State Significant Infrastructure

Determination

NorthConnex

Hornsby Shire

Current Status: Determination

Interact with the stages for their names

  1. SEARs
  2. Prepare EIS
  3. Exhibition
  4. Collate Submissions
  5. Response to Submissions
  6. Assessment
  7. Recommendation
  8. Determination

0

Consolidated Approval

Consolidated Approval

Modifications

Determination

Archive

DGRs (3)

EIS (114)

Response to Submissions (22)

Assessment (4)

Determination (6)

Approved Documents

Community Consultative Committees and Panels (1)

Reports (2)

Independent Reviews and Audits (1)

Other Documents (2)

Note: Only documents approved by the Department after November 2019 will be published above. Any documents approved before this time can be viewed on the Applicant's website.

Complaints

Want to lodge a compliance complaint about this project?

Make a Complaint

Enforcements

There are no enforcements for this project.

Inspections

10/08/2023

29/10/2023

Note: Only enforcements and inspections undertaken by the Department from March 2020 will be shown above.

Submissions

Filters
Showing 601 - 620 of 1371 submissions
Angus Sturrock
Comment
Wahroonga , New South Wales
Message
Please refer to comments in attached letter
Attachments
Larry GUO
Object
wahroonga , New South Wales
Message
26 August 2014

Director - Infrastructure Projects
Department of Planning and Environment
Number: SSI 13_6136
Major Projects Assessment
GPO Box 39
SYDNEY NSW 2001

Via online form: http://majorprojects.planning.nsw.gov.au/index.pl?action=view_job&job_id=6136

NorthConnex Application Number: SSI 13_6136

Please find below my/our submission in response to the exhibition of the EIS for NorthConnex.

Firstly I/we would like to state we object to the project as described in the EIS.

I/We have a high level of concern regarding the following issues and request that these be considered by NorthConnex and the Department of Planning. In regards to the NorthConnex tunnel, I am concerned about:

1. Placement of the northern ventilation stack in the centre of a densely populated residential area in Wahroonga, where 9,300 school children will be exposed, as well as multiple aged care facilities, hospitals, businesses and homes.

2. The placement of the northern ventilation stack in a valley in Wahroonga where there are often low wind speeds, which will result in poor dispersion and exposure to community to high levels of tunnel emission.

3. I am highly concerned about the multiple large scale research studies that suggest the impacts of air pollutants on health are serious. These include increased death from heart disease, increased risks of lung cancer, stroke, poor lung growth in children, increased asthma, and recent research suggesting low birth weight for pregnant women, increased autism, and congenital heart defects. These studies confirm air pollutants have prothrombotic and inflammatory effects on humans which cause the above health problems.

4. I am concerned about the project including future provisions for portal emissions in densely populated areas, which will result in emissions remaining at ground level, and hence exposing the local population to pollutants. I am also concerned that NorthConnex's claim that there will no portal emissions from current proposal cannot be verified.

5. I am concerned about the large amount of diesel emissions which will be emitted from the NorthConnex tunnel, as it is being designed for heavy freight to bypass Pennant Hills Rd. Diesel emissions have been classified as carcinogenic by the World Health Organisation, and also contain a larger number of fine particles which penetrate deep into lung tissue and remain there causing inflammation.

6. I am concerned about the air quality within the tunnel which is shown in the EIS to have exceedences above standards for pollutants such as NO2, and haze from particulate matter at the ends of the tunnel.

7. I am concerned about the multiple flaws in the air quality modelling of the northern stack in the EIS. These include:
a) extrapolation of meteorological data from other weather stations which do not reflect the local meteorology, local topography, and the valley location.
b) The use of a coarse topographical model
c) The failure to consider polluted intake air from the Pennant Hills/M2 interchange as part of the project contribution to air quality at Wahroonga
d) the background air quality being based on air quality at Lindfield and Prospect and the lack of any actual data on PM2.5

8. I/we am concerned that a full and transparent options assessment process was not undertaken to assess alternative designs for the project. Unlike other tunnel projects in Sydney there are alternatives for locating the stack and portals in non-residential areas.

9. I am concerned that the justification for not providing filtration for the stacks is cursory and unconvincing.

To address my/our concerns I request that the following actions are undertaken:

1. The air quality and human health impact assessment need to be revised to address the issues raised above.
2. An independent options assessment process should be undertaken to assess alternative locations for the ventilation stack and portals.
3. To undertake a Life Cycle Analysis and assessment for the provision of filtration
4. A long term health study on children and residents in areas impacted by stack discharges be included as part of the conditions of approval.
5. A comprehensive air quality monitoring program is developed and implemented.
6. An independent review of the ventilation system is undertaken to ensure that NorthConnex's claim of no portal emissions is justified.
7. Portal emissions from NorthConnex in the future are banned.
8. The Submissions Report/Preferred Project be exhibited to allow the community to respond to the revised information contained in the report.
9. The Department does not approve the project in its current form as it clearly does not meet the principles of Ecologically Sustainable Development as required by the Environmental Planning and Assessment Act.

ROSA AND LARRY
119a Boundary Rd, Wahroonga NSW 2076
Attachments
Johannes Kaiser
Object
Wahroonga , New South Wales
Message
Please note: below stated information is also provided via attached PDF.


28 August 2014

Director - Infrastructure Projects
Department of Planning and Environment
Number: SSI 13_6136
Major Projects Assessment
GPO Box 39
SYDNEY NSW 2001

Via online form: http://majorprojects.planning.nsw.gov.au/index.pl?action=view_job&job_id=6136

NorthConnex Application Number: SSI 13_6136

Please find below my submission in response to the exhibition of the EIS for NorthConnex.

Firstly I would like to state I object to the project as described in the EIS.

I have a high level of concern regarding the following issues and request that these be considered by NorthConnex and the Department of Planning. In regards to the NorthConnex tunnel, I am concerned about:

1. Placement of the northern ventilation stack in the centre of a densely populated residential area in Wahroonga, where 9,300 school children will be exposed, as well as multiple aged care facilities, hospitals, businesses and homes.

2. The placement of the northern ventilation stack in a valley in Wahroonga where there are often low wind speeds, which will result in poor dispersion and exposure to community to high levels of tunnel emission.

3. I am highly concerned about the multiple large scale research studies that suggest the impacts of air pollutants on health are serious. These include increased death from heart disease, increased risks of lung cancer, stroke, poor lung growth in children, increased asthma, and recent research suggesting low birth weight for pregnant women, increased autism, and congenital heart defects. These studies confirm air pollutants have prothrombotic and inflammatory effects on humans which cause the above health problems.

4. I am concerned about the project including future provisions for portal emissions in densely populated areas, which will result in emissions remaining at ground level, and hence exposing the local population to pollutants. I am also concerned that NorthConnex's claim that there will no portal emissions from current proposal cannot be verified.

5. I am concerned about the large amount of diesel emissions which will be emitted from the NorthConnex tunnel, as it is being designed for heavy freight to bypass Pennant Hills Rd. Diesel emissions have been classified as carcinogenic by the World Health Organisation, and also contain a larger number of fine particles which penetrate deep into lung tissue and remain there causing inflammation.

6. I am concerned about the air quality within the tunnel which is shown in the EIS to have exceedences above standards for pollutants such as NO2, and haze from particulate matter at the ends of the tunnel.

7. I am concerned about the multiple flaws in the air quality modelling of the northern stack in the EIS. These include:
a) extrapolation of meteorological data from other weather stations which do not reflect the local meteorology, local topography, and the valley location.
b) The use of a coarse topographical model
c) The failure to consider polluted intake air from the Pennant Hills/M2 interchange as part of the project contribution to air quality at Wahroonga
d) the background air quality being based on air quality at Lindfield and Prospect and the lack of any actual data on PM2.5

8. I am concerned that a full and transparent options assessment process was not undertaken to assess alternative designs for the project. Unlike other tunnel projects in Sydney there are alternatives for locating the stack and portals in non-residential areas.

9. I am concerned that the justification for not providing filtration for the stacks is cursory and unconvincing.

To address my/our concerns I request that the following actions are undertaken:

1. The air quality and human health impact assessment need to be revised to address the issues raised above.
2. An independent options assessment process should be undertaken to assess alternative locations for the ventilation stack and portals.
3. To undertake a Life Cycle Analysis and assessment for the provision of filtration
4. A long term health study on children and residents in areas impacted by stack discharges be included as part of the conditions of approval.
5. A comprehensive air quality monitoring program is developed and implemented.
6. An independent review of the ventilation system is undertaken to ensure that NorthConnex's claim of no portal emissions is justified.
7. Portal emissions from NorthConnex in the future are banned.
8. The Submissions Report/Preferred Project be exhibited to allow the community to respond to the revised information contained in the report.
9. The Department does not approve the project in its current form as it clearly does not meet the principles of Ecologically Sustainable Development as required by the Environmental Planning and Assessment Act.

Johannes Kaiser
37-41 Millewa Ave, Wahroonga 2076
Attachments
Name Withheld
Object
wahrooonga , New South Wales
Message
28 August 2014

Director - Infrastructure Projects
Department of Planning and Environment
Number: SSI 13_6136
Major Projects Assessment
GPO Box 39
SYDNEY NSW 2001

Via online form: http://majorprojects.planning.nsw.gov.au/index.pl?action=view_job&job_id=6136

NorthConnex Application Number: SSI 13_6136

Please find below my submission in response to the exhibition of the EIS for NorthConnex.

Firstly I would like to state I object to the project as described in the EIS.

I have a high level of concern regarding the following issues and request that these be considered by NorthConnex and the Department of Planning. In regards to the NorthConnex tunnel, I am concerned about:

1. Placement of the northern ventilation stack in the centre of a densely populated residential area in Wahroonga, where 9,300 school children will be exposed, as well as multiple aged care facilities, hospitals, businesses and homes.

2. The placement of the northern ventilation stack in a valley in Wahroonga where there are often low wind speeds, which will result in poor dispersion and exposure to community to high levels of tunnel emission.

3. I am highly concerned about the multiple large scale research studies that suggest the impacts of air pollutants on health are serious. These include increased death from heart disease, increased risks of lung cancer, stroke, poor lung growth in children, increased asthma, and recent research suggesting low birth weight for pregnant women, increased autism, and congenital heart defects. These studies confirm air pollutants have prothrombotic and inflammatory effects on humans which cause the above health problems.

4. I am concerned about the project including future provisions for portal emissions in densely populated areas, which will result in emissions remaining at ground level, and hence exposing the local population to pollutants. I am also concerned that NorthConnex's claim that there will no portal emissions from current proposal cannot be verified.

5. I am concerned about the large amount of diesel emissions which will be emitted from the NorthConnex tunnel, as it is being designed for heavy freight to bypass Pennant Hills Rd. Diesel emissions have been classified as carcinogenic by the World Health Organisation, and also contain a larger number of fine particles which penetrate deep into lung tissue and remain there causing inflammation.

6. I am concerned about the air quality within the tunnel which is shown in the EIS to have exceedences above standards for pollutants such as NO2, and haze from particulate matter at the ends of the tunnel.

7. I am concerned about the multiple flaws in the air quality modelling of the northern stack in the EIS. These include:
a) extrapolation of meteorological data from other weather stations which do not reflect the local meteorology, local topography, and the valley location.
b) The use of a coarse topographical model
c) The failure to consider polluted intake air from the Pennant Hills/M2 interchange as part of the project contribution to air quality at Wahroonga
d) the background air quality being based on air quality at Lindfield and Prospect and the lack of any actual data on PM2.5

8. I am concerned that a full and transparent options assessment process was not undertaken to assess alternative designs for the project. Unlike other tunnel projects in Sydney there are alternatives for locating the stack and portals in non-residential areas.

9. I am concerned that the justification for not providing filtration for the stacks is cursory and unconvincing.

To address my/our concerns I request that the following actions are undertaken:

1. The air quality and human health impact assessment need to be revised to address the issues raised above.
2. An independent options assessment process should be undertaken to assess alternative locations for the ventilation stack and portals.
3. To undertake a Life Cycle Analysis and assessment for the provision of filtration
4. A long term health study on children and residents in areas impacted by stack discharges be included as part of the conditions of approval.
5. A comprehensive air quality monitoring program is developed and implemented.
6. An independent review of the ventilation system is undertaken to ensure that NorthConnex's claim of no portal emissions is justified.
7. Portal emissions from NorthConnex in the future are banned.
8. The Submissions Report/Preferred Project be exhibited to allow the community to respond to the revised information contained in the report.
9. The Department does not approve the project in its current form as it clearly does not meet the principles of Ecologically Sustainable Development as required by the Environmental Planning and Assessment Act.

XXXX
XXXXX
Attachments
Name Withheld
Comment
West Pennant Hills , New South Wales
Message
Dear Director DP&E.

Ref: Air Quality

This submission split into five parts in order to identify how the high air quality (2014) standard can be maintain/monitor/control within 2 KM surrounding resident area when the high concentrated pollutant emitted from both (35M height) ventilation outlets for NorthConnex tunnel operation in 2019.

This submission expect to give some useful idea for the NorthConnex project team such that they can make a further detail step to ensure the design of tunnel ventilation outlets to maintain the good Air Quality standard (2014) within 2KM surrounding resident area or less impact when the high concentrated pollutant emitted from the tunnel ventilation outlet in 2019.

Best Regard,


XXXXX
Attachments
Name Withheld
Comment
West Pennant Hills , New South Wales
Message
This submission split into five parts in order to identify how the high air quality (2014) standard can be maintain/monitor/control within 2 KM surrounding resident area when the high concentrated pollutant emitted from both (35M height) ventilation outlets for NorthConnex tunnel operation in 2019:
Attachments
Name Withheld
Object
Wahroonga , New South Wales
Message
See attached submission
Attachments
Michael Freestone
Object
Jacqueline Fox
Object
Wahroonga , New South Wales
Message
Please refer to letter uploaded
Attachments
Leonard Kwok Leung Tang
Object
, New South Wales
Message
I object many aspects of this projects with the details attached in the submissions
Attachments
Irene Zhao
Object
West Pennant Hills , New South Wales
Message
Dear Sir / Madam,
PROPOSED NORTHCONNEX M1 / M2 TUNNEL PROJECT - Application Number - SSI 13_6136
We object to many aspects of this project
Our concerns fall into six sections. These are:
1. The Environmental Impact Statement (EIS) does not show any connection between the ventilation stack and the southbound tunnel which is 250 metres away. Will the polluted air be allowed to flow like an invisible sewer through West Pennant Hills, North Rocks, Carlingford and Beecroft?
ACTION: Provision of diagrams and detailed description of what ventilation is proposed for the southbound tunnel at the Southern Interchange. We would liketThe opportunity to lodge further submissions once that has been provided.
2. The ventilation stack should be located immediately above the tunnels on the corner of the Pennant Hills Golf Course and the M2. NorthConnex admit that this is the most efficient location for the stack. Why is the stack not being correctly located and positioned as far as possible away from homes?
ACTION: Purchase of golf course land to position the stack in its most effective location.
3. The ventilation stack must be filtered. It is accepted scientifically and medically that there are no safe levels of diesel emissions which are a Group 1 carcinogen.
ACTION: Filtration of the ventilation stacks to provide a safe and sustainable environment.
4. The NorthConnex proposal to use Aiken, Oakes, Eaton and Karloon Roads for construction traffic is totally unacceptable. We propose that construction vehicles turn right on to the M2 from Pennant Hills Road, drive to the Windsor Road Passover, double back along the M2 and access the construction compound directly by the creation of a ramp from the M2 straight into the construction compound. Trucks heading north should also exit via this ramp onto the M2 if they do not have direct access to Pennant Hills Road.
ACTION: Adoption of our proposal as detailed above. The route proposed by NorthConnex must not be used.
5. The restoration and preservation of the landscape around residential properties, especially along the M2 and those homes immediately close to the construction compounds and boundary walls, is of vital importance.
ACTION: Landscaping on the residential boundary of NorthConnex buildings, walls, compounds etc. to maintain the leafy outlook of homes and the parkland look of our suburbs.
6. The general public, and the local community in particular, must be kept informed of the changes made to the EIS as a result of the submissions sent by concerned residents and consulted going forward.
ACTION: As the EIS does not provide sufficient detail, on-going community consultation is seen as important and necessary. More information and detail must be provided.
We would appreciate a detailed review of our concerns and we await the supply of the requested additional information.
Attachments
Name Withheld
Comment
Pennant Hills , New South Wales
Message
Submission is attached.
Attachments
Name Withheld
Object
Wahroonga , New South Wales
Message
Dear Sir

On the 31st August I submitted a response to the above.

I was unable to attach my document detailing my comments and included it into this text box which may not have been easy to read.

I have now saved this file as a PDF document and am resubmitting my response.

Attachments
ADAM CALY
Comment
WAHROONGA , New South Wales
Message
I object to NorthConnex installing unfiltered exhaust stack at the Wahroonga end of the proposed M1 to M2 Tunnel under Penent Hills road. See my submissions and objections attached.
Attachments
Hugh Playford
Object
Wahroonga , New South Wales
Message
1 September 2014

Director - Infrastructure Projects
Department of Planning and Environment
Number: SSI 13_6136
Major Projects Assessment
GPO Box 39
SYDNEY NSW 2001


NorthConnex Application Number: SSI 13_6136

Please find below my submission in response to the exhibition of the EIS for NorthConnex.

Firstly I would like to state we object to the project as described in the EIS.

I have a high level of concern regarding the following issues and request that these be considered by NorthConnex and the Department of Planning. In regards to the NorthConnex tunnel, I am concerned about:

1. Placement of the northern ventilation stack in the center of a densely populated residential area in Wahroonga, where 9,300 school children will be exposed, as well as multiple aged care facilities, hospitals, businesses and homes.

2. The placement of the northern ventilation stack in a valley in Wahroonga where there are often low wind speeds, which will result in poor dispersion and exposure to community to high levels of tunnel emission.

3. I am highly concerned about the multiple large scale research studies that suggest the impacts of air pollutants on health are serious. These include increased death from heart disease, increased risks of lung cancer, stroke, poor lung growth in children, increased asthma, and recent research suggesting low birth weight for pregnant women, increased autism, and congenital heart defects. These studies confirm air pollutants have prothrombotic and inflammatory effects on humans which cause the above health problems.

4. I am concerned about the project including future provisions for portal emissions in densely populated areas, which will result in emissions remaining at ground level, and hence exposing the local population to pollutants. I am also concerned that NorthConnex's claim that there will no portal emissions from current proposal cannot be verified.

5. I am concerned about the large amount of diesel emissions which will be emitted from the NorthConnex tunnel, as it is being designed for heavy freight to bypass Pennant Hills Rd. Diesel emissions have been classified as carcinogenic by the World Health Organisation, and also contain a larger number of fine particles which penetrate deep into lung tissue and remain there causing inflammation.

6. I am concerned about the air quality within the tunnel which is shown in the EIS to have exceedences above standards for pollutants such as NO2, and haze from particulate matter at the ends of the tunnel.

7. I am concerned about the multiple flaws in the air quality modelling of the northern stack in the EIS. These include:
a) extrapolation of meteorological data from other weather stations which do not reflect the local meteorology, local topography, and the valley location.
b) The use of a coarse topographical model
c) The failure to consider polluted intake air from the Pennant Hills/M2 interchange as part of the project contribution to air quality at Wahroonga
d) the background air quality being based on air quality at Lindfield and Prospect and the lack of any actual data on PM2.5

8. I am concerned that a full and transparent options assessment process was not undertaken to assess alternative designs for the project. Unlike other tunnel projects in Sydney there are alternatives for locating the stack and portals in non-residential areas.

9. I am concerned that the justification for not providing filtration for the stacks is cursory and unconvincing.

To address my/our concerns I request that the following actions are undertaken:

1. The air quality and human health impact assessment need to be revised to address the issues raised above.
2. An independent options assessment process should be undertaken to assess alternative locations for the ventilation stack and portals.
3. To undertake a Life Cycle Analysis and assessment for the provision of filtration
4. A long term health study on children and residents in areas impacted by stack discharges be included as part of the conditions of approval.
5. A comprehensive air quality monitoring program is developed and implemented.
6. An independent review of the ventilation system is undertaken to ensure that NorthConnex's claim of no portal emissions is justified.
7. Portal emissions from NorthConnex in the future are banned.
8. The Submissions Report/Preferred Project be exhibited to allow the community to respond to the revised information contained in the report.
9. The Department does not approve the project in its current form as it clearly does not meet the principles of Ecologically Sustainable Development as required by the Environmental Planning and Assessment Act.

Hugh Playford
PO Box 176
Wahroonga
NSW 2076
Attachments
Graham Broome
Comment
, New South Wales
Message
Please see attachments re landscaping.
Attachments
Michael Foskett
Comment
Thornleigh , New South Wales
Message
Please find attached my comments regarding concerns about the impact of heavy vehicles using Loch Maree Ave to access the work site at the Trelawney St site during construction of the tunnel.
Attachments
Name Withheld
Object
Wahroonga , New South Wales
Message
Please see attached letter
Attachments
Allen Armstrong
Object
Margaret Dobbin
Comment

Pagination

Project Details

Application Number
SSI-6136
Assessment Type
State Significant Infrastructure
Development Type
Road transport facilities
Local Government Areas
Hornsby Shire
Decision
Approved
Determination Date
Decider
Minister
Last Modified By
SSI-6136-Mod-3
Last Modified On
18/12/2019

Contact Planner

Name
Dominic Crinnion