it more difficult for family and friends to visit and provide her support structure.
Post construction the property will be affected with an easement noted on her title which will inhibit any possible opportunity for future development of the house so she will not have the benefit of land values recently achieved by surrounding properties in her area. I would like the opportunity to discuss these issues to confirm mitigation measures that could be put in place to reduce the impact to her every day way of life.
Adnan Obeid
Comment
Adnan Obeid
Message
Attachments
Frederick Hoekstra
Comment
Frederick Hoekstra
Message
The whole idea of Public Transport is to remove cars from the road as much as possible and provide cheap and frequent access to citizens throughout state. The benefits of reducing the number of cars on the road were evident during the recent lockdowns: pollution was significantly reduced and would have contributed to fewer health issues for many, especially those who live near major traffic corridors.
Those who live between Olympic Park and Parramatta will not have access to the Metro under current plans, forcing them onto the road either to drive to their destinations or to get to nearby public transport hubs. The closure of the Carlingford heavy rail line recently has already exacerbated this.
The region needs more access to the metro, not less. It needs more stops.
Eagle Partners
Support
Eagle Partners
Message
TRANSPORT CONSULTANTS
21 ST. GEORGES CRESCENT, DRUMMOYNE, NSW, 2047
METRO WEST - ENVIRONMENTAL IMPACT STATEMENT – MAY 2020.
To -
Planning and Assessment
Department of Planning, Industry and Environment
Locked Bag 5022
Parramatta NSW 2124
Submission from -
Eagle Partners
21 St Georges Cres.
Drummoyne, NSW, 2047.
APPLICATION NO. SSI-10038 – METRO WEST - WESTMEAD TO THE BAYS
WE SUPPORT THE PROJECT, with reservations, as detailed below.
OVERVIEW
This submission is based on information provided by Sydney Metro on a number of websites in late 2019 and early 2020. It refers to a proposed underground “Metro” railway between Sydney City and the suburb of Westmead. Submissions were invited from the public, with a closing date of 26 June 2020. This submission is in response to an Environmental Impact Statement (EIS) for the Concept Stage Application and Stage 1 Application (tunnels and station boxes) for that part of the railway between Westmead in the west and The Bays in the east. Therefore, this submission does not make reference to that section of the proposed railway between The Bays and Sydney City.
It is noted that submissions will be considered by the Department of Planning, Industry and Environment in its assessment of the project, and that the Department of Planning, Industry and Environment will provide Sydney Metro with a copy of all submissions received during the exhibition period. Sydney Metro will review all the submissions and prepare a Submissions Report to respond to issues raised. If changes are required as a result of the issues raised, a Preferred Infrastructure Report may also be prepared. Approval from the Minister for Planning and Public Spaces is required before Sydney Metro can proceed with the project.
INFORMATION BY “DRIP”
It is regrettable that the public has not been given sufficient information to respond to the whole of the Metro West project. It has become common in recent years to drip-feed information to the public for major projects, while major portions of the project are still in the concept or design stages. It inhibits transparency in democratic decision-making and is not in the public interest. In this case, the public is invited to respond to the “tunnels and station boxes” components of a project, without any details of the trains or stations which they will use. Nor can any public comment be regarded as “informed” when no information is available regarding the Bays to City section of the project.
LONGER TERM VIEW REQUIRED
There is a widely held view that the impetus for this West Metro was a rather late realisation that Sydney Trains' Western Line, between Sydney City and Parramatta, was already exceeding capacity at certain times of day, and that to relieve overcrowding some kind of parallel relief capacity was required. Hence Metro West. But the proposed design of Metro West implies that its main, or sole, purpose is as a relief for Sydney Trains' Western Line. The design should have a much wider vision, both geographically and with a view to the future. The design of West Metro should reflect the likelihood of it being extended, at one or both ends, and needing to serve the kind of urban development which is likely to have occurred around its stations over the next hundred years.
MINIMISING TRIP TIMES
Initial Sydney Metro promotional material, circa 2011, emphasised the need to minimise door-to-door travel times for Metro users. The need therefore to minimise walking distances at stations and at interchanges was acknowledged. That principle seems to have been abandoned in more recent times. It is most glaringly obvious by the failure to implement across-the-platform interchange for passengers at junction stations, a railway design principle which has been in practice throughout the world for over a hundred years. As Sydney's increasingly complex rail network expands, but becomes less integrated, (heavy rail, Metro and light rail) the need for passengers to interchange between lines will grow, exacerbating this failure.
As the approving authority, the Minister for Planning should ensure that a renewed emphasis be placed on minimising walk-up times to stations, and walking distances between trains at interchange stations.
The following comments relate to specific locations along the route of the proposed railway.
1 – WESTMEAD STATION
The EIS proposes that Westmead Metro Station be built underground, below Alexandra Avenue, and to the south of the existing Sydney Trains' surface station.
Chapter 7 of the EIS refers to “direct interchange” between Metro and Sydney Trains' station. It is not clear whether this will require passengers to“tag off” with Opal card and tag on again when transferring between the two railways. Tagging is inconvenient and time-consuming and should be eliminated wherever possible.
The site for the Metro station may have been chosen with a view to the future commercialisation of the existing residential properties to the south of Westmead Station. If this is NOT the reason, the Metro station should be moved to a site NORTH of Sydney Trains' station, where access to that station, the hospital precinct, the University of Western Sydney campus, T-way buses, and the light rail terminal, would enable much shorter, safer, and faster pedestrian links. An underground “all-weather” pedestrian passage could then be provided under Hawkesbury Road, to an entrance for the combined stations in the vicinity of the Hawkesbury / Darcy / Farmhouse block.
2 - OLYMPIC PARK STATION
Chapter 7 of the EIS recognises the need for this station to cater for normal day-to-day passenger flows as well as special event crowds, and the need to separate the two. It does not provide detail as to how this is to be done.
The station design should allow for each track to have a platform on both sides, as is provided at the adjacent Sydney Trains station. This feature may not be required initially, but may prove advantageous in the longer term as it reduces dwell times for trains by enabling simultaneous alighting and boarding. Allowance for a central island platform at the Mero station should therefore be made by splaying the running tunnels at both ends of the station. The tunnels, if they are located as shown in the EIS, will not allow for an island platform.
3 - NORTH STRATHFIELD STATION
Given the close proximity to the Sydney Trains station, and the likelihood of a high volume of interchanging passengers, short, all-weather, “tag-free”, underground pedestrian links should be provided, as suggested for Westmead station, above.
4 - FIVE DOCK STATION
Why are the operational tunnels shown widely spaced at Five Dock but not at other stations?
REPORTABLE POLITICAL DONATIONS
No reportable political donations have been made in the last two years.
Kevin Eadie
Partner
Eagle Partners
[email protected]
file – MetroWest1.doc
17 June 2020.
Mike Reynolds
Support
Mike Reynolds
Message
However, I refer to Chapter 7 of the EIS for this project, which demonstrates the location of this station is well removed from the main population centres of Balmain and Rozelle, near the southern tip of White Bay (refer Figure 7-9).
It is therefore critical that the station is made as accessible as possible for the existing residents of the area (and not just the new residents/workers of the proposed Bays Precinct), through pedestrian linkages and bus interchanges. This will maximise the usability of the Metro for existing residents and reduce reliance on other congested forms of transport from the area.
In this regard, I note that Figure 7-9 higlights a "potential connection" between the intersection of Mullens and Robert Streets, and the station entrance. See attached a diagram with the connection circled in red. I would urge the Department to implement this connection, which will facilitate a much more direct walking route from Mullens Street (which links with the rest of the Balmain peninsula) to the station entrance. It would presumably also provide for a better interchange between the buses which run down Mullens Street.
Many thanks,
Mike
Attachments
Name Withheld
Comment
Name Withheld
Message
However, I refer to Chapter 7 of the EIS for this project, which demonstrates the location of this station is well removed from the main population centres of Balmain and Rozelle.
It is therefore critical that the station is made as accessible as possible for the existing residents of the area (and not just the new residents/workers of the proposed Bays Precinct), through pedestrian linkages and bus interchanges. This will maximise the usability of the Metro for existing residents and reduce reliance on other congested forms of transport from the area.
In this regard, I note that Figure 7-9 higlights a "potential connection" between the intersection of Mullens and Robert Streets, and the station entrance. I would urge the Department to implement this connection, which will facilitate a much more direct walking route from Mullens Street (which links with the rest of the Balmain peninsula) to the station entrance. It would presumably also provide for a better interchange between the buses which run down Mullens Street.
Many thanks
Name Withheld
Support
Name Withheld
Message
However, a station at Rydalmere should be included. It will service the growing University of Western Sydney Campus. It will service the planned residential redevelopment for Rydalmere and Ermington. It will provide an interchange for travellers on the new Carlingford Light rail.. Those people will not have to go into Parramatta to transfer to the fast link to Olympic Park, Barangaroo and Sydney CBD.
A second point is that the present Metro carriages do not provide a designated bicycle area. Cyclists use empty Disable facilities or fit the best they can. The new Metro West should provide marked bicycle locations in the carriage. Cycling usage is on the increase. I am a bicycle rider and a resident member of Parramatta City cycling Advisory Committee.
These are my personal submissions.
Name Withheld
Support
Name Withheld
Message
Attachments
DP 270206 Kings Bay Estate
Comment
DP 270206 Kings Bay Estate
Message
Richard Ure
Object
Richard Ure
Message
It is obvious that the CBD has been deserted by its usual occupants for the last three months. There is the anecdotal experience that both employers and employees are finding that enforced isolation has changed work practices previously thought to be inviolable. Macquarie Bank for one is about to accept 20% of its workforce back to its CBD offices based largely on the fact the selected employees’ home situation is not suitable to working from home. The implication is that both parties are contend with the new arrangements.
In the light of this experience and the forthcoming completion of the NBN upgrades, all the transport usage projections should be revisited before vast amounts are spent to satisfy a demand that no longer exists in expected numbers.
Providing for public transport always costs money and involves generous subsidies. At a time when the pressures on the Budget are unprecedented, more thought should be given to the assumed need to duplicate an existing rail connection. The opportunity to move jobs closer to, or even at, home has now been presented, but no analysis has been undertaken as to how this opportunity could be exploited. This could happen by, for example, allowing for more commercial zoning in transport hubs distributed across the metropolitan area. As is so often the case in such debates, Paragraph 3.32 “Better use” is confined to “Better transport use” and fails to include “Better land use nearer to the other end, or at intermediate stages and possible nodes in the journey.”
If Paragraph 3.4 Travel time is an important consideration, why not ask questions like “Why is the journey necessary in the first place?” and “Is a connection to Macquarie Park also important?” Tens of thousands of people seem to have been managing quite well lately while not making any journeys to the CBD. It is not as if there is a shortage of other projects on the wish list: https://tinyurl.com/y8he7fr8.
And that list does not include extending Parramatta Light Rail Stage 1 to Epping Junction (thence to Macquarie Park) and to connect it with the other parts of the heavy rail and metro network.
Name Withheld
Comment
Name Withheld
Message
We have Western Sydney University with campuses at Rydalmere, Parramatta and Westmead - a transport link between these would make perfect sense and be a wonderful worthwhile visionary project. Please see the big picture rather than the short term money savings.
I understand the Parramatta River may cause problems - so if Rydalmere is really not an option - a stop at Rosehill could also work or Silverwater or Camelia.
Silverwater has poor public transport options and there are a lot of job opportunities here - but only if you have your own transport. A stop at Silverwater would be very worthwhile too.
The population of this area is set to double - so please look to the future - and add another stop between Parramatta and Olympic Park.
Name Withheld
Object
Name Withheld
Message
Name Withheld
Object
Name Withheld
Message
William Holliday
Object
William Holliday
Message
David Binggeli
Support
David Binggeli
Message
I am concerned for the noise levels during the demolition & excavation works especially before the acoustic barrier is constructed. I was informed that this could be for a period of 3-6 months.
We are a young family, with a baby and are planning to have another baby in 2021.
I am wondering what options are available to me with regards to being relocated during this phase at the expense of the government ?
Callan Street Rozelle residents
Object
Callan Street Rozelle residents
Message
Attachments
WalkSydney
Comment
WalkSydney
Message
To that end, we believe the Sydney Metro West project should have additional stations in Pyrmont, Leichhardt, Silverwater, and Camellia, and of course extend into the Sydney CBD. This will bring the stations closer to users and increase the value (and land value uplift) of the system. While this will slightly increase the longer distance travel time, we don't believe most users are making end-to-end trips compared to the number potentially traveling between points along the way.
We want to ensure that all stations are well integrated to the local footpath and bikepath networks, are accessible to those with physical disability, and ensure easy transfers to bus and light rail transit.
We want to ensure stations have entrances at each end of the platform to maximise walk access and minimise excess walk time within and around the station.
Nigel Withers
Comment
Nigel Withers
Message
I request that when the project goes to tender for trucks to remove spoil etc and to deliver construction equipment to work sites, that the tender specifies the use of trucks that meet the 4 star direct vision standard for safety. Here's a link to a document explaining the standard:
https://www.clocs.org.uk/wp-content/uploads/2018/03/Direct-Vision-Standards.pdf
Here's a link to a video explaining why this standard needs to be applied to construction vehicles being used in the inner west, where streets are narrow and crowded with pedestrians and cyclists.
https://youtu.be/ubjtsHlEyxQ
At the very least, if you don't want to apply the 4 star standard, at least decide what rating will be the minimum permissible for this project and exclude all trucks that fail to meet that minimum direct vision stanard. We don't want old trucks with hopeless driver visibility navigating busy areas such as Five Dock.
The 4 star standard really should be the basic standard across the board for all major projects - this shouldn't be a one off for this project. This ties in with the NSW government's Vision Zero strategy for reducing road deaths.