Plans
Pyrmont Peninsula sub-precinct master plans
City Of Sydney
The Pyrmont Peninsula sub-precinct master plans were exhibited from 26 November 2021 to 4 February 2022.
The master plans build on the priorities set out in the Pyrmont Peninsula Place Strategy and provide high-level guidance on how the seven sub-precincts could develop over the next 20 years to create unique and liveable places.
We also exhibited proposed planning controls for two key sites, The Star and University of Technology, Sydney, and the two Sydney Metro West station sites. The planning controls provide height and floor space ratio controls and will guide future levels of density.
Thank you for your feedback, which will help us finalise the master plans and shape the future of Pyrmont.
Documents
Exhibition documents
Exhibition documents
- Pyrmont Exhibition Discussion Paper (Explanation of Intended Effect)
- Pyrmont Design Guidelines
- Pyrmont Urban Design Report
- Sub-precinct master plans for the Pyrmont Peninsula Exhibition Guide
Technical documents
- Pyrmont Air Quality Assessment
- Pyrmont Biodiversity Report
- Pyrmont Contamination & Acid Sulfate Soils Study Part 1
- Pyrmont Contamination & Acid Sulfate Soils Study Part 2
- Pyrmont Contamination & Acid Sulfate Soils Study Part 3
- Pyrmont Aviation Assessment Part 1
- Pyrmont Aviation Assessment Part 2
- Pyrmont Aviation Assessment Part 3
- Pyrmont Aviation Assessment Part 4
- Pyrmont Non Indigenous Heritage Report
- Pyrmont Affordable Housing Study
- Pyrmont Infrastructure Delivery Plan
- Pyrmont Wind Assessment
- Pyrmont Noise Study
- Pyrmont Transport Assessment
The following documents have not been endorsed by the department and are provided for transparency purposes.
Star and UTS key site master planning documents
Star and UTS key site master planning documents
The Star Key Site Master Plan
- The Star Key Site Master Plan Cover Report
- The Star Key Site Master Plan Appendix (A) Master Plan Part 1
- The Star Key Site Master Plan Appendix (A) Master Plan Part 2
- The Star Key Site Master Plan Appendix (A) Master Plan Part 3
- The Star Key Site Master Plan Appendix (A) Master Plan Part 4
- The Star Key Site Master Plan Appendix (B)Urban Design Report
- The Star Key Site Master Plan Appendix (C) Public Domain Report
- The Star Key Site Master Plan Appendix (D) Draft Design Guide
- The Star Key Site Master Plan Appendix (E) Design Excellence Strategy
- The Star Key Site Master Plan Appendix (F) Sustainability Strategy
- The Star Key Site Master Plan Appendix (G) Transport Impact Assessment
- The Star Key Site Master Plan Appendix (H) Wind Report
- The Star Key Site Master Plan Appendix (I) Visual Impact Assessment
- The Star Key Site Master Plan Appendix (J) Social and Economics Benefits Statement
- The Star Key Site Master Plan Appendix (K) Electrical & Hydraulic Services Report
- The Star Key Site Master Plan Appendix (L) Flood Report
- The Star Key Site Master Plan Appendix (M) Acoustic Report
The Star SDRP advice
- The Star Key Site Master Plan State Design Review Panel Session 1 Advice
- The Star Key Site Master Plan State Design Review Panel Session 2 Advice
UTS Key Site Masterplan
- UTS Key Site Master Plan Part 1
- UTS Key Site Master Plan Part 2
- UTS Key Site Master Plan Part 3
- UTS Key Site Master Plan Appendix (A) Landscape Master Plan
- UTS Key Site Master Plan Appendix (B) Reference Design Scheme
- UTS Key Site Master Plan Appendix (C) Design Excellence Strategy
- UTS Key Site Master Plan Appendix (D) Design Guide
- UTS Key Site Master Plan Appendix (E) CPTED Report
- UTS Key Site Master Plan Appendix (F) Visual Impact Assessment
- UTS Key Site Master Plan Appendix (G) Infrastructure and Public Benefits Framework
- UTS Key Site Master Plan Appendix (H) Sustainability Report
- UTS Key Site Master Plan Appendix (I) Wind Assessment Cover Letter
- UTS Key Site Master Plan Appendix (I) Wind Assessment
- UTS Key Site Master Plan Appendix (J) and (K) Engineering Report
- UTS Key Site Master Plan Appendix (L) Traffic Impact Assessment
- UTS Key Site Master Plan Appendix (M) Heritage Impact Statement
- UTS Key Site Master Plan Appendix (N) Conservation Management Plan
- UTS Key Site Master Plan Appendix (O) Archaeology Report
- UTS Key Site Master Plan Appendix (O) Archaeology Report HAA
- UTS Key Site Master Plan Appendix (P) Social and Economic Benefit Statement
- UTS Key Site Master Plan Appendix (Q) Geotechnical Report
- UTS Key Site Master Plan Appendix (R) Contamination Report
- UTS Key Site Master Plan Appendix (S) Aeronautical Report
- UTS Key Site Master Plan Appendix (T) Accessibility Assessment
- UTS Key Site Master Plan Appendix (U) Consultation Reports
- UTS Key Site Master Plan Appendix (V) Public Art Strategy
UTS SDRP advice
Submissions
View the Submissions
View the Submissions
Project Details
NSW Planning Portal